ALPXR CONST is listed as a company organization in Philippine public procurement records on this site, with 46 linked DPWH project(s) totaling about ₱288,745,331.37. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
ALPXR CONST
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 46
- Total value
- ₱288,745,331.37
- Published flags
- 0
- Region
- Sultan Kudarat 1st DEO · Region XII
Online presence
Public Record Grade
A transparent, data-derived summary of reported public records for ALPXR CONST — not an accusation or finding of wrongdoing.
Score: 90.40 / 100 · Projects in sample: 46 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 90.2/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 90.2
- lateCompletedProjects
- 9
- onTimeCompletedProjects
- 37
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 46
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 46
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 46
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 46
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 46
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
46 geotagged projects — Open full map · Download projects (CSV)
- ROAD WIDENING - MARBEL - ALLAH VALLEY - COTABATO ROAD, STA. K1773+340 - STA. K1774+267, ESPERANZA, SULTAN KUDARAT20MF0008 · ₱24,480,109.44 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. KENRAM, ISULAN, SULTAN KUDARAT20MF0083 · ₱19,799,840.53 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING IN NARRA PARK, BRGY. KALAWAG 2, ISULAN, SULTAN KUDARAT21MF0044 · ₱19,779,336.33 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (TWO-STOREY BUILDING, PROVINCIAL ISOLATION) SULTAN KUDARAT PROVINCIAL HOSPITAL, NEW CAPITOL SITE, BRGY. KALAWAG 2, ISULAN, SULTAN KUDARAT21MF0040 · ₱19,778,740.46 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING FOR DIALYSIS CENTER, NEW CAPITOL SITE, BRGY. KENRAM, ISULAN, SULTAN KUDARAT20MF0082 · ₱19,778,440.62 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING FOR DOCTOR'S QUARTERS IN NEW CAPITOL SITE, BRGY. KALAWAG 2, ISULAN, SULTAN KUDARAT21MF0042 · ₱19,776,588.98 · mapped
- SADSALAN BRIDGE 2 (B01607MN) ALONG DULAWAN - MARBEL ROAD, LAMBAYONG, SULTAN KUDARAT21MF0015 · ₱19,599,081.97 · mapped
- KIDAPAWAN-ALLAH JUNCTION RD - K1674 + 959 - K1675 + 133, K1675 + 158 - K1675 + 34023MF0006 · ₱19,473,808.56 · mapped
- DULAWAN - MARBEL ROAD - K1750 + 066 - K1750 + 77821MF0010 · ₱15,908,556.73 · mapped
- CONCRETING OF BRGY. SADSALAN TO BRGY. UDTONG FMR, BRGY. SADSALAN AND BRGY. UDTONG, LAMBAYONG, SULTAN KUDARAT, STA.0+000-STA.0+896.7, LAMBAYONG, SULTAN KUDARAT20MF0091 · ₱12,528,993.86 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAPITOL COMPOUND, BRGY. KENRAM, ISULAN, SULTAN KUDARAT21MF0050 · ₱9,899,241.22 · mapped
- CONSTRUCTION OF PROVINCIAL TOURISM MULTI-PURPOSE BUILDING, NEW CAPITOL SITE, BRGY. KENRAM, ISULAN, SULTAN KUDARAT20MF0084 · ₱9,886,740.54 · mapped
- COMPLETE CONSTRUCTION OF MODIFIED ONE (1) STOREY THREE (3) CLASSROOM SCHOOL BUILDING WITH HANDWASHING AREA BOTH SIDES AND TOILET @ EACH CLASSROOM, PINGUIAMAN ELEM. SCHOOL, LAMBAYONG, SULTAN KUDARAT20MF0061 · ₱6,155,879.29 · mapped
- COMPLETE CONSTRUCTION OF MODIFIED ONE (1) STOREY THREE (3) CLASSROOM SCHOOL BUILDING WITH HANDWASHING AREA BOTH SIDES AND TOILET @ EACH CLASSROOM, MALINGON E/S, PRES. QUIRINO, SULTAN KUDARAT20MF0062 · ₱6,032,246.94 · mapped
- TINUMIGUEZ BRIDGE 2 (B01680MN) ALONG DULAWAN - MARBEL ROAD, LAMBAYONG, SULTAN KUDARAT21MF0016 · ₱4,899,999.19 · mapped
- CONCRETING OF BRGY. TINAUNGAN FARM TO MARKET ROAD, STA. 0+000 - STA. 0+310, BRGY. TINAUNGAN, PRES. QUIRINO, SULTAN KUDARAT.19MF0061 · ₱4,846,573.55 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (SK TOURISM HALL), BRGY. KENRAM, ISULAN, SULTAN KUDARAT20MF0087 · ₱2,963,958.31 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (NEW BARANGAY HALL) AT BRGY. KAPINGKONG, LAMBAYONG, SULTAN KUDARAT.19MF0048 · ₱2,959,998.29 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (NEW BARANGAY HALL) AT BRGY. MAMALI, LUTAYAN, SULTAN KUDARAT.19MF0046 · ₱2,959,998.29 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (NEW BARANGAY HALL) AT BRGY. KOLAMBOG, ISULAN, SULTAN KUDARAT.19MF0049 · ₱2,959,271.88 · mapped
- CONSTRUCTION OF NARRA PARK MULTI-PURPOSE BUILDING AT BRGY. KALAWAG 2, ISULAN, SULTAN KUDARAT20MF0050 · ₱2,959,231.38 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (NARRA PARK GYM) AT BRGY. KALAWAG 2, ISULAN, SULTAN KUDARAT20MF0066 · ₱2,958,798.84 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. KUDANDING, ISULAN, SULTAN KUDARAT20MF0048 · ₱2,958,574.79 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. KALAWAG 2, ISULAN, SULTAN KUDARAT20MF0035 · ₱2,958,481.82 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING AT BRGY. TUMIAO, LAMBAYONG, SULTAN KUDARAT20MF0047 · ₱2,952,254.20 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING AT BRGY. PIMBALAYAN, LAMBAYONG, SULTAN KUDARAT20MF0041 · ₱2,952,254.20 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (MINI GYM) AT BRGY. PINGUIAMAN, LAMBAYONG, SULTAN KUDARAT.19MF0032 · ₱2,464,903.31 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (MINI GYM) AT DR. MANUEL J. GRIÑO MEMORIAL CENTRAL ELEMENTARY SCHOOL, TACURONG CITY, SULTAN KUDARAT.19MF0051 · ₱2,266,997.89 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (MINI GYM) AT BRGY. CALEAN, TACURONG CITY, SULTAN KUDARAT.19MF0050 · ₱2,266,997.89 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI - PURPOSE BUILDING (MINI GYM) AT BRGY. IMPAO, ISULAN, SULTAN KUDARAT.19MF0034 · ₱2,266,773.97 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (MINI GYM) AT BAMAB ELEMENTARY SCHOOL, BRGY. BAMBAD, ISULAN, SULTAN KUDARAT.19MF0044 · ₱2,265,996.77 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (MINI GYM) AT TALIPASAN ELEMENTARY SCHOOL, BRGY. DANSULI, ISULAN, SULTAN KUDARAT.19MF0033 · ₱2,166,393.23 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. GRIÑO, TACURONG CITY, SULTAN KUDARAT20MF0034 · ₱1,980,000.00 · mapped
- CONSTRUCTION OF LOCAL ACCESS ROADS FROM BRGY. LAGAO TO BRGY. KAPINGKONG, LAMBAYONG, SULTAN KUDARAT20MF0063 · ₱1,964,886.43 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING AT SITIO KAMANGA, BRGY. LAGUILAYAN, ISULAN, SULTAN KUDARAT20MF0049 · ₱1,964,065.45 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI - PURPOSE BUILDING (MINI GYM) AT BRGY. LIBERTAD, COLUMBIO, SULTAN KUDARAT.19MF0035 · ₱1,472,452.17 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI - PURPOSE BUILDING (NEW BARANGAY HALL) AT BRGY. UDTONG, LAMBAYONG, SULTAN KUDARAT.19MF0039 · ₱989,075.44 · mapped
- REHABILITATION OF MULTI - PURPOSE BUILDING AT BRGY. EDAY, COLUMBIO, SULTAN KUDARAT20MF0052 · ₱497,869.95 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING AT BRGY. NATIVIDAD, COLUMBIO, SULTAN KUDARAT20MF0056 · ₱497,783.78 · mapped
- REHABILITATION OF MULTI - PURPOSE BUILDING AT BRGY. MAKAT, COLUMBIO, SULTAN KUDARAT20MF0054 · ₱497,626.73 · mapped
- REHABILITATION OF MULTI - PURPOSE BUILDING AT BRGY. ELBEBE, COLUMBIO, SULTAN KUDARAT20MF0051 · ₱496,904.73 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. MAYO, COLUMBIO, SULTAN KUDARAT20MF0055 · ₱496,799.33 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. POLOMOLOK, COLUMBIO, SULTAN KUDARAT20MF0057 · ₱496,517.15 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. SINAPULAN, COLUMBIO, SULTAN KUDARAT20MF0058 · ₱496,235.04 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING AT BRGY. TELAFAS, COLUMBIO, SULTAN KUDARAT20MF0059 · ₱495,371.39 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING AT BRGY. LOMOYON, COLUMBIO, SULTAN KUDARAT20MF0053 · ₱494,680.51 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →