CONSTRUCTION OF HILONGOS FLOOD CONTROL (DRAINAGE SYSTEM), HILONGOS, LEYTE
CONSTRUCTION OF HILONGOS FLOOD CONTROL (DRAINAGE SYSTEM), HILONGOS, LEYTE is a DPWH-tracked public work in Leyte 5th DEO, Region VIII. Reported contract value: ₱96,480,000.00. Status: Past target date (DPWH On-Going). Contractor on record: KOUZBARY BUILDERS 36446. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
