EARTHLINE CONST is listed as a company organization in Philippine public procurement records on this site, with 11 linked DPWH project(s) totaling about ₱139,031,602.44. Recorded delivery grade F (from public DPWH project records — not a finding of wrongdoing).
EARTHLINE CONST
FGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 11
- Total value
- ₱139,031,602.44
- Published flags
- 0
- Region
- Region V · Region V
Public Record Grade
A transparent, data-derived summary of reported public records for EARTHLINE CONST — not an accusation or finding of wrongdoing.
Score: 58.00 / 100 · Projects in sample: 11 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 0/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 0
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 0
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 11
- pastTargetOngoingProjects
- 11
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 11
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 11
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 11
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 11
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
11 geotagged projects — Open full map · Download projects (CSV)
- CONCRETING OF BRGY. HAMORAWON FMR, BRGY. HAMORAWON, RAPU-RAPU, ALBAY24FB0234 · ₱28,741,794.84 · mapped
- CONCRETING OF BRGY. DAPDAP FMR, RAPU-RAPU, ALBAY24FB0235 · ₱28,741,613.76 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF VARIOUS SOLAR WATER SYSTEM LEVEL II, IN THE MUNICIPALITY OF OAS, ALBAY, SAN MIGUEL, CAMAGONG, BANAO AND TOBGON,O23F00307 · ₱19,208,465.14 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF VARIOUS SOLAR WATER SYSTEM LEVEL II,IN THE MUNICIPALITY OF GUINOBATAN, ALBAY, SAN JOSE, MALIPO AND SAN FRANCISCO23F00306 · ₱14,394,743.70 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM - CONSTRUCTION OF VARIOUS SOLAR WATER SYSTEM LEVEL II, IN THE MUNICIPALITY OF DARAGA, ALBAY24FB0149 · ₱9,613,250.42 · mapped
- CONCRETING OF BRGY. BUHATAN FMR, BRGY. BUHATAN, RAPU-RAPU, ALBAY24FB0233 · ₱9,575,519.63 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF VARIOUS SOLAR WATER SYSTEM LEVEL II, IN THE MUNICIPALITY OF POLANGUI, ALBAY, BALANGIBANG AND MATACON, POLANGUI,23F00308 · ₱9,575,237.53 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF SOLAR WATER SYSTEM LEVEL II, BRGY. SAN AGUSTIN, LIBON, ALBAY, LIBON, ALBAY (3RD LEGISLATIVE DISTRICT)23F00311 · ₱4,799,144.46 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF SOLAR WATER SYSTEM LEVEL II AT BRGY. BACOLOD, MAGALLANES. SORSOGON23F00238 · ₱4,796,625.08 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF SOLAR WATER SYSTEM LEVEL II,BRGY. BASICAO COASTAL, PIO DURAN, ALBAY, BASICAO COASTAL, PIO DURAN, ALBAY (3RD LEGI23F00312 · ₱4,792,603.94 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF SOLAR WATER SYSTEM LEVEL II, IN THE MUNICIPALITY OF JOVELLAR, ALBAY, SALVACION, JOVELLAR, ALBAY (3RD LEGISLATIVE23F00310 · ₱4,792,603.94 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 15 awards · ₱650,741,423.04
- Concreting of Brgy. Hamorawon FMR₱9,575,519.63· 2024-10-02· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ALBAY 2ND DEO
- Concreting of Brgy. Buhatan FMR, Brgy. Buhatan₱9,575,519.63· 2024-10-02· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ALBAY 2ND DEO
- Concreting of Brgy. Dapdap FMR, Rapu-Rapu, Albay₱28,741,613.76· 2024-10-02· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ALBAY 2ND DEO
- OO2 Protect Lives and Properties Against Major Fl₱125,845,296.09· 2024-09-05· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ALBAY 2ND DEO
- 24F00079
- 23FN0105₱162,746,400.48· 2024-05-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CAMARINES SUR 5TH
- Construction of Various Solar Water System₱9,613,250.42· 2024-05-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ALBAY 2ND DEO
- 23F00308
- 23F00238
- 23F00306
- 23F00311
- 23F00307
- 23F00310
- 23F00312
- Contract ID No. 23FA0063₱95,854,354.03· 2023-08-31· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ALBAY 1ST DEO
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →