NC RODRIGUEZ CONST is listed as a company organization in Philippine public procurement records on this site, with 12 linked DPWH project(s) totaling about ₱128,576,386.08. Recorded delivery grade B (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
NC RODRIGUEZ CONST
BRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 12
- Total value
- ₱128,576,386.08
- Published flags
- 0
- Region
- Cagayan 2nd DEO · Region II
Public Record Grade
A transparent, data-derived summary of reported public records for NC RODRIGUEZ CONST — not an accusation or finding of wrongdoing.
Score: 82.80 / 100 · Projects in sample: 12 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 87.5/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 87.5
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 9
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 12
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 12
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 12
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — weight redistributed
- projects
- 12
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — weight redistributed
- projects
- 12
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS, and COA records. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
12 geotagged project(s) — Open full map
- Restoration of Sicalao Flood Control, Sicalao, Lasam, Cagayan21BC0210 · ₱21,287,900.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - STA. FILOMENA-LANGAY BARANGAY ROAD LE25BC0032 · ₱19,356,226.66 · mapped
- CONCRETING OF BRGY. SANTA ROSA FMR, BRGY. SANTA ROSA, ABULUG, CAGAYAN23BC0144 · ₱14,925,000.00 · mapped
- CONCRETING OF BRGY. SANTO TOMAS FMR, BRGY. SANTO TOMAS, ABULUG, CAGAYAN23BC0145 · ₱14,730,791.24 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONIMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - GANDIA BARANGAY ROAD LEADING TO JCT.24BC0033 · ₱11,671,088.33 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS-WATER SUPPLY SYSTEM- CONSTRUCTION OF SOLAR WATER SYSTEMS, ABULUG, CAGAYAN23BC0086 · ₱9,800,000.00 · mapped
- CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT)-GANDIA BARANGAY ROAD LEADING TO JCT. AYAGA(ABULUG)-BALLESTEROS-APARRI ROAD CONNECTING TO AQUATIC RESOURCES, COCONUT PLANTATION AND LIVESTOCK, ALINUNU,22BC0057 · ₱9,786,150.00 · mapped
- LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL ROADS-CONCRETING OF BARANGAY ROAD, BRGY. DANA ILI, ABULUG, CAGAYAN21BC0088 · ₱6,682,500.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS-CAGAYAN APAYAO RD (S00655LZ), K0540+020-K0540+080, K0540+98021BC0123 · ₱5,703,742.29 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (SLAUGHTERHOUSE), BARANGAY SIMAYUNG, ABULUG, CAGAYAN23BC0106 · ₱4,949,999.32 · mapped
- CSSP-BASIC INFRASTRUCTURE PROGRAM- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, CANAYUN TO DUGO (QUARRY), BARANGAY CANAYUN, ABULUG, CAGAYAN23BC0095 · ₱4,900,241.83 · mapped
- CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT)-GANDIA BARANGAY ROAD LEADING TO JCT. AYAGA (ABULUG)-BALLESTEROS-APARRI ROAD CONNECTING TO AQUATIC RESOURCES, COCONUT PLANTATION AND LIVESTOCK, ALINUNU23BC0045 · ₱4,782,746.41 · mapped
