88 BUILDERS CONST is listed as a company organization in Philippine public procurement records on this site, with 39 linked DPWH project(s) totaling about ₱881,812,627.03. Recorded delivery grade D (from public DPWH project records — not a finding of wrongdoing).
88 BUILDERS CONST
DGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 39
- Total value
- ₱881,812,627.03
- Published flags
- 0
- Region
- Aklan DEO · Region IV-A
Licensed officers (PCAB)
- Esperanza Edejer Espinosa · Authorized Managing Officer (PCAB license 46381) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for 88 BUILDERS CONST — not an accusation or finding of wrongdoing.
Score: 69.70 / 100 · Projects in sample: 39 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 42.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 42.6
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 19
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 34
- pastTargetOngoingProjects
- 13
- undatedCompletedProjectsExcluded
- 4
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 39
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 39
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 39
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 39
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
38 geotagged projects — Open full map · Download projects (CSV)
- LOCAL PROGRAM - NATIONAL BUILDING PROGRAM -BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION (COMPLETION) OF DPWH BATAAN 1ST DEO BUILDING, ROMAN EXPRESSWAY, MULAWIN, ORANI, BATAANORANI, BATAAN23CA0024 · ₱92,713,338.75 · mapped
- CONSTRUCTION OF THREE (3) STOREY OFFICE BUILDING, DPWH LAGUNA 1ST DEO, STA. CRUZ, LAGUNA23DH0043 · ₱57,810,000.00 · mapped
- D. LOCAL PROGRAM 1. NATIONAL BUILDING PROGRAM A. BUILDING AND OTHER STRUCTURES 4. CONSTRUCTION OF TWO-STOREY BUILDING (DPWH STANDARD DESIGN) OF QUEZON 4TH DISTRICT ENGINEERING OFFICE INCLUDING OTHER FACILITIES, GUMACA, QUEZON (PHASE I)20DL0015 · ₱52,540,470.40 · mapped
- CONSTRUCTION OF DPWH BULACAN 2ND DEO OFFICE BUILDING PULONG BUHANGIN, STA. MARIA, BULACAN24CD0216 · ₱48,998,821.23 · mapped
- INSTALLATION OF ROAD LIGHTING ALONG SANTA MARIA NORZAGARAY ROAD K0035+200 K0038+500, SANTA MARIA, BULACAN24CD0085 · ₱48,976,545.24 · mapped
- CONSTRUCTION (COMPLETION) OF THREE (3) STOREY OFFICE BUILDING, DPWH LAGUNA 1ST DEO, STA. CRUZ, LAGUNA24DH0057 · ₱48,210,000.00 · mapped
- NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES - CONSTRUCTION OF NEW DPWH OFFICE BUILDING, BATAAN 3RD DEO (PHASE 2), BATAAN25CO0074 · ₱47,285,000.02
- LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - CONSTRUCTION NEW DPWH OFFICE BUILDING, BATAAN 3RD DEO, BATAAN, PROVINCE OF BATAAN24C00078 · ₱47,284,900.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (MOTORPOOL), BULACAN 2ND DISTRICT ENGINEERING OFFICE, SANTA MARIA, BULACAN25CD0096 · ₱33,610,300.00 · mapped
- LOCAL PROGRAM - NATIONAL BUILDING PROGRAM -BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION (COMPLETION) OF DPWH BATAAN 1ST DEO BUILDING (PHASE III), ROMAN EXPRESSWAY, MULAWIN, ORANI, BATAAN24CA0027 · ₱28,811,900.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT GYM), BULACAN 2ND DEO. STA. MARIA, BULACAN25CD0085 · ₱28,808,900.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (STAFF HOUSE) BULACAN 2ND DEO. STA. MARIA, BULACAN25CD0072 · ₱28,808,900.00 · mapped
- LOCAL PROGRAM, NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, REHABILITATION/IMPROVEMENT OF BATANGAS 3RD DISTRICT ENGINEERING OFFICE (CONSTRUCTION OF MOTORPOOL AND OTHER FACILITIES, TRAPICHE, TANAUAN CITY, BATANGAS20DC0038 · ₱23,324,274.00 · mapped
- LOCAL PROGRAM, BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - NATIONAL BUILDING PROGRAM, REHABILITATION AND IMPROVEMENT OF BATANGAS 3RD DEO, TRAPICHE AND BARANGAY 4, TANAUAN CITY, BATANGAS21DC0101 · ₱22,572,222.50 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES -CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY CALOOCAN, BALAYAN, BATANGAS23DB0070 · ₱19,800,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN SEBASTIAN, MATAASNA KAHOY, BATANGAS22DC0135 · ₱19,798,976.92 · mapped
- CONSTRUCTION OF DPWH AKLAN DEO BUILDING STAFF HOUSE KALIBO, AKLAN24GA0130 · ₱19,599,950.32 · mapped
- LOCAL PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION (COMPLETION) OF DPWH BATAAN 1ST DEO OFFICE BUILDING ORANI, BATAAN22CA0017 · ₱19,599,881.32 · mapped
- CONSTRUCTION (COMPLETION) OF TWO (2) STOREY OFFICE BUILDING, DPWH LAGUNA 1ST DEO, STA. CRUZ, LAGUNA24DH0053 · ₱19,599,207.12 · mapped
- CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS (BATCH 1) UNDER THE DEPED'S CY 2023 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF 2STY6CL, SAMPA-PACIFICO INTEGRATED SCHOOL, SANTA TERESITA, BATANGAS23DC0153 · ₱14,998,992.00 · mapped
- REHABILITATION OF DPWH AKLAN DEO STAFF HOUSE, BRGY. YAPAK, BORACAY ISLAND, MALAY, AKLAN24GA0231 · ₱14,553,000.00 · mapped
- REHABILITATION OF DPWH AKLAN DEO STAFF HOUSE BRGY. YAPAK, BORACAY ISLAND, MALAY, AKLAN23GA0098 · ₱14,551,976.80 · mapped
- CONSTRUCTION OF CLASSROOM BUILDING, ABANGAN NORTE ELEMENTARY SCHOOL, MARILAO, BULACAN24CD0199 · ₱11,869,407.86 · mapped
- BASIC INFRASTRUCTURE PROGRAM - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG PAKING RIVER, ORANI, BATAAN24CA0077 · ₱9,899,999.31 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY CALANGAY, SAN NICOLAS, BATANGAS22DC0131 · ₱9,899,960.83 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 1, CITY OF STO. TOMAS, BATANGAS22DC0142 · ₱9,899,594.85 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY STA. ANASTACIA, CITY OF STO. TOMAS, BATANGAS22DC0115 · ₱9,898,570.19 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TRAPICHE, TANAUAN CITY, BATANGAS22DC0117 · ₱9,897,419.83 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MAABUD NORTH, SAN NICOLAS, BATANGAS22DC0136 · ₱9,896,036.38 · mapped
- CONSTRUCTION OF DPWH BULACAN 2ND DEO OFFICE BUILDING (PHASE II), BARANGAY PULONG BUHANGIN, SANTA MARIA, BULACAN25CD0111 · ₱9,602,700.00 · mapped
- CONSTRUCTION OF MULTI - PURPOSE FACILITY, ABANGAN NORTE ELEMENTARY SCHOOL, MARILAO, BULACAN24CD0218 · ₱7,919,896.85 · mapped
- REHABILITATION OF ROAD, BRGY. MANOC-MANOC, MALAY, AKLAN24GA0030 · ₱6,791,397.39 · mapped
- CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING, CAMANCI NORTE ELEMENTARY SCHOOL, CAMANCI NORTE, NUMANCIA, AKLAN24GA0209 · ₱4,875,500.00 · mapped
- CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, HABANA ELEMENTARY SCHOOL, HABANA, NABAS, AKLAN24GA0212 · ₱4,875,001.75 · mapped
- CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING IN ALIMBO BAYBAY PRIMARY SCHOOL, BARANGAY ALIMBO BAYBAY, NABAS, AKLAN24GA0206 · ₱4,875,001.75 · mapped
- CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING, MALOCO NATIONAL HIGH SCHOOL, MALOCO, IBAJAY, AKLAN24GA0211 · ₱4,875,000.00 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, YAPAK, MALAY, AKLAN24GA0098 · ₱4,850,999.23 · mapped
- CONSTRUCTION OF ROAD BRGY. YAPAK, MALAY, AKLAN24GA0033 · ₱4,826,584.19 · mapped
- LOCAL PROGRAM, NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE / FACILITIES, CONSTRUCTION (COMPLETION) OF TWO STOREY BUILDING OF DPWH QUEZON 4TH DEO, GUMACA, QUEZON22DL0094 · ₱4,802,000.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 46381
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Jun 27, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 46381); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
1 evaluation listed across 1 GPPB CPES release; 1 site-visit rating. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Feb 18, 2025 | DPWH | ₱48,210,000.00 | On-going | 95.4% | — | 39th (rev), p. 5 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →