TRI-DAN-J CONST AND TRADING is listed as a company organization in Philippine public procurement records on this site, with 32 linked DPWH project(s) totaling about ₱204,162,006.69. Recorded delivery grade B (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
TRI-DAN-J CONST AND TRADING
BRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 32
- Total value
- ₱204,162,006.69
- Published flags
- 0
- Region
- Marinduque DEO · Region IV-B
Licensed officers (PCAB)
- Jovita Lomotan Gregorio · Authorized Managing Officer (PCAB license 44045) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for TRI-DAN-J CONST AND TRADING — not an accusation or finding of wrongdoing.
Score: 87.20 / 100 · Projects in sample: 32 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 85.9/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 85.9
- lateCompletedProjects
- 9
- onTimeCompletedProjects
- 23
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 32
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 32
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 32
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 32
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 32
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
32 geotagged projects — Open full map
- CONCRETING OF BRGY. MAINIT TO BINUNGA FMR, PHASE 2, BRGY. BINUNGA, BOAC, MARINDUQUE22EA0260 · ₱13,928,030.83 · mapped
- CONCRETING OF BRGY. BOGNUYAN FMR, BRGY. BOGNUYAN, GASAN, MARINDUQUE22EA0249 · ₱12,439,354.96 · mapped
- CONCRETING OF BRGY. MENDEZ FMR, BRGY. MENDEZ, MOGPOG, MARINDUQUE22EA0250 · ₱12,307,205.08 · mapped
- CONCRETING OF BRGY. BANGBANG FMR, BRGY. BANGBANG, GASAN, MARINDUQUE23EA0076 · ₱11,940,432.53 · mapped
- Construction (Completion) of Box Culvert Canal along C-4 Road from Lizan to 100 Interior Bagumbayan South, Navotas City24OA0004 · ₱11,759,144.81 · mapped
- CONSTRUCTION OF BOX CULVERT CANAL ALONG C-4 ROAD FROM LIZAN TO 100 INTERIOR BAGUMBAYAN SOUTH, NAVOTAS CITY22OA0066 · ₱9,793,494.09 · mapped
- CONSTRUCTION OF 1-STOREY, 3-CLASSROOM SCHOOL BUILDING AT SAYAO NATIONAL HIGH SCHOOL, BARANGAY SAYAO, MOGPOG, MARINDUQUE24EA0067 · ₱8,474,260.09 · mapped
- CONSTRUCTION OF TORRIJOS FIRE STATION BUILDING, TORRIJOS, MARINDUQUE22EA0205 · ₱7,838,190.52 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. POCTOY, BOAC, MARINDUQUE22EA0171 · ₱6,854,914.07 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY HINADHARAN, MOGPOG, MARINDUQUE22EA0065 · ₱6,794,413.69 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BUNGANAY, BOAC, MARINDUQUE22EA0057 · ₱6,789,422.21 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MALIGAYA, BOAC, MARINDUQUE22EA0082 · ₱6,789,408.65 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BICAS-BICAS, BUENAVISTA, MARINDUQUE22EA0049 · ₱6,789,375.92 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MALIBAGO, TORRIJOS, MARINDUQUE22EA0081 · ₱6,754,784.68 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. VILLA MENDEZ, MOGPOG, MARINDUQUE19EA0033 · ₱4,949,699.43 · mapped
- ROAD OPENING OF KILO-KILO ROAD TO KAWA-KAWA FALLS, KILO-KILO, STA. CRUZ, MARINDUQUE22EA0179 · ₱4,947,905.03 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. LAMESA, MOGPOG, MARINDUQUE19EA0020 · ₱4,915,594.43 · mapped
- CONSTRUCTION OF ROAD, BRGY. HINADHARAN, MOGPOG, MARINDUQUE19EA0015 · ₱4,899,083.94 · mapped
- CONSTRUCTION OF ROAD, BRGY. APITONG, BOAC, MARINDUQUE19EA0013 · ₱4,898,609.87 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. BACHAO ILAYA, GASAN, MARINDUQUE19EA0012 · ₱4,898,606.79 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. TAYTAY, STA. CRUZ, MARINDUQUE19EA0032 · ₱4,898,376.52 · mapped
- CONSTRUCTION OF ROAD, BRGY. HINADHARAN, MOGPOG, MARINDUQUE23EA0117 · ₱4,821,456.90 · mapped
- CONSTRUCTION OF ROAD, BRGY. BULIASNIN, BOAC, MARINDUQUE19EA0014 · ₱4,809,010.48 · mapped
- CONSTRUCTION OF ROAD, BRGY. SUHA, TORRIJOS, MARINDUQUE22EA0230 · ₱4,776,409.50 · mapped
- CONSTRUCTION OF ROAD, BRGY. MABUHAY, TORRIJOS, MARINDUQUE22EA0229 · ₱4,775,543.91 · mapped
- CONSTRUCTION OF EIGHT (8) UNITS OF MULTI-PURPOSE BUILDING AT TORRIJOS WHITE BEACH, BRGY. POCTOY, TORRIJOS, MARINDUQUE21EA0098 · ₱4,772,268.86 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BRGY. KAMANDUGAN, SANTA CRUZ, MARINDUQUE19EA0002 · ₱4,771,697.05 · mapped
- CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS-RAIN WATER COLLECTORS IN PUBLIC FACILITIES-PAWA E/S BOAC; PUYOG E/S BOAC, BOI E/S, BOAC; CANAT E/S, BOAC; ARGAO NHS, MOGPOG; MOGPOG COMPREHENSIVE NHS, MOGPOG; TIGUION N20EA0051 · ₱4,025,793.60 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BRGY. HALL), BRGY. TAGWAK, BOAC, MARINDUQUE21EA0121 · ₱2,864,839.13 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. MASIGA, GASAN, MARINDUQUE24EA0055 · ₱1,936,717.71 · mapped
- REPAIR OF COVERED COURTS IN STA. CRUZ, MARINDUQUE, BRGY. BALOGO, STA. CRUZ, MARINDUQUE18EA0211 · ₱1,900,533.13 · mapped
- PACKAGE 58--A)REPAIR OF DAY CARE CENTERS IN STA. CRUZ, MARINDUQUE, BRGY. JOLO B) REPAIR OF DAY CARE CENTERS IN STA. CRUZ, MARINDUQUE, BRGY. IPIL C) RPAIR OF DAY CARE CENTERS IN STA. CRUZ, MARINDUQUE, BRGY. KAMANDUGAN D)REPAIR OF DAY CARE CENTERS IN STA. C18EA0209 · ₱1,047,428.28 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
