KLDS TRADING & CONST is listed as a company organization in Philippine public procurement records on this site, with 36 linked DPWH project(s) totaling about ₱2,225,136,391.79. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
KLDS TRADING & CONST
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 36
- Total value
- ₱2,225,136,391.79
- Published flags
- 0
- Region
- Cavite 3rd DEO · Region IV-A
Licensed officers (PCAB)
- JOSELITO SAQUILAYAN SARIA · Authorized Managing Officer (PCAB license 28091) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for KLDS TRADING & CONST — not an accusation or finding of wrongdoing.
Score: 91.20 / 100 · Projects in sample: 36 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 98.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 98.6
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 34
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 35
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 91.7/100 · Weight: 24%
- totalProjects
- 36
- componentScore
- 91.7
- terminatedProjects
- 1
- terminationRatePct
- 2.8
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 36
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 36
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 36
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
31 geotagged projects — Open full map · Download projects (CSV)
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE ALONG JUANITO R. REMULLA, SR. RD - K0039 + 524 - K0044 + 27122DQ0076 · ₱135,098,892.40 · mapped
- CONSTRUCTION OF ROAD, BARANGAY BILUSO, SILANG, CAVITE22DQ0080 · ₱96,499,168.96 · mapped
- Construction of Slope Protection Structure along Imus River, Barangay Salitran II, Dasmariñas City, Cavite22DQ0004 · ₱96,498,513.53 · mapped
- PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG NATIONAL ROAD, BARANGAY ALMANZA DOS, LAS PINAS CITY22OI0026 · ₱96,496,720.88 · mapped
- Construction of Slope Protection Structure along Imus River, Barangay San Miguel, Dasmariñas City, Cavite22DQ0009 · ₱96,494,841.42 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT ALONG BACOOR RIVER, BARANGAY SALINAS, PHASE21DQ0056 · ₱96,375,336.57 · mapped
- Construction of Slope Protection along Imus River (Tributary to Manila Bay), Brgy. H-2 to Brgy. San Manuel, Dasmariñas City, Cavite22DQ0006 · ₱94,569,855.64 · mapped
- Construction of Slope Protection along Imus River (Tributary to Manila Bay), Brgy. Burol Main, Dasmariñas City, Cavite22DQ0003 · ₱94,569,844.56 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE ALONG CAVITE-BATANGAS RD - K0051 + 131 - K0052 + 608, K0053 + 173 - K0053 + 763 AND PREVENTIVE MAINTENANCE (ASPH22DQ0022 · ₱89,411,412.24 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - SILANG BYPASS RD - K0042 + (-516) K0042 + 56422DQ0018 · ₱85,742,437.62 · mapped
- LOCAL PROGRAM-CONSTRUCTION / REPAIR / REHABILITATION IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL BRIDGES - CONSTRUCTION (COMPLETION) OF BRIDGE ALONG CONGRESSIONAL TO SAN MARINO ROAD, DASMARIÑAS CITY, CA21DQ0009 · ₱82,022,403.10 · mapped
- LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL BRIDGES - CONSTRUCTION OF BRIDGE, BARANGAY SALAWAG, DASMARIÑAS CITY, CAVITE21DQ0028 · ₱82,019,987.53 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASIN AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION ALONG CARMON21DQ0010 · ₱82,016,309.95 · mapped
- LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL BRIDGES - CONSTRUCTION OF BRIDGE, BARANGAY SAN MARINO, DASMARIÑAS CITY, CAVITE21DQ0086 · ₱73,166,064.79 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERCONSTRUCTION OF REVETMENT ALONG ILANG-ILANG RI21DF0010 · ₱72,375,000.00 · mapped
- LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - DRAINAGE/ PROTECTION WORKS - CONSTRUCTION OF SLOPE PROTECTION ALONG CARMONA RIVER, PHASE I, WEST SIDE, C20DQ0022 · ₱67,930,166.85 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERCONSTRUCTION OF REVETMENT ALONG ILANG-ILANG RI21DF0009 · ₱67,550,000.00 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF ROAD - DON PLACIDO CAMP16DF0082 · ₱55,647,663.30
