JTA BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 112 linked DPWH project(s) totaling about ₱2,048,234,053.54. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
JTA BUILDERS
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 112
- Total value
- ₱2,048,234,053.54
- Published flags
- 0
- Region
- Cagayan de Oro City 1st DEO · Region X
Online presence
Google Maps: JTA BuildersGoogle Maps, 2026-10-22
J.C. Marfori Building, Corales Avenue, Corner Hayes Street, Cagayan De Oro City, 9000 Misamis Oriental
Public Record Grade
A transparent, data-derived summary of reported public records for JTA BUILDERS — not an accusation or finding of wrongdoing.
Score: 84.20 / 100 · Projects in sample: 112 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 72.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 72.6
- lateCompletedProjects
- 54
- onTimeCompletedProjects
- 55
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 111
- pastTargetOngoingProjects
- 2
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 112
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 112
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 112
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 112
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 41 of 93 geotagged projects (largest by contract value) — Open full map
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS, PRIMARY ROADS, SANTIAGO-TUGUEGARAO ROAD (JCT. KALINGA-TUGUEGARAO SECTION, K0437+(-031)-K0437+100, K0437+900-K0438+100, K0438+700-18BD0075 · ₱84,903,494.98 · mapped
- NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT, PRIMARY ROADS, KALINGA-CAGAYAN ROAD (CALANAN-ENRILE SECTION), K0438+010 - K0441+576, K0441+600 - K0443+76518BD0080 · ₱70,063,815.05 · mapped
- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES REHABILITATION OF MARAWI- MASIU ROAD, TAMPARAN25K00375 · ₱69,296,465.23 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) OF DANCALAN-CANDONI-DAMUTAN VALLEY ROAD, K0145+300 - K0147+590, CANDONI, NEGROS OCCIDENTAL16R00005 · ₱67,960,445.16 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM, CANDIJAY, BOHOL24HB0136 · ₱62,724,072.40 · mapped
- ASSET PRESERVATION:REHAB/RECONSTRUCTION/UPGRADING OF DAMAGED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PMS/HDM-4, BAYBAYO-BAGGAO-DALIN-STA MARGARITA ROAD, K0519+591 TO K0521+655; K0522+697 TO K0523+223, BAGGAO, CAGAYAN15B00049 · ₱51,857,400.54 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM BIP - PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III) REHABILITATION OF WATER SYSTEM, CANDIJAY, BOHOL23HB0126 · ₱49,499,433.55 · mapped
- CONSTRUCTION OF MULTI-PURPOSE FACILITY (PUBLIC MARKET AND TERMINAL), BRGY. LAILA LUMBAC TO APA MIMBALAY, MASIU, LANAO DEL SUR23K00336 · ₱49,082,900.95 · mapped
- CONSTRUCTION OF WATER SUPPLY SYSTEM, BARANGAY TABLON, CAGAYAN DE ORO CITY23KD0044 · ₱47,530,000.00 · mapped
- CONSTRUCTION OF WATER SUPPLY SYSTEM BARANGAY PUERTO, CAGAYAN DE ORO CITY23KD0043 · ₱47,480,960.63 · mapped
- CONSTRUCTION OF CLASSROOMS (BATCH 13) 4STY-20 CL,VN CHAVEZ MCS, VILLANUEVA,MISAMIS ORIENTAL17KL0169 · ₱45,928,265.79 · mapped
- REHABILITATION OF CADAYONAN-MAGANDING-MADAYA FMR, MUNAI, LANAO DEL NORTE18KG0100 · ₱45,499,253.27 · mapped
- CONSTRUCTION OF 4-STY 8-CLASSROOMS LABORATORY BLDG. AT ISULAN NHS, ISULAN, SULTAN KUDARAT.18MF0100 · ₱45,278,350.72 · mapped
- IMPROVEMENT/WIDENING OF NAT'L. RD. SEC. RD. - ILOILO-EAST COAST CAPIZ ROAD, KO124+481-KO125+51516GD0006 · ₱41,254,691.57 · mapped
- CONSTRUCTION OF CLASSROOMS: 4STY20CL WEST CITY CENTRAL SCHOOL, BRGY. CARMEN, CAGAYAN DE ORO CITY17KH0069 · ₱40,411,487.71 · mapped
- CONSTRUCTION OF ONE (1) UNIT FOUR (4) STOREY TWENTY FOUR (24) CLASSROOMS, CABATUAN NATIONAL COMPREHENSIVE HIGH SCHOOL17GG0074 · ₱38,601,429.03
- CONSTRUCTION OF CLASSROOMS: 4STY16CL CANITOAN NHS (3 - HE CL, 1 - LEC RM, 2 - SPEECH LAB, 4 - SCIENCE LAB)17KH0086 · ₱36,821,081.29 · mapped
- CONSTRUCTION OF CLASSROOMS: 4STY16CL PEDRO OLOY N. ROA, SR., HS (3 - HE CL, 1 - LEC RM, 2 - SPEECH LAB, 4 - SCIENCE LAB), CAGAYAN DE ORO CITY17KH0085 · ₱36,820,081.29 · mapped
- CONST. OF 3-STY 6-CLASSROOMS LABORATORY BUILDING AT LAGUILAYAN NHS, ISULAN, SULTAN KUDARAT.18MF0090 · ₱35,328,308.32 · mapped
- CONST. OF 3-STY 6-CLASSROOMS LABORATORY BLDG. AT ISULAN NHS, ISULAN, SULTAN KUDARAT.18MF0086 · ₱35,327,595.84 · mapped
- CONSTRUCTION OF CLASSROOMS (BATCH 13) 3STY-12CL, VN CHAVEZ MCS, VILLANUEVA,MISAMIS ORIENTAL17KL0188 · ₱33,997,359.50 · mapped
- CONSTRUCTION OF WATER SUPPLY SYSTEM LEVEL 3 (PHASE-2) GOA AND SAN JOSE, CAMARINES SURGOA AND SAN JOSE, CAMARINES SUR25FG0055 · ₱33,233,653.62 · mapped
- PROPOSED CONST'N OF REG'L EVACUATION CENTER, BRGY. LALLAYUG, TUAO, PROVINCE OF CAGAYAN17B00048 · ₱31,705,909.68 · mapped
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE, PRIMARY ROADS, KALINGA-CAGAYAN ROAD (CALANAN-ENRILE SECTION), K0438+010 -K0440+000, K0440+415 - K0441+498,K0441+668 -K0442+81318BD0031 · ₱31,442,534.50 · mapped
- CONSTRUCTION OF CLASSROOMS: 4STY12CL WEST CITY CENTRAL SCHOOL, BRGY. CARMEN, CAGAYAN DE ORO CITY17KH0090 · ₱30,150,717.51 · mapped
- CONSTRUCTION OF LEVEL III WATER SUPPLY SYSTEM, MAGSAYSAY, MISAMIS ORIENTAL20KK0054 · ₱29,180,804.91 · mapped
- CONSTRUCTION OF CLASSROOMS: 3STY12CL CARMEN NHS (3-HE RM, 1-LEC RM, 2-SPEECH LAB, 2-SCIENCE LAB), CAGAYAN DE ORO CITY17KH0082 · ₱29,039,056.00 · mapped
- CONST. OF WATER SUPPLY SYSTEM, ALTAVAS, AKLAN17GA0075 · ₱28,931,729.91 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT -4 (PMS/HDM-4), BURGOS-LIDLIDDA ROAD, K0361+(-412)-K0362+655 & K0365+910-K0366+60716AD0039 · ₱28,314,369.33 · mapped
- CONSTRUCTION OF WATER SYSTEM, BARANGAY POBLACION 1, 2 & 3, EB MAGALONA, NEGROS OCCIDENTAL18GK0134 · ₱28,197,623.50 · mapped
- CONSTRUCTION OF LEVEL II WATER SYSTEM OF BRGY. KALANGANAN 2, COTABATO CITY18MA0043 · ₱27,913,042.68 · mapped
- CONSTRUCTION OF ENVIRONMENT AND GREEN TECHNOLOGY BUILDING AT PHILIPPINE NORMAL UNIVERSITY - VISAYAS, CADIZ CITY17G00105 · ₱26,984,598.11
- CONST OF 2 STORIES -10 CL(2 UNITS) SB ELEM,JUNIOR&SENIOR HS, BAGGAO NAS, BAGGAO,CAG16BB0023 · ₱25,826,522.18 · mapped
- WIDENING OF MANDURRIAO - PAKIAD ROAD, K0006+(-099) - K0007 + 52816GJ0044 · ₱23,402,760.00 · mapped
- CONSTRUCTION OF ONE (1) UNIT THREE (3) STOREY FIFTEEN (15) CLASSROOMS, CALINOG NATIONAL COMPREHENSIVE HIGH SCHOOL, BRGY. SIMSIMAN, CALINOG, ILOILO16GG0144 · ₱22,722,324.60
- CLUSTERP CONC. OF VARIOUS LOCAL ROADS IN MADAMBA,1)CONC. OF BALINTAD-LIANGAN RD,MADAMBA,2)CONC. OF15K00525 · ₱22,259,640.79 · mapped
- CONSTRUCTION OF ONE (1) UNIT THREE (3) STOREY FIFTEEN (15) CLASSROOMS, CABATUAN NATIONAL COMPREHENSIVE HIGH SCHOOL, SERRANO ST., CABATUAN, ILOILO16GG0143 · ₱21,492,305.87
- CONST. OF VARIOUS INFRA INCL. LOCAL RDS,CONC. OF GANASSI MUN. RD,GANASSI,LDS 2ND LD16K00001 · ₱20,823,528.13
- COMPLETION/IMPROVEMENT/REPAIR OF VARIOUS MULTI-PURPOSE BUILDING17BH0003 · ₱20,583,643.16 · mapped
- CONCRETING OF CROSSING BOUGAINVILLA TO TILAKAP ROAD FMR, KIDAPAWAN CITY18MC0134 · ₱19,898,874.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: POBLACION T'BOLI TO BRGY. LAMHAKU LEADING TO EL KINI HOT SPRING ROAD, LAMHAKU, BRGY. T'BOLI, SOUTH COTABATO18MG0089 · ₱19,539,277.73 · mapped
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES:JCT. SANTIAGO-BANAYOYO-LIDLIDDA-SAN EMILIO-QUIRINO ROAD, K0359+100 - K0359+140, K0372+150 -K0372+170, K0372+400 - K0372+420, K0372+950-K0372+96515AD0204 · ₱19,011,130.98 · mapped
- CONSTRUCTION OF 3STY 3 LAB. SHS WITHIN STA. INES ES, TALISAYAN, MIS. OR.18KK0161 · ₱18,940,495.96 · mapped
- COMPLETION OF MUNICIPAL GYM, VILLANUEVA, MISAMIS ORIENTAL18KL0037 · ₱18,373,019.30 · mapped
- CONSTRUCTION OF FOUR (4) STOREY EIGHT (8) CLASSROOM SCHOOL BUILDING AT BILUSO ELEMENTARY SCHOOL, SILANG, CAVITE17DQ0136 · ₱17,482,257.89
- CONSTRUCTION OF FOUR (4) STOREY EIGHT (8) CLASSROOM SCHOOL BUILDING AT BIGA ELEMENTARY SCHOOL, SILANG, CAVITE17DQ0124 · ₱17,409,260.93
- CONSTRUCTION OF FOUR (4) STOREY EIGHT (8) CLASSROOM SCHOOL BUILDING AT BIGA ELEMENTARY SCHOOL, SILANG, CAVITE17DQ0134 · ₱17,409,260.93
- CONST. OF 2STY 2 CL. SCI. LAB. & 2CL ICT LAB., TAGUSAO NHS, QUEZON, PALAWAN18EF0172 · ₱16,785,886.41 · mapped
- CONSTRUCTION OF MULTI-STOREY TVL: 4STY8CL - TAGPANGI NHS, BRGY. TAGPANGI, CAGAYAN DE ORO CITY17KH0103 · ₱16,650,298.10 · mapped
- MFO-1 NATIONAL ROAD NETWORK SERVICES: NETWORK DEVELOPMENT-OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - TERTIARY SURALLAH-LAKE SEBU-MAITUM RD K1744+300-K1745-000 MODIFIED TO: MFO -1 NATIONAL ROAD NETWORK SERVICES: NETWORK DEVELOPMENT- OFF-CARRIAGEWAY I17MG0089 · ₱14,765,726.42
Across government
- REPAIR/REHAB OF CLASSROOM BEFF CY 2019 C 2
- repair and rehabilitation of classrooms
- repair and rehabilitation of classrooms
- Repair/Rehab of Classroom BEFF CY 2018 SAVINGS
- Cluster 15 CY 2018 BEFF Repair of Classrooms
- DESIGN AND BUILD FOR THE COMPLETION OF VARIOUS HEA
- Repair/Rehab of School Bldg. Cluster 1
- Repair/Rehab of School Bldg. Cluster 4
- Repair/Rehab of School Bldg. Cluster 7
- REBID FOR THE REPAIR OF SCHOOL BLDG CLUSTER 7
- Repair of School Building
- Repair & Rehabilitation of School Buildings
- Construction Projects₱1,035,139.00· 2016-11-21· School building / classroom· DEPARTMENT OF EDUCATION- DIVISION OF SURIGAO DEL SUR
- Cluster I -Repair & Rehab of School Bldg
- Construction of School Building₱3,260,099.08· 2013-12-20· School building / classroom· DEPARTMENT OF EDUCATION- DIVISION OF SURIGAO DEL SUR
- Proposed Repair/Renovation of Building No. 14, National Center for Disease Prevention and Control (NCDPC)
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
