JELSIE CONST & SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 31 linked DPWH project(s) totaling about ₱2,009,732,524.90. Recorded delivery grade A (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
JELSIE CONST & SUPPLY
ARegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 31
- Total value
- ₱2,009,732,524.90
- Published flags
- 10
- Region
- CITY OF MANILA · National Capital Region
Licensed officers (PCAB)
- JESSE ROSERO MAHUSAY · Authorized Managing Officer (PCAB license 44943) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for JELSIE CONST & SUPPLY — not an accusation or finding of wrongdoing.
Score: 92.20 / 100 · Projects in sample: 31 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 100/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 100
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 31
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 31
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 31
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 31
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 94.2/100 · Weight: 11%
- projects
- 31
- componentScore
- 94.2
- flagsPerProject
- 0.19
- publishedV2Flags
- 6
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 31
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
31 geotagged projects — Open full map
- Construction of Debris Flow Barrier along Mindoro West Coastal Road (S00095MR), Sitio Turawan, Brgy. San Francisco, Sablayan, Occidental Mindoro23EB0087 · ₱98,999,995.37 · mapped
- Construction of River Control Structure along Nagapi River (Left Side), Sitio Balangabong - Sitio Saycohan Section, Calintaan, Occidental Mindoro23E00033 · ₱96,497,636.20 · mapped
- Construction of Tayuman Pumping Station, Manila City24OE0040 · ₱96,496,919.11 · mapped
- Construction of Flood Control Structure along Lumintao River from Boricotcot to Sitio Marilao, New Dagupan, Sta. 0+000 - Sta. 0+946, Calintaan, Occidental Mindoro23EB0036 · ₱96,496,274.13 · mapped
- Construction of River Control Structure along Nagapi River (Right Side), Sitio Balangabong - Sitio Saycohan Section, Calintaan, Occidental Mindoro23E00034 · ₱96,495,414.86 · mapped
- Installation of Booster Pump in CM Recto Ave. (Phase 1), Tondo, Manila City24OE0038 · ₱96,362,389.26 · mapped
- Installation of Booster Pump in CM Recto Ave. (Phase 2), Tondo, Manila City24OE0039 · ₱95,445,184.12 · mapped
- Construction of Drainage System along Libertad Main (From Roxas Blvd to Taft Avenue, Pasay City, Sta 0 + 161 to Sta 0 + 322), Phase 424OH0039 · ₱89,077,443.18 · mapped
- Installation of Booster Pump at P. Casal Bridge (Phase III) at Estero de San Miguel, Manila City24OE0181 · ₱76,149,978.47 · mapped
- Installation of Booster Pump at Estero dela Reina, Phase XIII, District 1, Tondo, Manila23OE0196 · ₱72,357,606.57 · mapped
- Installation of Booster Pump at Estero de Binondo Phase II, Manila City23OE0028 · ₱72,325,692.28 · mapped
- Installation of Booster Pump at Estero dela Reina, Phase III, Manila City23OE0039 · ₱72,216,269.62 · mapped
- Installation of Booster Pump at Estero de Binondo Phase I, Manila City23OE0003 · ₱71,910,972.99 · mapped
- Installation of Booster Pump at Estero dela Reina, Phase XIV, Tondo, Manila23OE0192 · ₱71,687,670.79 · mapped
- Installation of Booster Poump at Estero dela Reina, Phase XVI, District 1, Tondo Manila23OE0197 · ₱71,406,713.83 · mapped
- Installation of Booster Pump at Estero dela Reina, Phase XV, Tondo Manila23OE0193 · ₱70,540,676.21 · mapped
- Installation of Booster Pump at Estero de Binondo Phase III, Manila City23OE0032 · ₱70,521,409.22 · mapped
- Construction of Tanyag Flood Control Structure along Lumintao River, Barangay Proper, Sta. 0 + 000 - Sta. 0 + 633, Calintaan, Occidental Mindoro23EB0038 · ₱49,213,204.69 · mapped
- Installation of Booster Pump along Estero de Sampaloc (Phase III), Manila City23OE0071 · ₱48,999,599.71 · mapped
- Installation of Booster Pump Accessories along Estero de Vitas, Barangay 151, Manila City24OE0172 · ₱48,997,795.07 · mapped
- Installation of Booster Pump along Estero dela Reina (Phase I), Barangay 9, Tondo, Manila City23OE0070 · ₱48,989,429.12 · mapped
- Construction of Flood Mitigation Structure along Sapang Buwaya Creek near Valley 8, Brgy. San Antonio, Parañaque City24OC0088 · ₱48,250,000.00 · mapped
- Construction of Slope Protection Structure along Concordia Creek (Sta. 0+833 to Sta. 1+100), Left Bank, Manila City24OH0007 · ₱48,220,023.12 · mapped
- Installation of Booster Pump along Estero dela Reina (Phase V), Barangay 9, Tondo, Manila City23OE0073 · ₱47,749,362.48 · mapped
- Construction of Pumping Station at Estero dela Reina, Barangay 55, Tondo, Manila City23OE0072 · ₱47,747,381.33 · mapped
- Construction of Retarding Basin at Estero de Quiapo, Barangay 384, Manila23OE0043 · ₱47,375,366.03 · mapped
- Construction of Retarding Basin at Brgy 129, Vitas, Tondo, Manila23OE0198 · ₱41,576,933.09 · mapped
- Construction of Retention Basin along Estero de San Miguel, Phase I (Mendiola Section), Manila City23OE0041 · ₱34,724,638.04 · mapped
- Construction of Retarding Basin at Estero de Quiapo, Barangay 383, Manila23OE0050 · ₱33,678,257.09 · mapped
- Bank Improvement (Steel Sheet Pile) along Estero de San Lazaro, Barangay 297, Manila City22OE0120 · ₱25,751,991.02 · mapped
- Construction (Completion) of Pump at Pacheco Drainage Main, Tondo, Manila City22OE0074 · ₱23,470,297.90 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