- MFO-1 NAT'L. ROAD NETWORK SERVICES NETWORK DEV'T. OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE SECONDARY ROADS CAVITE-BATANGAS ROAD, CAVITE17D00037 · ₱48,912,913.33 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG CARMONA RIVER, PHASE II, WEST S20DQ0021 · ₱48,249,659.42 · mapped
- LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES - CONSTRUCTION (COMPLETION) OF MISSING GAPS REVETMENT ALONG CARMONA-20DQ0096 · ₱48,248,721.68 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURES ALONG ZAPOTE RIVER, BRGY. SAN NICOLAS 3, PHASE III, BACOOR, CAVITE19DQ0142 · ₱45,831,350.55 · mapped
- LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL BRIDGES - REHABILITATION OF BRIDGE (RIPRAPPING), BARANGAY IBA, SILANG, CAVITE, REHABILITATION OF FOOT BRIDGE, BARANGAY KAONG, SILANG, CAVITE, LOCAL PROGRAM - LOCAL INFRASTRUCTU19DQ0092 · ₱43,398,018.89 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE ALONG BACOOR BLVD - K0019 + 000 - K0018 + 000 AND PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG MANILA-CAVITE (NCR22DQ0011 · ₱42,487,191.72 · mapped
- Construction of Revetment along Imus River, Brgy Palico Section, Imus, Cavite22DF0019 · ₱40,959,552.51 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REPLACEMENT OF BRIDGES - PANAPAAN BRIDGE ALONG MANILA-CAVITE (NCR BDRY-JCT CAVIT22DQ0064 · ₱39,199,950.07 · mapped
- LOCAL PROGRAM - CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS - WIDENING OF MAYORS BLVD., GMA, CAVITE AND WIDENING OF CONGRESSIONAL AVE., GMA, CAVITE19DQ0097 · ₱38,999,029.25 · mapped
- CONSTRUCTION OF CLASSROOMS - CONSTRUCTION OF 4STY 28CL SCHOOL BUILDING AT DASMARIÑAS NHS, CITY OF DA16DF0202 · ₱38,867,896.22
- MFO2-FLOOD MITIGATION SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE15DF0194 · ₱36,710,024.24 · mapped
- REVETMENT OF EAST AND WEST SIDE OF BALUCTUT RIVER, PALIPARAN 3, DASMARIÑAS CITY, CAVITE 4TH LD, INCD15DF0184 · ₱36,708,869.46 · mapped
- CONSTRUCTION OF 4STY 20CL SCHOOL BUILDING AT MALAGASANG II ES, IMUS CITY16DF0138 · ₱33,272,929.35
- LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES- LOCAL ROADS - CONSTRUCTION/ REHABILITATION OF ROAD, BRGY. ZAPOTE II, BACOOR, CAVITE, REHABILITATION OF ROAD WITH DRAINAGE, BARANGAY LIGAS, BACOOR CITY,CAVITE, REHABILITATION OF R19DQ0084 · ₱30,325,836.76 · mapped
- CONSTRUCTION OF CLASSROOMS - CONSTRUCTION OF 4STY 20CL SCHOOL BUILDING AT DASMARIÑAS NHS, CITY OF DA16DF0201 · ₱30,172,557.15
- Construction of Slope Protection from Baluctot River to Gov's Drive, Sampaloc III, Paliparan I, Dasmariñas, Cavite22DQ0063 · ₱29,398,431.92 · mapped
- MFO2-FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE16DF0012 · ₱19,599,947.43
- Construction of Revetment along Imus River, Brgy Toclong, Imus, Cavite22DF0017 · ₱9,308,892.50 · mapped
Equipment & capacity
PCAB license
- License no.
- 28091
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Mar 1, 2028
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 28091); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
13 evaluations listed across 6 GPPB CPES releases; average final rating 92.3% over 5 rated projects; 13 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| May 6, 2025 | DPWH | ₱49,496,976.00 | On-going | 94.2% | — | 40th, p. 178 |
| May 5, 2025 | DPWH | ₱77,200,000.00 | Completed | 98.8% | 92.6% | 40th, p. 178 |
| Feb 18, 2025 | DPWH | ₱96,497,805.00 | On-going | 95.5% | — | 40th, p. 178 |
| Nov 29, 2024 | DPWH | ₱110,137,278.00 | Completed | 76.7% | 88.1% | 39th (rev), p. 116 |
| Nov 29, 2024 | DPWH (JV) | ₱106,148,618.00 | Completed | 93.3% | 93.7% | 39th (rev), p. 116 |
| Aug 21, 2024 | DPWH | ₱110,137,278.00 | On-going | 95.7% | — | 38th, p. 134 |
| May 20, 2024 | DPWH | ₱76,420,544.00 | On-going | 88.4% | — | 38th, p. 133 |
| Nov 15, 2023 | DPWH (JV) | ₱106,148,765.00 | On-going | 93.2% | — | 37th, p. 60 |
| Nov 15, 2023 | DPWH | ₱58,799,876.00 | Completed | 96.6% | 94.9% | 37th, p. 60 |
| Sep 6, 2023 | DPWH (JV) | ₱106,148,765.00 | On-going | 94.7% | — | 36th, p. 118 |
| May 11, 2023 | DPWH | ₱58,799,876.00 | On-going | 93.8% | — | 36th, p. 118 |
| Mar 3, 2023 | DPWH | ₱98,997,607.00 | Completed | 90.7% | 92.2% | 35th, p. 96 |
Showing the 12 most recent of 13.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →