PHILWORKS CONST & SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 7 linked DPWH project(s) totaling about ₱604,051,158.85. Recorded delivery grade B (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
PHILWORKS CONST & SUPPLY
BRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 7
- Total value
- ₱604,051,158.85
- Published flags
- 0
- Region
- CAMARINES SUR · Region V
Public Record Grade
A transparent, data-derived summary of reported public records for PHILWORKS CONST & SUPPLY — not an accusation or finding of wrongdoing.
Score: 82.40 / 100 · Projects in sample: 7 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 100/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 100
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 7
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 7
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 7
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0.6
- componentScore
- 100
- projectsWithAbcAndCost
- 7
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 7
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 7
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
7 geotagged project(s) — Open full map
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES AND ECONOMIC ZONES MINUHANG(BALUARTE)BALUD AND BALUD-DUKA ROAD CONNECTING TO BAGAHUPI-BABATNGON_STA. CRUZ-BARUGO-CARIGARA NATIONAL ROAD IN SUPPORT OF THE BARUGO ECO-ZONE,BARUGO,LEYTE18ID0063 · ₱142,311,412.98 · mapped
- CONST./IMPVT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, VIRAC-TOURISM CORRIDOR (SAN ANDRES VIRAC COASTAL ROAD) VIRAC & SAN ANDRES, CATANDUANES16F00042 · ₱103,943,067.89 · mapped
- CONSTRUCTION OF NEW PERMANENT BRIDGES-IBAWON BR. ALONG LA PAZ-JAVIER-BITO ROAD19ID0050 · ₱89,551,948.63 · mapped
- Construction of Flood Mitigation Measure along Hibago River, Left Side, Upstream of Hibago Bridge, Brgy. Hibago, Ocampo, Camarines Sur23FF0020 · ₱85,981,400.00 · mapped
- Construction/Rehabilitation/Improvement of Flood Mitigation Structure,Peñafrancia Creek, Brgy. Del Rosario, Naga City (Left Side)22FF0043 · ₱76,604,250.86 · mapped
- Construction/ Rehabilitation of Flood Protection Measures along Hibago River Flood Mitigation Structure, Right Side, Upstream of Hibago Bridge, Brgy. Pinit, Ocampo, Camarines Sur23FF0019 · ₱57,194,183.00 · mapped
- Construction of Pacol Flood Control, Brgy. Pacol, Naga City, Camarines Sur23FF0046 · ₱48,464,895.49 · mapped
