KOUZBARY BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 95 linked DPWH project(s) totaling about ₱8,264,000,325.08. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
KOUZBARY BUILDERS
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 95
- Total value
- ₱8,264,000,325.08
- Published flags
- 0
- Region
- Region X · Region X
Online presence
Google Maps: KOUZBARY BUILDERS★ 4.4 (5 reviews)Google Maps, 2026-10-22
Macapagal Ave, Iligan City, Lanao del Norte, Philippines
Licensed officers (PCAB)
- Lani Rohani M. Kouzbary · Authorized Managing Officer (PCAB license 36446) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for KOUZBARY BUILDERS — not an accusation or finding of wrongdoing.
Score: 79.00 / 100 · Projects in sample: 95 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 62.3/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 62.3
- lateCompletedProjects
- 7
- onTimeCompletedProjects
- 65
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 91
- pastTargetOngoingProjects
- 19
- undatedCompletedProjectsExcluded
- 4
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 95
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0.3
- componentScore
- 100
- projectsWithAbcAndCost
- 95
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 95
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 95
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 46 of 81 geotagged projects (largest by contract value) — Open full map
- NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - MAHAPLAG-HILONGOS ROAD, PACKAGE A, LEYTE25I00162 · ₱289,263,168.19 · mapped
- CONSTRUCTION OF MISSING LINKS / NEW ROADS: MAHAPLAG - HILONGOS ROAD, INCLUDING ROW, LEYTE 5TH LD18I00016 · ₱286,933,876.71 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS, MAHAPLAG - HILONGOS ROAD, PACKAGE 1, LEYTE24I00024 · ₱240,110,179.95 · mapped
- REPAIR/REHAB./IMPRVT. OF MAROGONG-BALABAGAN ROAD, LANAO DEL SUR 2ND18K00297 · ₱210,611,013.05 · mapped
- NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS ALONG DAANG MAHARLIKA INCLUDING RROW, KO982+200-KO983+000; KO983+000-KO983+143; KO983+216-KO983+321; KO987+000-KO988+000; KO988+000-KO989+000; KO991+000-KO991+900; KO993+400-KO994+600, LEYTE 5TH LD18I00003 · ₱192,852,246.65 · mapped
- MARAWI TRANSCENTRAL ROAD, PHASE III, UNDER ROAD NETWORK DEVELOPMENT PROJECT IN CONFLICT AFFECTED AREAS IN MINDANAO (RNDP-CAAM), JICA LOAN AGREEMENT NO. PH-F-P1, CONTRACT PACKAGE 3-B, REHABILITATION OF TRANSCENTRAL ROADS, MARAWI CITY, LANAO DEL SUR20Z00010 · ₱173,442,206.06
- ROAD WIDENING - PRIMARY ROADS - ALONG DAANG MAHARLIKA INCLUDING RROW, KO976+092 - KO977+190, KO977+198 - KO978+000; KO978+000 - KO980+441; KO980+457 - KO981+000, LEYTE 5TH DISTRICT18I00014 · ₱172,815,357.29 · mapped
- CONTRACT PACKAGE 1B - REHABILITATION OF EXISTING MINDANAO STATE UNIVERSITY (MSU) ROADS20Z00015 · ₱161,062,690.35 · mapped
- ROAD WIDENING - PRIMARY ROADS, LIBUNGAO - MATAG-OB - PALOMPON ROAD, KO991+(-079) - KO992+667; KO992+723.40 - KO994+299; KO994+320.46 - KO996+151; KO996+167.25 - KO997+180, LEYTE 4TH DISTRICT18I00042 · ₱157,951,507.71 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, HILONGOS, LEYTE24I00071 · ₱146,340,258.26 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - MAHAPLAG - HILONGOS ROAD, PACKAGE 3, LEYTE, BRGY. AGUTAYON, MAHAPLAG, LEYTE20I00058 · ₱144,749,637.36 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - ACCESS ROAD LEADING TO HILONGOS PORT, HILONGOS, LEYTE22I00038 · ₱144,749,512.47 · mapped
- WIDENING OF PERMANENT BRIDGES LIANGAN PARALLEL BR. ALONG MAHARLIKA HIGHWAY( COTABATO-MALABANG-LANAO DEL NORTE RD)25K00193 · ₱143,302,499.97 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - ACCESS ROAD LEADING TO HILONGOS PORT, HILONGOS, LEYTE24I00011 · ₱142,161,660.42 · mapped
- URGENT REHABILITATION OF TRANS-CENTRAL ROAD DAMAGED BY CONFLICT IN MARAWI CITY, CONRTACT PACKAGE - 2, LOCATED IN MARAWI CITY, LANAO DEL SUR USING A DESIGN AND BUILD SCHEME18Z00040 · ₱139,348,270.71
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - ACCESS ROAD LEADING TO HILONGOS PORT, HILONGOS, LEYTE23IG0040 · ₱137,616,237.50 · mapped
- CONST. OF TUBOD-GANASSI ROAD, UYAAN MADAMBA SECT. K1607+540-K1615+890,LDS 2ND LD17K00183 · ₱137,489,469.84
- NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS / NEW ROADS - MAHAPLAG - HILONGOS ROAD, PACKAGE 3, LEYTE 5TH LD21I00021 · ₱137,369,427.55 · mapped
- CONSTRUCTION OF FLOOD CONTROL PROTECTION, BARANGAY PA-A, HILONGOS, LEYTE25IG0024 · ₱135,888,386.00 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS / NEW ROADS - MAHAPLAG - HILONGOS ROAD, PACKAGE 2, LEYTE, HILONGOS, LEYTE20I00024 · ₱135,098,646.70 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS, MAHAPLAG - HILONGOS ROAD, PACKAGE 2, LEYTE, LEYTE 5TH LD21I00004 · ₱128,211,704.61 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - MAHAPLAG - HILONGOS ROAD, PACKAGE 1, LEYTE, LEYTE, 5TH LD21I00003 · ₱128,211,600.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - ACCESS ROAD LEADING TO HILONGOS PORT, HILONGOS, LEYTE, LEYTE 5TH LD21I00009 · ₱128,211,082.99 · mapped
- CLUSTER II: 1. REPAIR/REHAB. OF DAMAGED PAVED ROADS ALONG TABANGO - CATMON - LA FORTUNA - MANLAWAAN - GIMARCO RD., K1036+800 - K1036+950, K1037+340 - K1037+500, K1037+620 - K1037+650, K1037+820 - K1038+020, K1038+150 - K1038+280, LEYTE 3RD LD; 2. REPAIR/K19I00122 · ₱125,235,018.08 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINK/NEW ROADS - MAHAPLAG-HILONGOS ROAD, PACKAGE 1, LEYTE23IG0039 · ₱123,856,785.00 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - MAHAPLAG - HILONGOS ROAD, PACKAGE 1, LEYTE, MAHAPLAG, LEYTE20I00023 · ₱120,623,286.33 · mapped
- IMPROVEMENT/ WIDENING OF NATIONAL ROADS - ORMOC - BAYBAY SOUTHERN LEYTE BDRY. RD K1029+460 - K1031+710, K1031+785 - K1032+000, K1034+516 - K1035+486, K1035-509 - K1037+14217IF0046 · ₱119,173,114.33 · mapped
- CONST. OF MISSING LINKS/NEW ROADS,LDNICR(SALVADOR-SAPAD-NUNUNGAN SEC.)PACKAGE 4,LANAO DEL NORTE18K00112 · ₱118,048,612.11 · mapped
- ROAD WIDENING-PRIMARY ROADS, COTABATO-MALABANG-LANAO DEL NORTE RD-(S01650MN) CHAINAGE 45264-CHAINAGE 4951124K00138 · ₱112,322,966.51 · mapped
- IMPROVEMENT/ WIDENING OF NATIONAL ROADS - PALO-CARIGARA-ORMOC RD K0990+332-K0990+725; K0995+004-K0996+318; K0996+318-K0996+616; K0996+691-K0998+490; K0998+490-K0998+91617IF0047 · ₱108,504,188.06 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - MAHAPLAG - HILONGOS ROAD, PACKAGE 1, LEYTE 5TH LD22I00022 · ₱106,149,934.00 · mapped
- NETWORK DEVELOPMENT, CONSTRUCTION OF MISSING LINKS/NEW ROADS, MAHAPLAG - HILONGOS ROAD, PACKAGE 3, LEYTE 5TH LD22I00023 · ₱106,149,549.38 · mapped
- Construction of Flood Control Structure and Drainage Systems, Hilongos, Leyte23IG0036 · ₱104,982,350.00 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS / NEW ROADS: MAHAPLAG - HILONGOS ROAD, PACKAGE 1, LEYTE, CW1 - CONSTRUCTION OF CONCRETE ROAD, LEYTE 5TH LD19I00090 · ₱103,696,203.59 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - MAHAPLAG - HILONGOS ROAD, PACKAGE 2, LEYTE22I00036 · ₱101,149,143.00 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANDULOG RIVER, BARANGAY MANDULOG, ILIGAN CITY24KM0073 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF HILONGOS FLOOD CONTROL (DRAINAGE SYSTEM), HILONGOS, LEYTE25IG0039 · ₱96,480,000.00 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS ALONG MANDULOG RIVER (DIGKILAAN BRIDGE SECTION), PACKAGE 1, ILIGAN CITY25KM0014 · ₱96,352,390.36 · mapped
- NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - PALOMPON - ISABEL - MERIDA - ORMOC RD., K1119+000 - K1121+087, K1121+097.81 - K1122+492, LEYTE 4TH LD21I00018 · ₱96,157,956.31 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SALIPONGAN RIVER, BALINDONG, LANAO DEL SUR24K00162 · ₱95,534,987.18 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS / NEW ROADS: MAHAPLAG - HILONGOS ROAD, PACKAGE 3, LEYTE 5TH LD19I00071 · ₱94,071,783.54 · mapped
- ROAD-WIDENING-PRIMARY ROADS, COTABATO-MALABANG-LANAO DEL NORTE RD (S01650MN) - CHAINAGE 59375 - CHAINAGE 59439, CHAINAGE 59462.118-CHAINAGE 59717.559, CHAINAGE 59762.502- CHAINAGE 61769.996, CHAINAGE 61790.121- CHAINAGE 6287522K00167 · ₱93,604,766.64 · mapped
- CONST. ALONG TUBOD - GANASSI ROAD, K1611 + 000 - K1616 + 1000, LANAO DEL SUR 2ND18K00292 · ₱93,604,069.27 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BANGKEROHAN FLOOD CONTROL STRUCTURE, PHASE 1, HILONGOS, LEYTE25I00143 · ₱93,399,155.14 · mapped
- ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - TABANGO - CATMON - LA FORTUNA - MANLAWAAN - GIMARCO RD. - K1035+854 - K1035+947, K1034+000 - K1034+030, K1034+057 - K1034+185, LEYTE 320I00017 · ₱91,579,937.59 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, LEMON-LEYTE-BILIRAN ROAD, K0983+218-K0983+493; K0983+512-K0988+438, K0993+000-K0996+996; K1001+000-K1004+778LEYTE, LEYTE17IE0061 · ₱91,548,484.31 · mapped
- REHABILITATION/IMPROVEMENT OF FLOOD CONTROL STRUCTURES, DUNGCA-AN RIVER BASIN (DUNGCA-AN RIVER BASIN), BAYBAY CITY, LEYTE17IG0120 · ₱91,224,900.24
- BACOOR-DASMARIÑAS NATIONAL RD - K0023+830 - K0024+080, K0024+093 - K0024+45024D00083 · ₱89,388,234.77 · mapped
- ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS, LINAMON-ZAMBOANGA ROAD-S00968MN, K1617+453-K1617+711, K1621+760-K1622+291, KAPATAGAN, LANAO DEL NORTE20KG0054 · ₱80,381,755.30 · mapped
- FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF REVETMENT/RIVERBANK PROTECTION AT PINUYAK BRIDGE ALONG MARANDING RIVER STREAM,BRGY. PINUYAK,LALA,LANAO DEL NORTE21KG0028 · ₱79,608,043.77 · mapped
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
