GOLDEN ROADRUNNER INTERNATIONAL CORP is listed as a company organization in Philippine public procurement records on this site, with 62 linked DPWH project(s) totaling about ₱750,433,101.06. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
GOLDEN ROADRUNNER INTERNATIONAL CORP
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 62
- Total value
- ₱750,433,101.06
- Published flags
- 3
- Region
- Iloilo 1st DEO · Region VI
Licensed officers (PCAB)
- Stephen Kho Gurrea · Authorized Managing Officer (PCAB license 10177) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for GOLDEN ROADRUNNER INTERNATIONAL CORP — not an accusation or finding of wrongdoing.
Score: 82.30 / 100 · Projects in sample: 62 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 69.4/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 69.4
- lateCompletedProjects
- 17
- onTimeCompletedProjects
- 38
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 61
- pastTargetOngoingProjects
- 6
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 95.2/100 · Weight: 21%
- totalProjects
- 62
- componentScore
- 95.2
- terminatedProjects
- 1
- terminationRatePct
- 1.6
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 62
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 98.5/100 · Weight: 11%
- projects
- 62
- componentScore
- 98.5
- flagsPerProject
- 0.05
- publishedV2Flags
- 3
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 62
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 59 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- PREVENTIVE MAINTENANCE OF ROAD:ASPHALT OVERLAY-AT SPECIFIC LOCATIONS ALONG CENTRAL RD (SN MIGUEL-CONSTANCIA-CABANO-IGCAWAYAN) (S00025GR) K0057+000 - K0066+61420GE0072 · ₱28,203,079.11 · mapped
- CONSTRUCTION OF CAMANGAHAN RIVER CONTROL ALONG JARAO RIVER, GUIMBAL, ILOILO20GF0022 · ₱27,929,900.30 · mapped
- PREVENTIVE MAINTENANCE - TIOLAS-SINUGBUHAN RD-K0060+380-K0061+000, K0063+926-K0064+864,K0067+510-K0067+717,K0070+143-K0070+675,K0072+921-K0072+1091,K0072+1091-K0073+059,K0073+059-K0073+112,K0073+161-K0073+29222GF0069 · ₱27,243,936.46 · mapped
- CONST. OF REVETMENT/RETAINING WALL ALONG MAKATO RIVER, BRGY. POBLACION, MAKATO, AKLAN20GA0062 · ₱26,877,870.51 · mapped
- CONSTRUCTION OF BUNGSUAN- LAWAAN BRIDGE, BARANGAY LAWAAN, DUMARAO, CAPIZ24GP0046 · ₱24,725,499.96 · mapped
- WIDENING OF BRIDGE - MATUBANG BR. (B00051PN) ALONG JCT NATL RD-DUMARAO-SAN RAFAEL (ILOILO) RD22GP0061 · ₱24,439,792.97 · mapped
- CONST. OF BREAKWATER AND SEAWALL, BRGY. UNIDOS, NABAS, AKLAN20GA0186 · ₱23,511,169.70 · mapped
- CONCRETING OF GUIMBAL LOCAL ROAD, GUIMBAL, ILOILO19GF0068 · ₱23,505,005.22 · mapped
- CONSTRUCTIO/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION - TUBUNGAN-IGTUBLE-SAN REMEGIO ROAD LEADING TO TOURISM AND AGRI-CENTER, ILOILO22GF0062 · ₱22,049,372.43 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - TUBUNGAN-IGTUBLE-SAN REMEGIO ROAD LEADING TO TOURISM AND AGRI-CENTER, ILOILO21GF0037 · ₱21,735,372.90 · mapped
- PREVENTIVE MAINTENANCE ILOILO-ANTIQUE RD K0010+231 K0010+660, K0011+086 K0011+72122GF0005 · ₱20,978,938.27 · mapped
- CONSTRUCTION OF POBLACION-GUINOTOS BRIDGE, BARANGAY POBLACION ILAWOD, DUMARAO, CAPIZ22GP0002 · ₱19,798,513.29 · mapped
- CONSTRUCTION OF BRIDGE, GUINOTOS BRIDGE, BARANGAY GUINOTOS, DUMARAO, CAPIZ21GP0044 · ₱19,797,012.96 · mapped
- Construction / Improvement of Cutoff Channel And Waterway Along Guimbal River, Guimbal, Iloilo21GF0125 · ₱19,603,507.77 · mapped
- CONST. OF FLOOD CONTROL (REVETMENT WALL) ALONG MAKATO RIVER, POBLACION, MAKATO, AKLAN20GA0061 · ₱19,599,709.17 · mapped
- Construction of Siwaragan River Flood Control Project, San Joaquin, Iloilo22GF0002 · ₱19,403,838.46 · mapped
- CONSTRUCTION OF BRIDGE AT BARANGAY NAGSULANG - LAWAAN, BARANGAY NAGSULANG, DUMARAO, CAPIZ23GP0079 · ₱17,818,032.64 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ILOILO-CAPIZ RD (NEW ROUTE) (S00254PN) - K0064+150 - K0065+37722GP0045 · ₱15,855,130.46 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLAPSE, AND LANDSLIDE - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0025+175 - K0025+25522HM0046 · ₱15,619,310.76 · mapped
- CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION/REHABILITATION OF ROAD, BALABAGO, ILOILO CITY22GJ0048 · ₱15,364,261.97 · mapped
- INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG ILOILO-CAPIZ RD (NEW ROUTE) - K0074 + 375 - K0075 + 65925GP0001 · ₱15,053,999.38 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ILOILO EAST COAST - CAPIZ RD (S00228PN) - K0236+832 - K0237+390, BAROTAC VIEJO, ILOILO22GH0061 · ₱14,704,900.00 · mapped
- IMPROVEMENT OF INTERSECTION AT ILOILO - CAPIZ (NEW ROUTE) - K0049 + 22025GG0231 · ₱14,647,896.58 · mapped
- CONSTRUCTION OF BUNGSUAN-LAWAAN BRIDGE, BRGY. LAWAAN, DUMARAO, CAPIZ22GP0074 · ₱13,718,123.41 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - AT SPECIFIC LOCATIONS ALONG ROXAS CITY-CAGAY-SIBAGUAN-BALIJUAGAN-CUDIAN-IVISAN RD (S00278PN) KO110+298 - KO111+20422GD0018 · ₱13,061,100.61 · mapped
- RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - MIAGAO - IGBARAS ROAD (K0037+252 - K0037+605, K0040+981 - K0041+102, K0045+854 - K0046+011), IGBARAS, ILOILO19GF0004 · ₱11,381,211.93 · mapped
- RECONSTRUCTION TO CONCRETE PAVEMENT - ALONG ILOILO-CAPIZ RD (NEW ROUTE) (S00254PN) K0100+623 - K0101+00019GP0037 · ₱10,558,888.30 · mapped
- CONSTRUCTION OF MODIFIED STANDARD DPWH - DEPED 1 UNIT 2 STOREY 2 SCIENCE LABORATORY, ESTANCIA NHS, ESTANCIA, ILOILO18GH0168 · ₱10,112,594.57 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - IGBARAS-PASSI-IGCABUGAO-IGBOLO RD LEADING TO IGCABUGAO CAVE, IGBARAS, ILOILO22GF0033 · ₱9,799,998.80 · mapped
- Construction of Guimbal Shoreline Protection, Guimbal, Iloilo22GF0047 · ₱9,703,498.97 · mapped
- Construction of Camangahan River Flood Control Project, Guimbal, Iloilo22GF0013 · ₱9,701,673.55 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, INGAY RIVER, TUBUNGAN, ILOILO21GF0048 · ₱9,699,081.24 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TANGYAN RIVER, IGBARAS, ILOILO21GF0057 · ₱9,696,106.62 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-IGBARAS-PASSI-IGCABUGAO-IGBOLO RD LEADING TO IGCABUGAO CAVE, IGBARAS, ILOILO21GF0102 · ₱9,651,406.80 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0027+135 - K0027+60322HM0023 · ₱9,603,248.05 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ILOILO-ANTIQUE RD- K0016+845 - K0017+646, TIGBAUAN, ILOILO21GF0009 · ₱9,502,610.52 · mapped
- PREVENTIVE MAINTENANCE- OTON-MAMBOG-CABOLOAN-ABILAY-SN JOSE RD - K0012+000-K0012+659, K0015+604-K0015+810, K0018+292-K0018+38322GF0016 · ₱9,432,980.52 · mapped
- CONSTRUCTION OF SIWARAGAN RIVER CONTROL, SAN JOAQUIN, ILOILO20GF0024 · ₱9,308,231.62 · mapped
- REHABILITATION OF WEIGHBRIDGE STATION, BARANGAY AGLALANA, DUMARAO, CAPIZ22GP0088 · ₱8,809,999.53 · mapped
- CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - PRESIDENT CORAZON C. AQUINO AVE. - (S00558PN) CHAINAGE 1203 - CHAINAGE 185721G00147 · ₱8,684,965.96 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - OTON - MAMBOG - CABOLO-AN - ABILAY - SN JOSE RD - K0017 + 275 - K0018 + 094, OTON, ILOILO21GF0006 · ₱8,559,588.92 · mapped
- CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - PRESIDENT CORAZON C. AQUINO AVE. - (S00558PN) CHAINAGE 549 - CHAINAGE 120321G00025 · ₱8,245,699.16 · mapped
- (RE-AD) PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - SEN. BENIGNO S. AQUINO, JR. AVE (S00495PN)-K0007+816 - K0007 + 980, (S00508PN) K0006+(-251) - K0006+(-040)23GJ0106 · ₱7,965,627.52 · mapped
- CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION/REHABILITATION OF ROAD, JARO, ILOILO CITY22GJ0045 · ₱7,919,999.57 · mapped
- CONCRETING OF ROAD AT PRESENTACION DIEZ NHS, BRGY. CALAPAWAN, DUMARAO, CAPIZ19GP0008 · ₱7,540,017.67 · mapped
- PREVENTIVE MAINTENANCE - GUIMBAL-IGBARAS-TUBUNGAN-LEON RD - K0033+055 - K0033+396, K0035+000 - K0035+11622GF0081 · ₱7,458,044.20 · mapped
- CONSTRUCTION OF SAGASA-TUGUISAN LOCAL ROAD, BRGY. RIZAL TUGUISAN, MUNICIPALITY OF GUIMBAL, ILOILO21GF0089 · ₱5,880,185.99 · mapped
- (RE-AD) - CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF ROAD, MANDURRIAO, ILOILO CITY23GJ0062 · ₱4,944,982.54 · mapped
- Construction of Drainage System in Molo, Iloilo City, Iloilo23GJ0031 · ₱4,939,923.08 · mapped
- Construction of Calampitao River Flood Control Project, Guimbal, Iloilo22GF0067 · ₱4,851,128.23 · mapped
Equipment & capacity
PCAB license
- License no.
- 10177
- Category
- D · Small B
- Minimum net worth for this category
- ₱2,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱30M
- License valid until
- Dec 22, 2026
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 10177); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
4 evaluations listed across 3 GPPB CPES releases; average final rating 89.3% over 3 rated projects; 4 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Nov 21, 2023 | DPWH | ₱24,964,555.00 | Completed | 92.4% | 92.4% | 37th, p. 43 |
| Mar 24, 2023 | DPWH | ₱15,840,000.00 | Completed | 72.3% | 81.5% | 35th, p. 68 |
| Mar 6, 2023 | DPWH | ₱9,800,000.00 | Completed | 93.9% | 93.9% | 35th, p. 68 |
| Jun 29, 2022 | DPWH | ₱15,364,262.00 | On-going | 88.1% | — | 34th, p. 33 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →