JLY CONST is listed as a company organization in Philippine public procurement records on this site, with 27 linked DPWH project(s) totaling about ₱526,044,680.98. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
JLY CONST
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 27
- Total value
- ₱526,044,680.98
- Published flags
- 1
- Region
- Ifugao 2nd DEO · Cordillera Administrative Region
Licensed officers (PCAB)
- Jayson P. Buligon · Authorized Managing Officer (PCAB license 47847) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for JLY CONST — not an accusation or finding of wrongdoing.
Score: 75.50 / 100 · Projects in sample: 27 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 52.9/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 52.9
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 18
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 26
- pastTargetOngoingProjects
- 8
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 27
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 27
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 98.9/100 · Weight: 11%
- projects
- 27
- componentScore
- 98.9
- flagsPerProject
- 0.04
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 27
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
27 geotagged projects — Open full map · Download projects (CSV)
- 25PJ0010: ASSET PRESERVATION PROGRAM- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS-ALFONSO LISTA-AURORA BDRY RD - K0445 + 765 - K0446 + 735, K0446 + 775 - K0447 + 28225PJ0010 · ₱78,458,359.93 · mapped
- 24PJ0016: NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF MISSING LINKS/ NEW ROADS AGUINALDO - TOBOY - NATONIN ROAD, AGUINALDO, IFUGAO24PJ0016 · ₱52,110,000.00 · mapped
- ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - NUEVA VIZCAYA-IFUGAO-MT PROVINCE RD - K0340 + 000 - K0341 + 000, BANAUE, IFUGAO22PJ0024 · ₱41,249,180.00 · mapped
- NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS NEW ROADS-AGUINALDO TOBOY NATONIN ROAD, IFUGAO STA. 4+200-STA 5+129, AGUINALDO, IFUGAO23PJ0017 · ₱39,200,000.00 · mapped
- 25PJ0012: ASSET PRESERVATION PROGRAM-CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS -SECONDARY ROADS-BANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD - K0398 + 033 - K0398 + 130, K0398 + 481 - K0398 + 593, K0399 + 032 - K0399 + 503, K040025PJ0012 · ₱32,182,458.78 · mapped
- 25PJ0008: ASSET PRESERVATION PROGRAM- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS-BANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD - K0406 + 820 - K0406 + 859, K0409 + 586 - K0409 + 637, K0410 + 359 - K0410 +25PJ0008 · ₱23,302,924.30 · mapped
- 25PJ0011: ASSET PRESERVATION PROGRAM-CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS-BANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD - K0365 + 1036, K0369 + 214 - K0369 + 833, K0384 + 59625PJ0011 · ₱22,430,736.25 · mapped
- 23PJ0063: CONSTRUCTION OF GALONOGON-MAJLONG-BUAG-ITAB FMR, AGUINALDO, IFUGAO23PJ0063 · ₱19,900,000.00 · mapped
- Construction of Slope Protection Structure, DPWH Ifugao 2nd DEO, Talite, Aguinaldo, Ifugao23PJ0013 · ₱19,600,000.00 · mapped
- 24PJ0015: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS- BANAUE - BARLIG - TANUDAN - TABUK ROAD, BANAUE, IFUGAO24PJ0015 · ₱19,600,000.00 · mapped
- 25PJ0014: NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/ NEW ROADS-BANAUE-BARLIG-TANUDAN-TABUK ROAD, IFUGAO25PJ0014 · ₱19,299,950.20 · mapped
- 25PJ0007: ASSET PRESERVATION PROGRAM- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS-BANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD - K0401 + 520 - K0401 + 543, K0401 + 750 - K0401 + 801, K0402 + 039 - K0402 +25PJ0007 · ₱16,678,552.89 · mapped
- 25PJ0015: NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/ NEW ROADS-AGUINALDO-TOBOY-NATONIN ROAD, IFUGAO25PJ0015 · ₱16,463,996.94 · mapped
- ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - BANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD - K0342 + 424, K0342 + 535, K0405 + 030 - K0405 + 520, AGUINALDO, IFUGAO22PJ0005 · ₱15,285,060.00 · mapped
- 24PJ0012: ASSET PRESERVATION PROGRAM- CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS-BANAUE-HUNGDUAN-BENGUET BDRY RD - K0346 + 345, K0349 + 435, K0349 + 577, K0350 + 336, BANAUE, IFUGAO24PJ0012 · ₱13,230,000.00 · mapped
- CONCRETING OF SITIO MALALUPA TO SITIO CARAGASAN PROPER, BRGY. CARAGASAN FMR, BRGY. CARAGASAN, ALFONSO LISTA, IFUGAO21PJ0007 · ₱11,940,000.00 · mapped
- 23PJ0049: REPAIR/REHABILITATION ANDCONSTRUCTION OF FARM-TO-MARKET ROADS IN DESIGNATED KEY PRODUCTIONAREAS-CONCRETING OF SITIO LUPAO FMR, BRGY. JACMAL, AGUINALDO, IFUGAO23PJ0049 · ₱11,940,000.00 · mapped
- 23PJ0034: CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS-WATER SUPPLY SYSTEM-CONSTRUCTION OF SOLAR WATER SYSTEM, SITIO BANAHAW, BARANGAY SAN MARCOS, MUNICIPALITY OF ALFONSO23PJ0034 · ₱9,800,000.00 · mapped
- 23PJ0035: CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS-WATER SUPPLY SYSTEM-CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY ADUYONGAN, MUNICIPALITY OF MAYOYAO, IFUGAO23PJ0035 · ₱9,800,000.00 · mapped
- 23PJ0037: CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS- WATER SUPPLY SYSTEM-CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY POSNAAN, MUNICIPALITY OF AGUINALDO, IFUGAO23PJ0037 · ₱9,800,000.00 · mapped
- 23PJ0036: CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS-WATER SUPPLY SYSTEM-CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY MONGAYANG, MUNICIPALITY OF AGUINALDO, IFUGAO23PJ0036 · ₱9,800,000.00 · mapped
- ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LAND SLIDES-TERTIARY ROADS-A. LISTA-AURORA BDRY. RD-K0454+403-K0454+441, K0455+688-K0455+768, ALFONSO LISTA, IFUGAO21PJ0017 · ₱8,324,424.03 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES-CONSTRUCTION OF BATAD ACCESS ROAD, BATAD,25PJ0075 · ₱7,834,471.74 · mapped
- 24PJ0038: CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES -CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY BUTAC, AGUINALDO, IFUGAO24PJ0038 · ₱4,950,000.00 · mapped
- 25PJ0069:CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ANABA ACCESS ROAD, ANABA, BANAUE, IFUGAO25PJ0069 · ₱4,949,993.16 · mapped
- 25PJ0070: CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ANABA-DUCLIGAN-BANAO ROAD, BANAUE, IFUG25PJ0070 · ₱4,944,612.05 · mapped
- 25PJ0058: CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF BUTAC MULTI-PURPOSE BUILDING (COMPLETION), BUTAC, AGUINALDO, IFUGAO25PJ0058 · ₱2,969,960.71 · mapped
Equipment & capacity
PCAB license
- License no.
- 47847
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Jan 29, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 47847); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
6 evaluations listed across 4 GPPB CPES releases; average final rating 94.9% over 4 rated projects; 6 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Feb 12, 2025 | DPWH | ₱13,230,000.00 | Completed | 99.9% | 95.9% | 39th (rev), p. 107 |
| Aug 14, 2024 | DPWH | ₱13,171,467.00 | On-going | 93.2% | — | 38th, p. 123 |
| May 15, 2024 | DPWH | ₱9,800,000.00 | Completed | 99.7% | 98.5% | 38th, p. 123 |
| Nov 23, 2023 | DPWH | ₱9,785,459.00 | On-going | 97.7% | — | 37th, p. 55 |
| Mar 21, 2023 | DPWH (JV) | ₱41,249,180.00 | Completed | 95.3% | 93.3% | 35th, p. 139 |
| Oct 20, 2022 | DPWH | ₱15,285,060.00 | Completed | 93.2% | 91.9% | 35th, p. 91 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →