IJK MAE CONST INC is listed as a company organization in Philippine public procurement records on this site, with 408 linked DPWH project(s) totaling about ₱2,956,663,777.20. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
IJK MAE CONST INC
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 408
- Total value
- ₱2,956,663,777.20
- Published flags
- 3
- Region
- Nueva Ecija 1st DEO · Region III
Online presence
Google Maps: IJK Mae Construction IncGoogle Maps, 2026-10-22
19th Street Melencio Street Extension, Cabanatuan City, Nueva Ecija
Licensed officers (PCAB)
- Imelda C. Tumibay · Authorized Managing Officer (PCAB license 35272) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for IJK MAE CONST INC — not an accusation or finding of wrongdoing.
Score: 96.60 / 100 · Projects in sample: 408 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 94.6/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 94.6
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 385
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 396
- pastTargetOngoingProjects
- 11
- undatedCompletedProjectsExcluded
- 10
- Termination rate
Component score: 99.3/100 · Weight: 21%
- totalProjects
- 408
- componentScore
- 99.3
- terminatedProjects
- 1
- terminationRatePct
- 0.2
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 407
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.9/100 · Weight: 11%
- projects
- 408
- componentScore
- 99.9
- flagsPerProject
- 0
- publishedV2Flags
- 2
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 408
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 48 of 351 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ALIAGA - GUIMBA DIVERSION ROAD, NUEVA ECIJA23CE0071 · ₱96,498,985.20 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CALASAG (LEFT SIDE), SAN ILDEFONSO, BULACAN25C00373 · ₱95,099,864.49 · mapped
- NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, GUIMBA BY-PASS (SAN ROQUE - BACAYAO ROAD), NUEVA ECIJA25CE0238 · ₱86,003,414.70 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALAVERA RIVER, BARANGAY STA. MONICA, ALIAGA, NUEVA ECIJA25CE0294 · ₱71,648,830.89 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (STO. DOMINGO COMMUNITY CENTER) MUNICIPAL GOVERNMENT COMPLEX STO. DOMINGO, NUEVA ECIJA23CE0187 · ₱59,389,841.85 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, NUEVA ECIJA - PANGASINAN RD - K0161+000 - K0162+000, K0169+911 - K0171+21924CE0191 · ₱53,113,220.30 · mapped
- CONSTRUCTION OF ROAD, LLANERA TO GENERAL NATIVIDAD, NUEVA ECIJA22CE0050 · ₱48,999,917.51 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - GUIMBA - PURA ROAD, NUEVA ECIJA22CE0019 · ₱48,992,360.16 · mapped
- Construction of Flood Control Structure along Cassanova Creek, Barangay Nagpandayan, Guimba, Nueva Ecija24CE0124 · ₱48,514,625.05 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG RIO CHICO RIVER, BARANGAY PARTIDA II, GUIMBA, NUEVA ECIJA25CE0263 · ₱48,509,937.05 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALAVERA RIVER, BARANGAY PULONG SAN MIGUEL, TALAVERA, NUEVA ECIJA25CE0122 · ₱48,508,780.17 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABONG RIVER, BARANGAY SAN JUAN, LICAB, NUEVA ECIJA25CE0072 · ₱48,504,823.35 · mapped
- Construction of Flood Control Structure along Talavera River, Barangay Sicsican Matanda, Talavera, Nueva Ecija24CE0123 · ₱47,771,977.22 · mapped
- Construction/Rehabilitation of Flood Control Structures along Labong River, Brgy. Tabing Ilog, Licab, Nueva Ecija24CE0221 · ₱47,767,302.32 · mapped
- REHABILITATION/RECONSTRUCTION OF DAMAGED PAVEMENTS, POBLACION TO GENERAL LUNA, LLANERA ROAD, NUEVA ECIJA21CE0146 · ₱43,875,656.71 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALAVERA RIVER, BARANGAY CALIPAHAN, TALAVERA, NUEVA ECIJA25CE0261 · ₱40,589,196.29 · mapped
- CONSTRUCTION, COMPLETION AND DEVELOPMENT OF DPWH BATAAN 2ND DEO BUILDINGS AND FACILITIES, BALANGA CITY, BATAAN21CB0044 · ₱39,200,000.00 · mapped
- CONSTRUCTION OF TRANSIENT FACILITY AT LIGHT REACTION REGIMENT, FORT RAMON MAGSAYSAY, NUEVA ECIJA20CF0072 · ₱39,200,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (AMPHITHEATER) AT THE TALAVERA NATIONAL HIGH SCHOOL, TALAVERA, NUEVA ECIJA22CE0174 · ₱39,197,118.57 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG RIO CHICO RIVER, BARANGAY CASONGSONG, GUIMBA, NUEVA ECIJA25CE0315 · ₱38,806,664.38 · mapped
- NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION OF DPWH BATAAN 2ND DISTRICT ENGINEERING OFFICE BUILDING, CITY OF BALANGA, BATAAN19CB0012 · ₱34,268,640.00 · mapped
- Construction of Drainage Structure, Barangay La Torre, Talavera, Nueva Ecija24CE0329 · ₱33,428,392.22 · mapped
- CONCRETING OF BRGY. NAGMISAHAN FMR, BRGY. NAGMISAHAN, CUYAPO, NUEVA ECIJA23CE0179 · ₱31,835,306.23 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (AMPHITHEATER) IN TALAVERA NATIONAL HIGH SCHOOL, TALAVERA, NUEVA ECIJA22CE0175 · ₱29,697,890.36 · mapped
- CONSTRUCTION OF 7ID CENTER, FORT RAMON MAGSAYSAY, NUEVA ECIJA22CF0077 · ₱29,400,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 1), BRGY. SAINT JOHN, GUIMBA, NUEVA ECIJA20CE0233 · ₱29,102,970.80 · mapped
- Construction/Rehabilitation of Flood Control Structures along Talavera River, Brgy. Calipahan, Talavera, Nueva Ecija (Phase 2)24CE0240 · ₱28,659,917.78 · mapped
- CONSTRUCTION OF OFFICERS BARRACKS, FORT RAMON MAGSAYSAY, PALAYAN CITY, NUEVA ECIJA22CF0078 · ₱24,500,000.00 · mapped
- Construction of Flood Control Structure in Barangay Buliran, San Antonio, Nueva Ecija22CF0028 · ₱24,499,995.94 · mapped
- CONSTRUCTION/COMPLETION OF DPWH BUILDING, NUEVA ECIJA 1ST DISTRICT ENGINEERING OFFICE, INCLUDING SITE DEVELOPMENT AND OTHER FACILITIES, TALAVERA, NUEVA ECIJA19CE0034 · ₱22,634,308.97 · mapped
- Construction of Flood Control Structure along Talavera River, Barangay Calipahan, Talavera, Nueva Ecija24CE0239 · ₱19,889,072.16 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL), MARIA AURORA, AURORA23CN0084 · ₱19,800,000.00 · mapped
- CONSTRUCTION (COMPLETION) OF AMPHITHEATER, TALAVERA NATIONAL HIGH SCHOOL, TALAVERA, NUEVA ECIJA21CE0145 · ₱19,600,025.42 · mapped
- Construction of PRIS SDC Slope Protection at Calinat Dam, Science City of Munoz, Nueva Ecija24CE0035 · ₱19,403,906.20 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTION OF SLOPE PROTECTION ALONG PAMPANGA RIVER CONTROL IN BRGY. VALENZUELA, STA. ROSA, NUEVA ECIJA19CF0076 · ₱18,813,792.99 · mapped
- COMPLETION OF 2STY6CL, NAMPICUAN CENTRAL SCHOOL, NAMPICUAN, NUEVA ECIJA24CE0315 · ₱17,402,359.67 · mapped
- CONCRETING OF BRGY. SAN PEDRO FMR, BRGY. SAN PEDRO, LUPAO, NUEVA ECIJA24CE0295 · ₱14,776,454.02 · mapped
- CONCRETING OF BRGY. UMANGAN, ALIAGA TO BRGY. SAN MIGUEL NA MUNTI, TALAVERA FMR, BRGY. UMANGAN, ALIAGA, AND BRGY. SAN MIGUEL NA MUNTI, TALAVERA, NUEVA ECIJA24CE0309 · ₱14,775,763.62 · mapped
- CONSTRUCTION OF ARTILLERY SPARES WAREHOUSE, ARMY ARTILLERY REGIMENT (AAR) PHILIPPINE ARMY (PA), FORT RAMON MAGSAYSAY, NUEVA ECIJA22CF0091 · ₱14,700,000.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) CONSTRUCTION OF 71D GRANDSTAND, FORT MAGSAYSAY, PALAYAN CITY, NUEVA ECIJA21CF0151 · ₱14,552,681.97 · mapped
- CONSTRUCTION OF 2STY4CL, AGUPALO WESTE ES, LUPAO, NUEVA ECIJA20CE0104 · ₱13,924,574.57 · mapped
- CONSTRUCTION OF A 2STY10CL SCHOOL BUILDING, PEÑARANDA NATIONAL NHS, PEÑARANDA, NUEVA ECIJA 4TH LD- CONSTRUCTION OF CLASSROOMS16CF0207 · ₱12,741,338.30
- CONCRETING OF BRGY. CASILAGAN FMR, BRGY. CASILAGAN, RIZAL, NUEVA ECIJA23CE0152 · ₱12,674,998.84 · mapped
- CONCRETING OF BRGY. STA. MARIA FMR, BRGY. STA. MARIA, LICAB, NUEVA ECIJA23CE0181 · ₱12,437,313.95 · mapped
- CONSTRUCTION OF TWO (2) STOREY, SIX (6) CLASSROOM SCHOOL BUILDING ABAR 1ST ES, SAN JOSE CITY, NUEVA ECIJA18CE0244 · ₱12,114,305.01 · mapped
- CONSTRUCTION OF 2STY4CL, BUGNAN ES, GABALDON, NUEVA ECIJA20CF0103 · ₱12,069,523.67 · mapped
- REPLACEMENT OF BOX CULVERT ALONG MUNOZ-TALUGTUG ROAD, VILLA ROSENDA, TALUGTUG, NUEVA ECIJA25CE0214 · ₱11,642,549.07 · mapped
- REPLACEMENT OF BOX CULVERT ALONG MUNOZ-TALUGTUG ROAD, BARANGAY CALISITAN, MUÑOZ, NUEVA ECIJA25CE0213 · ₱11,642,313.58 · mapped
- REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE AT BARANGAY WEST POBLACION, PANTABANGAN, NUEVA ECIJA24CE0077 · ₱11,642,293.13 · mapped
- CONSTRUCTION OF TWO (2) STOREY SIX (6) CLASSROOMS, MUÑOZ NATIONAL HIGH SCHOOL, SCIENCE CITY OF MUÑOZ, NUEVA ECIJA17CE0264 · ₱11,547,967.07
Equipment & capacity
PCAB license
- License no.
- 35272
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Jul 25, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 35272); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
6 evaluations listed across 2 GPPB CPES releases; average final rating 93.8% over 4 rated projects; 6 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 27, 2025 | DPWH | ₱3,940,060.00 | Completed | 99.5% | 94.7% | 40th, p. 143 |
| May 26, 2025 | NIA | ₱23,601,914.00 | Completed | 94.6% | 94.6% | 40th, p. 143 |
| Feb 18, 2025 | DPWH | ₱48,514,625.00 | Completed | 97.7% | 95.0% | 40th, p. 143 |
| Feb 18, 2025 | DPWH | ₱3,940,060.00 | On-going | 92.6% | — | 40th, p. 143 |
| Nov 6, 2019 | DPWH | ₱4,900,356.00 | On-going | 92.3% | — | 37th, p. 48 |
| Jun 13, 2019 | DPWH | ₱9,333,302.00 | Completed | 90.9% | 90.9% | 40th, p. 143 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 419 awards · ₱3,193,466,332.29
- DPWH Goods & services: 251 awards · ₱242,279,741.10
- DepEd Infrastructure: 23 awards · ₱170,167,401.14
- Municipality of Gerona, Tarlac Infrastructure: 57 awards · ₱122,687,650.29
- NIA Infrastructure: 6 awards · ₱83,630,779.53
- Municipality of Umingan, Pangasinan Infrastructure: 13 awards · ₱81,114,844.35
- DOH Infrastructure: 6 awards · ₱69,553,327.26
- City of Tarlac Infrastructure: 7 awards · ₱58,234,359.46
- Province of Nueva Ecija Infrastructure: 1 award · ₱29,337,002.56
- Philippine Rice Research Institute Infrastructure: 5 awards · ₱20,171,188.97
- Province of Zambales Infrastructure: 5 awards · ₱7,925,064.99
- BFP Infrastructure: 1 award · ₱4,941,975.19
- City of San Jose Infrastructure: 1 award · ₱2,985,816.68
- Philippine Center For Postharvest Development and Mechanization Infrastructure: 7 awards · ₱2,049,742.28
- Barangays and Sangguniang Kabataan Goods & services: 5 awards · ₱1,586,026.10
- DepEd Goods & services: 2 awards · ₱1,429,472.09
- Philippine Center For Postharvest Development and Mechanization Goods & services: 2 awards · ₱1,277,446.73
- Municipality of Umingan, Pangasinan Goods & services: 2 awards · ₱1,237,791.58
- Philippine Carabao Center Infrastructure: 1 award · ₱1,131,328.97
- Municipality of General Mamerto Natividad, Nueva Ecija Goods & services: 1 award · ₱996,778.13
- Municipality of Gabaldon, Nueva Ecija Goods & services: 3 awards · ₱729,482.00
- Philippine Rice Research Institute Goods & services: 1 award · ₱401,468.40
- Municipality of Gabaldon, Nueva Ecija Infrastructure: 1 award · ₱345,936.50
- Bureau Of Quarantine Goods & services: 1 award · ₱345,144.69
- Barangays and Sangguniang Kabataan Infrastructure: 1 award · ₱165,000.00
- 25GCE0043
- 25GCE0042
- (Purok Cabawi Phase II), Brgy. Magaspac
- Concreting of Barangay Road, Brgy. Padapada
- 25GCE0041₱7,152,873.60· 2025-08-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 1ST DE
- 25GCF03
- 25CE0202₱4,925,327.36· 2025-06-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 1ST DE
- 25CE0334₱1,939,381.01· 2025-06-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 1ST DE
- 25CE0318₱3,940,182.62· 2025-06-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 1ST DE
- 25CE0319₱3,940,081.21· 2025-06-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 1ST DE
- 25CE0199₱5,910,107.53· 2025-06-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 1ST DE
- 25CE0213₱11,642,313.58· 2025-06-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 1ST DE
- 25CE0294₱71,648,830.89· 2025-06-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 1ST DE
- 25CE0320₱3,152,078.88· 2025-06-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 1ST DE
- 25CE0293₱2,592,420.35· 2025-05-28· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 1ST DE
- 25GCE0019
- 25GCE0017
- 25GCE0018
- 25CE0315₱38,806,664.38· 2025-05-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 1ST DE
- 25CE0300₱2,954,789.76· 2025-05-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 1ST DE
- 25CE0299₱3,940,262.96· 2025-05-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 1ST DE
- 25CE0296₱3,940,306.34· 2025-05-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 1ST DE
- 25CE0301₱3,940,175.85· 2025-05-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 1ST DE
- 25CE0298₱3,922,194.69· 2025-05-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 1ST DE
- 25CE0284₱4,949,430.58· 2025-05-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NUEVA ECIJA 1ST DE
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →