RRC CO INC FORMERLY: R R C CONST is listed as a company organization in Philippine public procurement records on this site, with 86 linked DPWH project(s) totaling about ₱3,153,922,121.25. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
RRC CO INC FORMERLY: R R C CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 86
- Total value
- ₱3,153,922,121.25
- Published flags
- 0
- Region
- Isabela 2nd DEO · Region II
Public Record Grade
A transparent, data-derived summary of reported public records for RRC CO INC FORMERLY: R R C CONST — not an accusation or finding of wrongdoing.
Score: 87.80 / 100 · Projects in sample: 86 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 81/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 81
- lateCompletedProjects
- 13
- onTimeCompletedProjects
- 64
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 82
- pastTargetOngoingProjects
- 5
- undatedCompletedProjectsExcluded
- 4
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 86
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 86
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 86
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 86
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 84 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT CONSTRUCTION OF MISSING LINKS/NEW ROAD - ROXAS-PARACELIS ROAD, ISABELA22B00022 · ₱99,442,499.59 · mapped
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTRO24BF0068 · ₱96,499,937.14 · mapped
- Construction of Siffu River Flood Control Project, Barangay Masigun Phase II, Sta. 0+960 - Sta. 1+760, Roxas, Isabela24BF0063 · ₱96,480,164.87 · mapped
- Construction of Mallig River Flood Control Project (Olango Section), Mallig, Isabela22BF0076 · ₱96,467,970.82 · mapped
- Construction of Pinacanauan River Flood Control Project, Barangay Dipusu, San Mariano, Isabela23BG0126 · ₱96,399,710.65 · mapped
- Construction of Pinacanauan River Flood Control Project, Barangay Zone 1, San Mariano, Isabela23BG0128 · ₱96,301,840.45 · mapped
- Construction of Siffu River Flood Control Project, Barangay Rizal Phase II, Sta. 2+000 - Sta. 2+800, Roxas, Isabela24BF0032 · ₱96,165,781.02 · mapped
- OO1: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MALLIG BYPASS ROAD, PACKAGE 1, ISABELA24BF0028 · ₱94,432,627.69 · mapped
- OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, (SAN JOSE SECTION PHASE II) ROXAS, ISABELA25BF0057 · ₱93,604,834.59 · mapped
- OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (MARCOS SECTION PHASE 2), BARANGAY MARCOS, ROXAS, ISABELA25BF0053 · ₱93,603,711.06 · mapped
- OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (MARCOS SECTION PHASE 1), BARANGAY MARCOS, ROXAS, ISABELA25BF0052 · ₱93,598,439.23 · mapped
- MFO 1-NETWORK DEV'T:WIDENING OF NAT'L RDS., SECONDARY RDS. ALONG CABAGAN-STA. MARIA RD15B00087 · ₱75,295,569.41 · mapped
- CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BRIDGE, BARANGAY DISULAP, SAN MARIANO, ISABELA24BG0132 · ₱72,316,888.56 · mapped
- NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS: ROXAS-PARACELIS ROAD INLCUDING ROW, ISABELA, STA. 000+000-STA. 001+200, PROVINCE OF ISABELA18B00051 · ₱70,239,683.51 · mapped
- ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEV'T PROGRAM: ROAD WIDENING: PRIMARY ROADS ALONG SANTIAGO-TUGUEGARAO ROAD K0398+000-K0398+050=STA. 398+000-STA. 398+053.10, PROVINCE OF ISABELA18B00043 · ₱66,348,003.07 · mapped
- MF0 1-NETWORK DEV'T: WIDENING OF NAT'L RD., TERTIARY RD. ALONG ILAGAN-DELFIN ALBANO-MALLIG RD.15B00094 · ₱65,617,355.17 · mapped
- OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0378 + 690 - K0380 + 00023BG0144 · ₱64,815,845.25 · mapped
- OO 1: ENSURE SAFE AND RELIABLE NAT'L ROAD SYSTEM: NETWORK DEV'T: ROAD WIDENING: TERTIARY ROADS ALONG ILAGAN-DELFIN ALBANO-MALLIG ROAD, K0417+(-023.20)-K0418+000=STA. 417+(-023.20)-STA. 418+003, K0419+673-K0420+316.80=STA. 419+673-STA. 420+301, DELFIN ALBA18B00009 · ₱58,941,184.51 · mapped
- ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4(HDM-4)-PRIMARY ROADS,SANTIAGO-TUGUEGARAO ROAD K0395+1417BF0030 · ₱52,760,879.31 · mapped
- ENSURE SAFE AND RELIABLE ROAD NETWORK SYSTEM: NETWORK DEVELOPMENT- ROAD WIDENING-PRIMARY ROADS ALONG SANTIAGO -TUGUEGARAO ROAD (S00760LZ) K0372+458-K0373+000, K0374+000 -K0374+405, K0376+780-K0377+000, K0379+000-K0379+712, SAN MANUEL AND ROXAS, ISABELA19BF0031 · ₱50,669,597.96 · mapped
- Construction of Siffu River Flood Control Project (Suerte Section), Phase II, Sta. 0+000 - Sta. 0+400, Barangay Suerte, Quirino, Isabela,23BF0018 · ₱48,248,898.30 · mapped
- Construction of Flood Control Structure, Phase 2, Sta. 0+200 - Sta. 0+800, Barangay Kalabasa, Aurora, Isabela23BF0001 · ₱48,233,662.14 · mapped
- Construction of Siffu River Flood Control Project (Camaal Section), Phase II, Sta. 0+000 - Sta. 0+400, Barangay Camaal, Quirino, Isabela,23BF0002 · ₱48,232,335.87 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS-ROXAS-PARACELIS ROAD, ISABELA; STA. 000+159-STA. 001+540; STA. 004+230-STA. 004+668.9421B00031 · ₱47,908,197.58 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: CONSTRUCTION/ UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS ALONG SANTIAGO - TUGUEGARAO ROAD (18BF0081 · ₱47,836,330.16 · mapped
- CONSTRUCTION OF STA. MARIA CAGAYAN RIVER BASIN FLOOD CONTROL PROJECT (MOZZOZZIN, SAN RAFAEL, CALAMAGUI AND SAN ISIDRO), STA. MARIA, ISABELA20BE0001 · ₱46,745,996.96 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT (DEL PILAR SECTION), SAN MARIANO, ISABELA, SAN MARIANO, ISABELA18BF0063 · ₱46,501,000.00 · mapped
- Construction of Cagayan River Flood Control Project Brgy. Labinab Grande, Reina Mercedes, Isabela21BG0023 · ₱46,493,250.44 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER FLOOD CONTROL PROJECT, BRGY. MINANGA SECTION, NAGUILIAN, ISABELA20BG0013 · ₱45,663,814.49 · mapped
- ORGANIZATIONAL OUTCOME 2: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF CASILI FLOOD CONTROL PROJECT IN MALLIG, ISABELA20BF0020 · ₱44,679,187.20 · mapped
- Construction of Cagayan River Flood Control Project, Barangay Palattao, Naguilian, Isabela23BG0014 · ₱44,080,822.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BENITO SOLIVEN BYPASS ROAD, BENITO SOLIVEN, ISABELA20BG0080 · ₱42,988,584.21 · mapped
- ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS ALONG NAGUILIAN-SAN MARIANO ROAD; K0397+216-K0397+276, K0401+080-K0401+225, K0401+-145-K0401+080, K0401+300-K0401+17BF0048 · ₱42,367,859.87 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF MISSING LINKS/NEW ROAD-ROXAS-PARACELIS ROAD INCLUDING ROW, ISABELA, STA.1+200-STA.7+080, ROXAS, ISABELA19B00040 · ₱42,070,908.07 · mapped
- Construction of Siffu River Flood Control Structure (Sitio Pakak Section) Brgy. Nuesa, Roxas, Isabela22BF0025 · ₱41,655,583.57 · mapped
- NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING ALONG PRIMARY ROADS: SANTIAGO - TUGUEGARAO ROAD (S00760LZ) K0411+000 - K0412+105, QUEZON, ISABELA18BF0115 · ₱40,595,252.60 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES - SAN JOSE BR. (B05098LZ) ALONG NAGUILIAN - SN MARIANO RD., SAN MARIANO, ISABELA23BG0111 · ₱39,180,316.73 · mapped
- OO1: NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MALLIG BYPASS ROAD, PACKAGE 1, ISABELA, MALLIG, ISABELA25BF0102 · ₱38,023,913.53 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF MISSING LINKS/NEW ROADS - ROXAS-PARACELIS ROAD, ISABELA; STA. 3+400 - STA.4+230, ROXAS, ISABELA20B00016 · ₱37,651,124.52 · mapped
- NETWORK DEVELOPMENT: OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE-TERTIARY ROAD ALONG NAGUILIAN-SAN MARIANO ROAD, K0408+000-K0409+000, K0409+794-K0409+821, K0409+821-K0409+934, K0409+976-K0410+112, K0410+203-K0410+280, K0410+280-K0410+520, K0410+540-K0417BF0032 · ₱36,560,369.93 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS (KALSADA PATUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - ACCESS ROAD LEADING TO PALANAN AIRPORT, PALANAN, ISABELA23BG0169 · ₱34,294,988.78 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION/ REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - GAMU-ROXAS RD (S00783LZ) - K0399 + 000 - K0399 + 665, K0402 + 420BF0001 · ₱33,205,985.56 · mapped
- REHABILITATION (COMPLETION) OF DPWH ISABELA 2ND DEO BUILDING, ROXAS, ISABELA24BF0130 · ₱29,392,740.03 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. AUITAN, SAN PABLO, ISABELA18BE0071 · ₱28,212,070.15 · mapped
- PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS -CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF BARAMBAN CREEK FLOOD CONTROL PROJECT (BRGY. RIZAL SECTION), ROXAS, ISABELA19BF0044 · ₱25,425,523.85 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS- ROXAS-PARACELIS ROAD, ISABELA23B00003 · ₱24,102,442.47 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING(GYMNASIUM) CABAGAN, ISABELA18BE0112 · ₱23,748,929.00 · mapped
- ORGANIZATINAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS MALLIG BYPASS ROAD,ISABELA22BF0048 · ₱23,467,430.43 · mapped
- RECONST'N OF DAMAGED PAVED NAT'L RD. INCLUDING DRAINAGE BASED ON PVM'T MNG'T SYSTEM(HDM-4) INTERMITE15B00058 · ₱21,888,462.52 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - SANTIAGO - TUGUEGARAO RD. STA. MARIA, ISABELA KO419+234-KO419+254, KO419+770-KO419+796, KO422+766-KO422+784, KO424+780-KO424+931, KO4220BE0016 · ₱21,712,852.79 · mapped
Equipment & capacity
PCAB license
- License no.
- 24369
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Dec 18, 2026
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 24369); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
16 evaluations listed across 6 GPPB CPES releases; average final rating 92.2% over 4 rated projects; 16 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| May 1, 2025 | DPWH | ₱29,392,740.00 | On-going | 94.2% | — | 40th, p. 275 |
| Feb 11, 2025 | DPWH | ₱96,486,004.00 | On-going | 90.0% | — | 40th, p. 275 |
| Feb 11, 2025 | DPWH | ₱72,316,889.00 | On-going | 91.5% | — | 39th (rev), p. 190 |
| Oct 24, 2024 | DPWH | ₱96,479,614.00 | On-going | 90.8% | — | 40th, p. 274 |
| Oct 2, 2024 | AFAB | ₱8,224,078.00 | Completed | 94.5% | 94.5% | 38th, p. 215 |
| Aug 15, 2024 | DPWH | ₱96,486,004.00 | On-going | 87.5% | — | 38th, p. 215 |
| Aug 15, 2024 | DPWH | ₱94,432,628.00 | On-going | 73.0% | — | 38th, p. 215 |
| May 17, 2024 | DPWH | ₱6,010,119.00 | On-going | 98.2% | — | 38th, p. 215 |
| Jun 5, 2023 | DPWH | ₱96,445,593.00 | Final | 91.5% | 94.4% | 36th, p. 184 |
| Mar 14, 2023 | DPWH | ₱96,467,971.00 | On-going | 96.4% | — | 35th, p. 153 |
| Jun 30, 2022 | DPWH | ₱41,655,584.00 | On-going | 91.2% | — | 34th, p. 77 |
| Mar 4, 2020 | DPWH | ₱25,425,523.00 | On-going | 85.3% | — | 40th, p. 275 |
Showing the 12 most recent of 16.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →