E A AYALA CONST AND SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 79 linked DPWH project(s) totaling about ₱327,400,808.72. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
E A AYALA CONST AND SUPPLY
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 79
- Total value
- ₱327,400,808.72
- Published flags
- 0
- Region
- Quezon 1st DEO · Region IV-A
Online presence
Google Maps: Ayala Construction Supply IncorporatedGoogle Maps, 2026-10-22
1100 Epifanio de los Santos Ave, Quezon City, Metro Manila
Licensed officers (PCAB)
- Edgardo Abracia Ayala · Authorized Managing Officer (PCAB license 37139) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for E A AYALA CONST AND SUPPLY — not an accusation or finding of wrongdoing.
Score: 94.80 / 100 · Projects in sample: 79 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 96.2/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 96.2
- lateCompletedProjects
- 6
- onTimeCompletedProjects
- 73
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 79
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 79
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 79
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 79
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 79
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 41 of 55 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF TUBIGAN BRIDGE GOING TO BRGY. PINAGBAYAN, PITOGO, QUEZONPITOGO, QUEZON22DM0096 · ₱14,700,000.00 · mapped
- CONSTRUCTION OF 3 STOREY NINE(9) CLASSROOM SCHOOL BUILDING AT SIBALOM NHS, SIBALOM, ANTIQUE16GB0244 · ₱14,200,763.91
- CONSTRUCTION OF 2 STOREY TEN(10) CLASSROOM SCHOOL BUILDING AT GOVERNOR JULIAN FULLON PACIFICADOR NS,16GB0245 · ₱12,240,366.07 · mapped
- CONSTRUCTION OF WATER SYSTEM PROJECT BARANGAY SILANGANG PALALE (LEVEL 2) TAYABAS CITY-QUEZON17DK0100 · ₱11,580,000.00 · mapped
- CONSTRUCTION OF THREE(3) UNITS ONE(1) STOREY WORKSHOP BUILDING (REGULAR) PATNANUNGAN NATIONAL HIGH SCHOOL, PATNANUNGAN17DK0211 · ₱10,635,555.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY DITA & BONGKOL, LILIW, LAGUNA22DP0026 · ₱7,840,000.00 · mapped
- CONSTRUCTION OF TWO(2) UNITS ONE(1) STOREY UNIQUE WORKSHOP BUILDING @ SAMPALOC NATIONAL HIGH SCHOOL, SAMPALOC, QUEZON17DK0195 · ₱7,679,410.00 · mapped
- CONSTRUCTION OF TWO(2) UNITS ONE(1) STOREY WORKSHOP BUILDING (SCIENCE LABORATORY) @ BUSDAK NATIONAL HIGH SCHOOL, FORMERLY BUSDAK NATIONAL HIGH SCHOOL, PATNAUNGAN NATIONAL HIGH SCHOOL ANNEX, PATNANUNGAN, QUEZON17DK0152 · ₱7,488,370.00 · mapped
- CONSTRUCTION OF TWO(2) UNITS ONE(1) STOREY WORKSHOP BUILDING (REGULAR) @ BUSDAK NATIONAL HIGH SCHOOL, FORMERLY BUSDAK NATIONAL HIGH SCHOOL, PATNANUNGAN NATIONAL HIGH SCHOOL ANNEX, PATNANUNGAN, QUEZON17DK0151 · ₱7,488,370.00 · mapped
- CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-ARCO BRIDGE (B02749LZ) LUCENA-TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT ROAD18DK0021 · ₱7,350,000.00 · mapped
- CONSTRUCTION OF TWO(2) UNITS ONE(1) STOREY WORKSHOP BUILDING (INFORMATION COMMUNICATION TECHNOLOGY LABORATORY) @ JOMALIG NATIONAL HIGH SCHOOL, JOMALIG, QUEZON17DK0138 · ₱7,090,370.00 · mapped
- CONSTRUCTION OF TWO(2) UNITS ONE(1)STOREY WORKSHOP BUILDING (SCINECE LABORATORY) @ JOMALIG NATIONAL HIGH SCHOOL, JOMALIG, QUEZON17DK0137 · ₱7,090,370.00 · mapped
- CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF TVL AND OTHER WORKSHOPS, EVARISTO R. MACALINTAL MNHS (FORMERLY COMETA NHS), 1 UNIT - SCIENCE LABS, 1 UNIT - ICT LABS, QUEZON, QUEZON18DL0115 · ₱7,019,468.89 · mapped
- CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF TVL AND OTHER WORKSHOPS, PABLO D. MANINGAS NATIONAL HIGH SCHOOL, 1 UNIT - SCIENCE LABS, 1 UNIT - ICT LABS, QUEZON, QUEZON18DL0116 · ₱7,019,430.37 · mapped
- CONSTRUCTION OF TWO(2) UNITS ONE(1) STOREY WORKSHOP BUILDING (REGULAR) @ POLILLO NATIONAL HIGH SCHOOL, POLILLO, QUEZON17DK0170 · ₱6,990,870.00 · mapped
- CONSTRUCTION OF TWO(2) UNITS ONE(1) STOREY WORKSHOP BUILDING (INFORMATION COMMUNICATION TECHNOLOGY LABORATORY) @ POLILLO NATIONAL HIGH SCHOOL, POLILLO, QUEZON17DK0202 · ₱6,990,870.00 · mapped
- CONSTRUCTION OF TWO(2) UNITS ONE(1) STOREY WORKSHOP BUILDING (SCIENCE LABORATORY) @ POLILLO NATIONAL HIGH SCHOOL, POLILLO, QUEZON17DK0201 · ₱6,990,870.00 · mapped
- CONSTRUCTION OF TWO(2) UNITS ONE(1) STOREY WORKSHOP BUILDING (SCIENCE LABORATORY) @ TALUONG NATIONAL HIGH SCHOOL, POLILLO, QUEZON17DK0215 · ₱6,990,870.00
- CONSTRUCTION OF TWO(2) UNITS ONE(1) STOREY WORKSHOP BUILDING(SCIENCE LABORATORY) @ SILANGANG MALICBOY NATIONAL HIGH SCHOOL, PAGBILAO, QUEZON17DK0139 · ₱6,692,370.00
- CONCRETING OF BRGY. PUTING BUHANGIN FARM TO MARKET ROAD, BRGY. PUTING BUHANGIN, MOGPOG17EA0109 · ₱6,484,198.70
- LOCAL INFRA PROGRAM (LIP) BLDGS. & OTHER STRUCTURE-CONST/IMPV'T OF MPB/FACILITIES IN BURDEOS, QUEZON16DK0008 · ₱6,093,519.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL ALONG BURDEOS RIVER, BARANGAY POBLACION, BURDEOS, QUEZON18DK0046 · ₱4,900,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL ALONG AMOT RIVER, BURDEOS, QUEZON18DK0045 · ₱4,900,000.00 · mapped
- CONSTRUCTION OF LOCAL ROAD, SITIO JAPLIT, BRGY. DEL ROSARIO, TIAONG, QUEZON16DJ0007 · ₱4,712,395.47
- CONCRETING OF BACHAO-TABIONAN FARM TO MARKET ROAD, BACHAO-TABIONAN17EA0104 · ₱4,655,452.45
- CONSTRUCTION OF ONE(1) STOREY THREE(3) CLASSROOM SCHOOL BUILDING @ SAMPALOC NATIONAL HIGH SCHOOL, SAMPALOC, QUEZON17DK0090 · ₱4,645,655.00 · mapped
- CONCRETING OF BRGY. IPIL-SITIO BATHALA FAR TO MARKET ROAD, BRGY. IPIL17EA0097 · ₱4,631,567.96
- CONSTRUCTION OF ONE(1) STOREY THREE(3) CLASSROOM SCHOOL BUILDING, GENERAL NAKAR CENTRAL SCHOOL, GENERAL NAKAR, QUEZON17DK0081 · ₱4,257,748.10 · mapped
- LOCAL INFRA PROGRAM (LIP) BLDGS/FACILITIES IN PATNANUNGAN & JOMALIG, QUEZON16DK0009 · ₱3,977,668.34 · mapped
- CONSTRUCTION OF ONE(1) STOREY TWO(2) CLASSROOM SCHOOL BLDG @ PAARALANG SEKUNDARYA NG HENERAL NAKAR (MALIGAY17DK0083 · ₱3,658,615.00
- CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF TVL AND OTHER WORKSHOPS, ALABAT ISLAND NATIONAL HIGH SCHOOL, 1 UNIT - ICT LAB, ALABAT, QUEZON18DL0113 · ₱3,655,504.89 · mapped
- CONSTRUCTION OF ONE(1) STOREY WORKSHOP BUILDING (INFORMATION COMMUNICATION TECHNOLOGY LABORATORY) @ BURDEOS NATIONAL HIGH SCHOOL (JUDITH NHS) BURDEOS, QUEZON17DK0122 · ₱3,644,685.00 · mapped
- CONSTRUCTION OF ONE(1) STOREY WORKSHOP BUILDING (REGULAR) @ JOMALIG NATIONAL HIGH SCHOOL, JOMALIG, QUEZON17DK0136 · ₱3,545,185.00 · mapped
- CONSTRUCTION OF ONE(1) STOREY WORKSHOP BUILDING (REGULAR) @ BURDEOS NATIONAL HIGH SCHOOL (JUDITH NHS) BURDEOS, QUEZON17DK0120 · ₱3,545,185.00 · mapped
- CONSTRUCTION OF ONE(1) STOREY WORKSHOP BUILDING (SCIENCE LABORATORY) @ BURDEOS NATIONAL HIGH SCHOOL (JUDITH NHS) BURDEOS, QUEZON17DK0121 · ₱3,545,185.00 · mapped
- CONSTRUCTION OF ONE(1) STOREY TWO(2) CLASSROOM SCHOOL BUILDING @ LALO ELEMENTARY SCHOOL, TAYABAS CITY-QUEZON17DK0174 · ₱3,509,365.00 · mapped
- CONSTRUCTION OF ONE(1) STOREY TWO(2) CLASSROOM SCHOOL BUILDING @ CABUNGALUNAN ELEMENTARY SCHOOL, BURDEOS, QUEZON17DK0164 · ₱3,459,615.00 · mapped
- CONSTRUCTION OF ONE(1) STOREY TWO(2) CLASSROOM SCHOOL BUILDING @ BONBON ELEMENTARY SCHOOL, PANUKULAN, QUEZON17DK0168 · ₱3,409,865.00 · mapped
- CONSTRUCTION OF WATER SUPPLY LEVEL II STO. CRISTO, SARIAYA, QUEZON 2ND LD16DJ0005 · ₱3,392,630.33
- CONSTRUCTION OF ONE(1) STOREY WORKSHOP BUILDING (INFORMATION COMMUNICATION TECHNOLOGY LABORATORY) @ TONGOHIN NATIONAL HIGH SCHOOL, INFANTA, QUEZON17DK0130 · ₱3,346,185.00 · mapped
- CONSTRUCTION OF ONE(1) STOREY WORKSHOP BUILDING (SCIENCE LABORATORY) @ LANGGAS NATIONAL HIGH SCHOOL, INFANTA, QUEZON17DK0127 · ₱3,346,185.00 · mapped
- CY 2018 BASIC EDUCATIONAL FACILITIES FUND, (CONSTRUCTION OF CLASSROOMS) BATCH 3, CONSTRUCTION OF CLASSROOMS 1STY2CL, PAMBILAN ES , ALABAT, QUEZON18DL0367 · ₱3,234,427.08 · mapped
- CY 2018 BASIC EDUCATIONAL FACILITIES FUND, (CONSTRUCTION OF CLASSROOMS) BATCH 3, CONSTRUCTION OF CLASSROOMS 1STY2CL, ANGELES CAGLATE ES, ALABAT, QUEZON18DL0363 · ₱2,970,272.29 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING IN BARANGAY MABACAN, CALAUAN, LAGUNA22DP0063 · ₱2,970,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING @ PINAGBAYANAN, PAGBILAO, QUEZON18DK0033 · ₱2,970,000.00 · mapped
- CONSTRUCTION OF COVERED COURT REAL CENTRAL ELEMENTARY SCHOOL BARANGAY POBLACION, REAL, QUEZON18DK0031 · ₱2,970,000.00 · mapped
- CONSTRUCTION OF ONE(1) STOREY TWO(2) CLASSROOM SCHOOL BUILDING @ BINULASAN INTEGRATED SCHOOL (ELEMENTARY) INFANTA, QUEZON17DK0084 · ₱2,941,557.90 · mapped
- REHAB/MAJOR REPAIR OF PERMANENT BRIDGE (BATAAN BRIDGE-B02750LZ) ALONG LUCENA-TAYABAS-LUCBAN-SAMPALOC15DK0136 · ₱2,725,434.57 · mapped
- REHAB/MAJOR REPAIR OF PERMANENT BRIDGE(GUNAO BRIDGE-B02751LZ) ALONG LUCENA-TAYABAS-LUCBAN-SAMPALOC-M15DK0137 · ₱2,724,643.21 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SIBULAN-BUCAO, POLILLO, QUEZON18DK0074 · ₱2,574,000.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 37139
- Category
- C · Small B
- Minimum net worth for this category
- ₱6,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱30M
- License valid until
- Oct 24, 2026
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 37139); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
5 evaluations listed across 2 GPPB CPES releases; average final rating 93.5% over 1 rated project; 5 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Mar 6, 2024 | DPWH 02/01/2023 DA 6,915.125 90 O 0.343 0.207 - 0.015 0.054 - #VALUE! - On-Going | ₱91,675,000.00 | Completed | 95.5% | 93.5% | 37th, p. 30 |
| Nov 15, 2023 | DPWH 07/13/2022 DA 6,915.125 90 O 0.287 0.300 - 0.030 0.041 0.033 #VALUE! - On-Going 10/05/2022 DA 6,915.125 90 O 0.346 0.240 - 0.030 0.048 - #VALUE! - On-Going | ₱59,302,750.00 | On-going | 91.4% | — | 37th, p. 30 |
| Feb 1, 2023 | DA | ₱6,915,125.00 | On-going | 61.9% | — | 35th, p. 44 |
| Oct 5, 2022 | DA | ₱6,915,125.00 | On-going | 66.4% | — | 35th, p. 44 |
| Jul 13, 2022 | DA | ₱6,915,125.00 | On-going | 69.1% | — | 35th, p. 44 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →