HONEXSON BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 6 linked DPWH project(s) totaling about ₱197,856,567.66. Recorded delivery grade D (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
HONEXSON BUILDERS
DRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 6
- Total value
- ₱197,856,567.66
- Published flags
- 0
- Region
- Davao del Sur DEO · Region XI
Online presence
Google Maps: HonexsonGoogle Maps, 2026-10-22
Carlos P. Garcia National Hwy, Talomo, Davao City, Davao del Sur
Licensed officers (PCAB)
- Honey L. Lopez · Authorized Managing Officer (PCAB license 22288) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for HONEXSON BUILDERS — not an accusation or finding of wrongdoing.
Score: 68.00 / 100 · Projects in sample: 6 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 33.3/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 33.3
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 3
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 6
- pastTargetOngoingProjects
- 3
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 6
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 6
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 6
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 6
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
5 geotagged projects — Open full map
- CONSTRUCTION OF COASTAL ROAD INCLUDING BIKE LANES WITH SOLAR LIGHTS(APLAYA-DAWIS SECTION, PHASE 1), DIGOS CITY, DAVAO DEL SUR23LD0090 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF WATER SYSTEM AT BARANGAY GUIHING, HAGONOY, DAVAO DEL SUR24LD0112 · ₱29,400,000.00 · mapped
- CONSTRUCTION OF SITIO PARADISE- SITIO SABWAG, BARANGAY KAPATAGAN, DIGOS CITY, DAVAO DEL SUR24LD0111 · ₱29,400,000.00 · mapped
- CONSTRUCTION OF POBLACION-PALILI ROAD, SULOP, DAVAO DEL SUR25LD0201 · ₱19,388,008.62 · mapped
- CONSTRUCTION OF NEW PADADA PUBLIC TERMINAL IN THE MUNICIPALITY OF PADADA, DAVAO DEL SUR23LD0081 · ₱19,207,809.18 · mapped
- REPAIR/REHAB OF MPB, PACKAGE 4, A) REPAIR/REHAB OF MPB @ BRGY.19-B, DAVAO CITY, B) REPAIR/REHAB OF M17LB0060 · ₱3,960,749.86
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
