PLERM CONST AND DEVELOPMENT CORP is listed as a company organization in Philippine public procurement records on this site, with 39 linked DPWH project(s) totaling about ₱3,756,114,922.18. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
PLERM CONST AND DEVELOPMENT CORP
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 39
- Total value
- ₱3,756,114,922.18
- Published flags
- 0
- Region
- Region IV-B · Region IV-B
Licensed officers (PCAB)
- Efren Martinez Martinez · Authorized Managing Officer (PCAB license 33288) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for PLERM CONST AND DEVELOPMENT CORP — not an accusation or finding of wrongdoing.
Score: 79.70 / 100 · Projects in sample: 39 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 66.3/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 66.3
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 29
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 39
- pastTargetOngoingProjects
- 7
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 39
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 39
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 39
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 39
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
35 geotagged projects — Open full map · Download projects (CSV)
- BRIDGE PROGRAM- WIDENING OF BRIDGE, SIJERON BRIDGE (B00031TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, PHASE II, TABLAS ISLAND, ROMBLON24E00092 · ₱292,047,252.03 · mapped
- BRIDGE PROGRAM WIDENING OF PERMANENT BRIDGES LUMINTAO BR. (B00084MR) ALONG MINDORO WEST COASTAL ROAD (COMPLETION), OCCIDENTAL MINDORO23E00014 · ₱289,497,735.42 · mapped
- BRIDGE PROGRAM- WIDENING OF PERMANENT BRIDGES- SIJERON BR. (B00031TL), PHASE III ALONG TABLAS CIRCUMFERENTIAL OAD, STA. 62+372.204-STA. 62+675.055, TABLAS ISLAND, ROMBLON25E00154 · ₱280,725,915.28 · mapped
- WIDENING OF PERMANENT BRIDGES - SIIJERON BR. (B00031TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, TABLAS ISLAND, ROMBLON22E00054 · ₱241,241,529.70 · mapped
- BRIDGE PROGRAM- ALCATE BRIDGE (B00027MR) ALONG CSR JCT.-MINAS ROAD STA. 000+000.00-STA. 000+330.00, VICTORIA, ORIENTAL MINDORO25E00221 · ₱217,029,278.25 · mapped
- WIDENING OF PERMANENT BRIDGES-LUMINTAO BRIDGE (B00084MR) ALONG MINDORO WEST COASTAL RD. (PHASE II), STA. 263+758.72-STA. 264+095.95, MINDORO OCCIDENTAL22E00006 · ₱168,871,550.07 · mapped
- CONSTRUCTION OF CONCRETE BRIDGE, MOMPONG-BATONG BUHAY BRIDGE ALONG SABLAYAN PENAL COLONY ROAD, SABLAYAN, OCC. MINDORO17E00007 · ₱162,240,582.77 · mapped
- CONST. & MAINT. OF BRIDGES ALONG NATIONAL ROADS-REPLACEMENT OF PERMANENT WEAK BRIDGES-STA. LUCIA BRIDGE (BO4456LZ) ALONG EASTERN BULACAN ROAD, BULACAN 3RD LEGISLATIVE DISTRICT, PROVINCE OF BULACAN16C00047 · ₱158,170,011.09
- CONSTRUCTION OF CONCRETE PARALLEL BRIDGE - PAGBAHAN BRIDGE ALONG MINDORO WEST COASTAL ROAD, MINDORO OCCIDENTAL19E00042 · ₱154,272,100.59 · mapped
- REPL OF PANDURUCAN BR & APP ALONG MWCR, SAN JOSE OCC. MINDORO, APP. A - STA.236+700-STA.237+842.5;AP16E00018 · ₱139,995,449.12
- REPLACEMENT OF MANOOT BRIDGE ALONG JCT MWCR LABANGAN-MURTHA-JCT IRIRON RD OCC. MINDORO16E00017 · ₱139,389,862.34
- WIDENING OF PERMANENT BRIDGE, MAMBURAO BRIDGE (B0016MR) ALONG MINDORO WEST COASTAL ROAD, OCC. MINDORO, KO408+573.00 - KO408+693.0017E00005 · ₱122,950,430.00
- CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FR. NAT'L. RD./S LEAD. TO MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES-CONST. OF TULAOC OVERPASS BRIDGES ACCROSS NLEX, TULAOC, SAN SIMON, PAMPANGA24C00548 · ₱113,205,081.26 · mapped
- CONSTRUCTION OF BRIDGE, POBLACION - LUMANGBAYAN (PALUAN RIVER SECTION), PALUAN, OCCIDENTAL MINDORO25EB0033 · ₱112,210,035.00 · mapped
- BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES, DITEKI A BRIDGE (BO2828LZ) ALONG NUEVA ECIJA-AURORA ROAD (PHASE 2), PROVINCE OF AURORA22C00071 · ₱110,974,762.55 · mapped
- BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES-TALISAY BRIDGE (BO1599LZ) ALONG ROMAN EXPRESSWAY, PROVINCE OF BATAAN20C00007 · ₱106,126,539.75 · mapped
- REPLACEMENT OF CAGURAY BR. & APPR. ALONG MINDORO ORIENTAL/OCCIDENTAL EAST COASTAL RD.16E00019 · ₱101,346,703.17 · mapped
- STATE UNIVERSITIES AND COLLEGES (SUCS)- CONSTRUCTION OF SPORTS AND RECREATION ZONE, BULSU CAMPUS 2, PHASE 1-BULACAN STATE UNIVERSITY, PROVINCE OF BULACAN24C00604 · ₱99,499,992.94 · mapped
- CONVERGENCE & SPL. SUPPORT PROGRAM-SUSTAINABLE INFRA PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BRIDGES FR. THE NAT'L. ROAD/S LEAD. TO MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES-CONST. OF UPIG-SALAPUNGAN BR., SN. ILDEFONSO TO SN. RAFAEL, BULACAN23C00235 · ₱95,535,398.07 · mapped
- WIDENING OF BRIDGE - POLA BR. (B00105MR) ALONG MINDORO WEST COASTAL RD (PHASE II)21EB0050 · ₱72,344,193.96 · mapped
- WIDENING OF BRIDGE - ALIPID BR. (B00211MR) ALONG MINDORO WEST COASTAL RD21EB0048 · ₱70,441,411.90 · mapped
- BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES-DITEKI BRIDGE A (BO2828LZ) ALONG NUEVA ECIJA-AURORA ROAD, PROVINCE OF AURORA22C00056 · ₱67,505,428.71 · mapped
- WIDENING OF PERMANENT BRIDGES - ORILAN BR. 2 (B00138MR) ALONG MINDORO WEST COASTAL RD25EB0027 · ₱64,493,090.30 · mapped
- WIDENING OF BRIDGE - WASIG BR. (B00064MR), ALONG CALAPAN SOUTH ROAD, MANSALAY, ORIENTAL MINDORO17EI0081 · ₱42,759,743.77 · mapped
- BRIDGE PROGRAM- REPLACEMENT OF PERMANENT WEAK BRIDGES- PINAGSABANGAN BR. (B00008MR) ALONG CALAPAN SOUTH ROAD, NAUJAN, OR. MINDORO25E00225 · ₱39,297,194.77 · mapped
- CONSTRUCTION/CONCRETING OF ACCESS ROAD FROM SITIO CAMBAYANG, BRGY. CABUYAO TO SAN ISIDRO, PHASE II, BULALACAO, ORIENTAL MINDORO19EI0042 · ₱39,194,063.38 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS RDS AND/OR BRIDGES FROM THE NAT'L RD/S LEADING TO MAJOR/STARTEGIC PUBLIC BLDGS/FACILITIES-CONST. OF BRIDGE BRGY. BAYABAS, DOÑA REMEDIOS TRINIDAD, BULACAN23C00293 · ₱28,709,317.66 · mapped
- WIDENING OF BRIDGE - TULAONG BR. (B00212MR) ALONG MINDORO WEST COASTAL RD21EB0051 · ₱28,065,386.00 · mapped
- REPLACEMENT OF PERMANENT WEAK BRIDGE: AGSALIN BR. (B00044MR) ALONG CALAPAN SOUTH ROAD, GLORIA, OR. M16EI0011 · ₱24,642,792.07 · mapped
- CONSTRUCTION OF NEW BRIDGE - NEW PAGBAHAN BR. ALONG MINDORO WEST COASTAL RD21EB0054 · ₱24,499,990.60 · mapped
- CONSTRUCTION OF NEW BRIDGE - ARAANG BUHAY BR. 2 ALONG MINDORO WEST COASTAL RO21EB0052 · ₱24,499,987.76 · mapped
- CONSTRUCTION OF BRIDGE AND APPROACHES, SITIO NAALIN, BRGY. MALIWANAG, MANSALAY, ORIENTAL MINDORO19EI0040 · ₱24,492,818.44 · mapped
- WIDENING OF PERMANENT BRIDGES, BUAYAHAN BR., (B00039MR) ALONG CALAPAN SOUTH ROAD, GLORIA, ORIENTAL MINDORO20EI0123 · ₱23,242,972.20 · mapped
- WIDENING OF BRIDGE - MACANLIG BR., (B00031MR) ALONG CALAPAN SOUTH ROAD, PINAMALAYAN, ORIENTAL MINDORO18EI0084 · ₱18,946,040.56 · mapped
- WIDENING OF PERMANENT BRIDGE TINALUNAN BR. (B00040MR) ALONG CALAPAN SOUTH ROAD, GLORIA, ORIENTAL MINDORO18EI0025 · ₱15,331,870.81 · mapped
- BASIC EDUCATIONAL FACILITIES FUND (BEFF)-BATCH 1-CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOMS SCHOOL BUILDING IN TAMBUBONG ELEMENTARY SCHOOL, SAN RAFAEL, BULACAN23C00334 · ₱14,850,506.10 · mapped
- WIDENING OF PERMANENT BRIDGES TO MORE THAN 2 LANES: MADUGO BR. (B00062MR) ALONG CALAPAN SOUTH ROAD, ROXAS, ORIENTAL MINDORO17EI0049 · ₱14,193,928.52 · mapped
- WIDENING OF PERMANENT BRIDGES, TIGUISAN MUNTI BR., (B00050MR) ALONG CALAPAN SOUTH ROAD, BANSUD, ORIENTAL MINDORO20EI0030 · ₱8,624,000.00 · mapped
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, NIUGAN BR.1 (B00137LZ) ALONG GEN.ALEJO SANTOS HIGHWAY,ANGAT,BULACAN15CD0200 · ₱4,649,975.27 · mapped
Equipment & capacity
PCAB license
- License no.
- 33288
- Category
- AAA · Large B
- Minimum net worth for this category
- ₱180,000,000.00
- Allowable range of contract cost (ARCC)
- ₱450M or above (no published ceiling)
- License valid until
- Jul 30, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 33288); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
1 evaluation listed across 1 GPPB CPES release; 1 site-visit rating. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| May 15, 2024 | DPWH (JV) | ₱95,535,398.00 | On-going | 94.9% | — | 38th, p. 187 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →