KBL BUILDERS CONST is listed as a company organization in Philippine public procurement records on this site, with 16 linked DPWH project(s) totaling about ₱197,262,315.94. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
KBL BUILDERS CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 16
- Total value
- ₱197,262,315.94
- Published flags
- 0
- Region
- Cagayan 2nd DEO · Region II
Public Record Grade
A transparent, data-derived summary of reported public records for KBL BUILDERS CONST — not an accusation or finding of wrongdoing.
Score: 85.40 / 100 · Projects in sample: 16 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 90.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 90.6
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 13
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 16
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 16
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 16
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 16
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 16
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
16 geotagged projects — Open full map · Download projects (CSV)
- CSSP- BASIC INFRASTRUCTURE PROGRAM (BIP)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF NAGSABARAN BRIDGE, BRGY. NAGSABARAN, CLAVERIA, CAGAYAN22BC0150 · ₱24,750,000.00 · mapped
- CONCRETING OF BRGY. LANGGAGAN-PATAGA-BACSAY FMR, SANCHEZ MIRA, CAGAYAN21BC0164 · ₱19,874,680.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, SANCHEZ MIRA, CAGAYAN22BC0149 · ₱19,677,040.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF CABICUNGAN FLOOD CONTROL PROJECT, C-4, CLAVERIA, CAGAYAN21BC0074 · ₱19,600,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS-MANILA NORTH RD- K0600+560-K0600+830, CLAVERIA, CAGAYAN22BC0009 · ₱14,700,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-CLAVERIA BAY VIEW BOULEVARD INCLUDING ACCESS ROAD, CLAVERIA, CAGAYAN22BC0130 · ₱14,577,620.00 · mapped
- CONCRETING OF BRGY. UNION FMR, BRGY. UNION, CLAVERIA, CAGAYAN21BC0158 · ₱12,935,000.00 · mapped
- CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT)-CENTRO 2-NAGBARANGANAN-CAGAYAN STATE UNIVERSITY ROAD CONNECTING TO CACAO PLANTATION AREA IN SUPPORT OF CACAO INDUSTRY, CENTRO 2, SANCHEZ MIRA, CAGAYAN22BC0055 · ₱12,237,340.00 · mapped
- CONCRETING OF BRGY. BACSAY CATARAOAN NORTE - BRGY. BACSAY CATARAOAN SUR FMR, BRGY. BACSAY CATARAOAN NORTE & BRGY. BACSAY CATARAOAN SUR, CLAVERIA, CAGAYAN23BC0139 · ₱11,940,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM -TRIP)-ACCESS ROAD LEADING TO GARAW-GARAW FALLS IN KITTAG, SANCHEZ MIRA, CAGAYAN21BC0020 · ₱9,800,000.00 · mapped
- CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-SANCHEZ MIRA BAY VIEW BOULEVARD INCLUDING ACCESS ROAD LEADING TO BEACH RESORTS, SANCHEZ MIRA, CAGAYAN23BC0083 · ₱9,800,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ACCESS ROAD LEADING TO GARAW-GARAW FALLS IN KITTAG, SANCHEZ MIRA, CAGAYAN22BC0040 · ₱9,800,000.00 · mapped
- CONCRETING OF BRGY. BUENAVISTA TO BRGY. MAGDALENA FMR, BRGY. BUENAVISTA AND BRGY. MAGDALENA, CLAVERIA, CAGAYAN20BC0234 · ₱8,961,386.55 · mapped
- CSSP:BASIC INFRASTRUCTURE PROGRAM-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF CURVA BRIDGE, PAMPLONA, CAGAYAN22BC0088 · ₱4,806,324.52 · mapped
- CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT)-MANLA NORTH ROAD TO CALLUNGAN-MASISIT ROAD LEADING TO COCONUT GROWERS, CALLUNGAN, SANCHEZ MIRA, CAGAYAN21BC0001 · ₱1,901,709.01 · mapped
- CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT) - MANILA NORTH ROAD TO LANGAGAN-SANTOR BANGAN ROAD LEADING TO COCONUT GROWERS, SANCHEZ MIRA, CAGAYAN PACKAGE II21BC0002 · ₱1,901,215.86 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →