R G FLORENTINO CONST is listed as a company organization in Philippine public procurement records on this site, with 41 linked DPWH project(s) totaling about ₱406,825,637.55. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
R G FLORENTINO CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 41
- Total value
- ₱406,825,637.55
- Published flags
- 0
- Region
- Romblon DEO · Region IV-B
Online presence
Google Maps: R.G. FLORENTINO Construction and Trading Inc.★ 3 (2 reviews)Google Maps, 2026-10-22
G298+C5V, Tablas Circumferential Rd, San Andres, Romblon
Public Record Grade
A transparent, data-derived summary of reported public records for R G FLORENTINO CONST — not an accusation or finding of wrongdoing.
Score: 82.70 / 100 · Projects in sample: 41 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 73.3/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 73.3
- lateCompletedProjects
- 15
- onTimeCompletedProjects
- 24
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 41
- pastTargetOngoingProjects
- 2
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 41
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 41
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 41
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 41
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
30 geotagged projects — Open full map · Download projects (CSV)
- CONSTRUCTION OF CAMBALO FLOOD CONTROL STRUCTURE, CAJIDIOCAN, ROMBLON25EH0031 · ₱48,264,993.30 · mapped
- REHABILITATION OF ROAD, PANGULO TO LINAO ROAD, CALATRAVA, ROMBLON25EH0047 · ₱33,302,847.30 · mapped
- CONSTRUCTION OF MARIGONDON FLOOD CONTROL, STA. 000 + 000 - STA. 000 + 208.00, SAN ANDRES, ROMBLON20EH0020 · ₱26,014,924.48 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (MEGA GOVERNMENT CENTER IN CAJIDIOCAN), ROMBLON23EH0138 · ₱24,747,323.72 · mapped
- CONSTRUCTION OF CALUNACON FLOOD CONTROL STRUCTURE ALONG TABLAS CIRCUMFERENTIAL ROAD, TABLAS ISLAND, ROMBLON20EH0048 · ₱24,109,007.78 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF TABLAS CIRCUMFERENTIAL ROAD, K0000 + 000 - K0001 + 000, K0001 + 000 - K0001 + 228, K0002 + 700 - K0002 + 854, ODIONGAN, ROMBLON16EH0076 · ₱22,018,108.82 · mapped
- CONSTRUCTION OF BRGY. LINAWAN TO BRGY. MARI - NORTE FMR, BRGY. LINAWAN TO BRGY. MARI - NORTE, SAN ANDRES, ROMBLON20EH0095 · ₱21,450,421.21 · mapped
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG SIBUYAN CIRCUMFERENTIAL ROAD, K0040+749.50 - K0041+212.07, K0041+224.36 - K0041+620, K0042+229.50 - K0042+331.50 AS PER ACTUAL, K0040+749.50 - K0041+209.07, K0041+224.36 - K0041+620, K0042+229.50 - K24EH0053 · ₱20,041,000.00 · mapped
- CONCRETING OF BRGY. AGPUDLOS FMR PHASE II, BRGY. AGPUDLOS, SAN ANDRES, ROMBLON24EH0137 · ₱14,922,118.14 · mapped
- CONCRETING OF SITIO LEMON, BRGY. MARIGONDON FMR, BRGY. MARIGONDON, SAN ANDRES, ROMBLON21EH0101 · ₱12,000,000.00 · mapped
- CONCRETING OF SITIO NARUTAN, BRGY. MARIGONDON NORTE FMR, BRGY. MARIGONDON, SAN ANDRES, ROMBLON23EH0111 · ₱11,937,456.13 · mapped
- CONCRETING OF SITIO LEMON, BRGY. MARIGONDON SUR FMR PHASE II, BRGY. MARIGONDON SUR, SAN ANDRES, ROMBLON23EH0113 · ₱11,934,497.76 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) OF JCT. LINAWAN MABLARAN FALLS, K0024 + 560 - K0024 + 800 AS PER KM POST, K0024 + 466 - K0024 + 581 AS PER RBIAK0024 + 932.50 - K0025 + 055.30 AS PER KM POST, K0024 + 714 - K0025 + 014 AS PER RBIA, SAN ANDRES, ROMBL16EH0020 · ₱11,746,748.70 · mapped
- CONSTRUCTION OF ROAD, BARANGAY TACLOBO, SAN FERNANDO-PHASE II, TACLOBO, SAN FERNANDO, ROMBLON24EH0059 · ₱9,900,000.00 · mapped
- CONSTRUCTION OF ACCESS ROAD, BARANGAY TACLOBO, STA. 00+000.00 - STA 00+350.50, SAN FERNANDO, ROMBLON22EH0068 · ₱9,698,171.69 · mapped
- ACCESS ROAD LEADING TO CAJIDIOCAN VIEWDECK, CAJIDIOCAN, ROMBLON25EH0028 · ₱9,604,201.52 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. ALIBAGON, CAJIDIOCAN, ROMBLON17EH0043 · ₱7,326,786.27
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. VICTORIA, SAN ANDRES, ROMBLON17EH0044 · ₱7,321,369.48
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG TABLAS CIRCUMFERENTIAL ROAD, K0014+070.00 - K0014+420.00 (AS PER ACTUAL AND RBIA), TABLAS ISLAND, ROMBLON24EH0016 · ₱6,563,715.65 · mapped
- CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING AT LINAWAN INTEGRATED SCHOOL, BARANGAY LINAWAN, SAN ANDRES, ROMBLON24EH0145 · ₱4,975,000.00 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (MULTI - PURPOSE HALL) AT BARANGAY OTOD, SAN FERNANDO, ROMBLON21EH0033 · ₱4,889,738.40 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING(COVERED COURT/EVACUATION CENTER), RECTO, FERROL, ROMBLON19EH0091 · ₱4,820,368.58 · mapped
- CONCRETING OF SITIO BAGOLAYAG FMR PHASE II, BGRY. TUBIGON, FERROL, ROMBLON18EH0135 · ₱4,802,566.71 · mapped
- CONCRETING OF SITIO CENTRO - SITIO WALA - SITIO, PANAGUINTINGAN FMR, BRGY. LUMBANG WESTE FMR, CAJIDIOCAN, ROMBLON16EH0138 · ₱4,796,907.62
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG TABLAS CIRCUMFERENTIAL ROAD, K0081+360.00 - K0081+460.00, TABLAS ISLAND, ROMBLON24EH0041 · ₱4,400,529.89 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING,SAN ANDRES, ROMBLON16EH0027 · ₱4,360,806.34
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, HINAG - OMAN, FERROL, ROMBLON16EH0030 · ₱4,360,806.34
- CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOM UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUNDS (BEFF) - BATCH 2, 1STY2CL, FETALVERO-MINGOA MS, CALATRAVA, ROMBLON22EH0167 · ₱4,112,225.09 · mapped
- CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOM UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUNDS (BEFF) - BATCH 2, 1STY2CL, BUNSORAN ES, FERROL, ROMBLON22EH0169 · ₱3,919,069.84 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT/EVACUATION CENTER), AGPUDLOS, SAN ANDRES, ROMBLON19EH0118 · ₱3,872,880.00 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (MULTI - PURPOSE HALL) AT TANAGAN NATIONAL HIGH SCHOOL, BARANGAY TANAGAN, SAN ANDRES, ROMBLON21EH0011 · ₱2,934,306.14 · mapped
- CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS, 1STY2CL SAN AGUSTIN CES, SAN AGUSTIN, ROMBLON17EH0093 · ₱2,574,089.36
- CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS, 1STY2CL DANAO ES, CAJIDIOCAN, ROMBLON17EH0089 · ₱2,520,567.56
- COMPLETION OF MULTI - PURPOSE BUILDING (COVERED COURT), LINAWAN, SAN ANDRES, ROMBLON19EH0104 · ₱2,450,000.00 · mapped
- PROVISION OF TECHVOC WORKSHOP BUILDING/LABORATORIES FOR SENIOR HS, CAJIDIOCAN NATIONAL HIGH SCHOOL, BRGY. POBLACION, CAJIDIOCAN, ROMBLON17EH0096 · ₱2,378,907.62
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY DUBDUBAN, SAN AGUSTIN, ROMBLON23EH0006 · ₱1,971,000.00 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PROGRESO ESTE, ODIONGAN, ROMBLON23EH0022 · ₱1,970,000.00 · mapped
- CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING/MULTI-PURPOSE HALL AT BRGY. AGPUDLOS, SAN ANDRES, ROMBLON21EH0072 · ₱1,963,916.23 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT), LUMBANG ESTE, CAJIDIOCAN, ROMBLON16EH0108 · ₱1,950,495.14
- CONSTRUCTION OF WATER SYSTEM LEVEL II, BRGY, POBLACION, FERROL, ROMBLON16EH0130 · ₱1,950,299.92
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (MUNICIPAL HALL), BRGY. POBLACION, FERROL, ROMBLON17EH0045 · ₱1,947,464.82
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →