OCP CONST is listed as a company organization in Philippine public procurement records on this site, with 196 linked DPWH project(s) totaling about ₱1,502,965,445.91. Recorded delivery grade B (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
OCP CONST
BRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 196
- Total value
- ₱1,502,965,445.91
- Published flags
- 1
- Region
- Cagayan 2nd DEO · Region II
Public Record Grade
A transparent, data-derived summary of reported public records for OCP CONST — not an accusation or finding of wrongdoing.
Score: 89.40 / 100 · Projects in sample: 196 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 79.7/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 79.7
- lateCompletedProjects
- 58
- onTimeCompletedProjects
- 132
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 196
- pastTargetOngoingProjects
- 6
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 196
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 196
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.8/100 · Weight: 11%
- projects
- 196
- componentScore
- 99.8
- flagsPerProject
- 0.01
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 196
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
50 geotagged project(s) — Open full map
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CLAVERIA DIVERSION ROAD, CAGAYAN24BC0011 · ₱60,120,876.78 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SANCHEZ MIRA RIVER BASIN18BC0008 · ₱55,031,689.76 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CLAVERIA DIVERSION ROAD, CAGAYAN22BC0015 · ₱48,867,550.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CLAVERIA DIVERSION ROAD, CAGAYAN25BC0004 · ₱48,484,687.39 · mapped
- Construction of Sanchez Mira Flood Control Structure along Sanchez Mira River, Sanchez Mira, Cagayan24BC0084 · ₱48,248,286.07 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CLAVERIA DIVERSION ROAD, CAGAYAN23BC0007 · ₱48,029,400.00 · mapped
- MFO-1 NATIONAL ROAD NETWORK SERVICES-NETWORK DEVELOPMENT-CONSTRUCTION OF BY PASSES/DIVERSIONS, INCLUDING ROW- SANCHEZ MIRA BYPASS ROAD17BC0025 · ₱47,161,119.09 · mapped
- Construction of Malinta Flood Control Structure along Zinundungan River, Malinta, Lasam, Cagayan22BC0083 · ₱43,120,000.00 · mapped
- CONSTRUCTION OF 3-UNITS 2-STOREY 10 CLASSROOM SANCHEZ MIRA SCHOOL OF ARTS AND TRADE, SANCHEZ MIRA, CAGAYAN16BC0046 · ₱39,649,493.53 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES AND ECONOMIC ZONES-CENTRO 2 NAGBARANGANAN-CAGAYAN STATE UNIVERISTY ROAD CONNECTING TO CACAO PLANTATION AREA IN SUPPORT OF CACAO INDUSTRY, CENTRO 2 SANCHEZ MIRA, CAGAYAN18BC0045 · ₱39,200,000.00 · mapped
- CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT) - DUNGUN BARANGAY ROAD TO MANILA NORTH ROAD CONNECTING TO AGRI-BUSINESS INDUSTRY (NIPA AND CORN), STA. CRUZ, PAMPLONA, CAGAYAN21BC0031 · ₱33,613,873.47 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TRIP)-ABULUG-BALLESTEROS BAY VIEW BOULEVARD INCLUDING ACCESS ROAD LEADING TO BEACH RESORTS, BALLESTEROS, CAGAYAN21BC0072 · ₱29,400,000.00 · mapped
- ROAD WIDENING-PRIMARY ROADS MANILA NORTH ROAD K0653+393-K0654+322, PAMPLONA, CAGAYAN20BC0010 · ₱29,399,977.30 · mapped
- CONSTRUCTION OF 2-STOREY 8-LABORATORY AT PAMPLONA NATIONAL SCHOOL OF FISHERIES, PAMPLONA, CAGAYAN18BC0191 · ₱20,499,706.45 · mapped
- CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-SANCHEZ MIRA BAY VIEW BOULEVARD INCLUDING ACCESS ROAD LEADING TO BEACH RESORT, SANCHEZ MIRA, CAGAYAN22BC0131 · ₱19,600,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONIMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) CENTRO 2 - NAGBARANGANAN - CAGAYAN STAT24BC0031 · ₱19,325,042.53 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVER CONTROL ALONG LANGGANGAN RIVER, STA. PRAXEDES, CAGAYAN20BC0021 · ₱18,796,400.00 · mapped
- CONSTRUCTION OF 2-STOREY 6-LABORATORY AT DAVID M. PUZON MNHS, CURVA, PAMPLONA, CAGAYAN18BC0190 · ₱16,860,882.89 · mapped
- NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS - TERTIARY ROADS-JCT. LOGAC-LASAM-GAGABUTAN ROAD (S00654LZ), K0742+188-K0742+904, K0743+857-K0744+000, LASAM, CAGAYAN19BC0127 · ₱16,756,676.48 · mapped
- CONSTRUCTION OF 2 STOREY 6 CLASSROOM, PIAT NATIONAL SCHOOL, PIAT CAGAYAN20BC0182 · ₱16,582,001.77 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS-MANILA NORTH RD-K0602+340-K0602+410, CLAVERIA, CAGAYAN21BC0077 · ₱14,700,000.00 · mapped
- Construction of River Control Structure along Sanjera Baliw, Sta. Praxedes, Cagayan23BC0056 · ₱14,700,000.00 · mapped
- Construction of River Control Structure along Sitio Surngot, Barangay Portabaga, Sta. Praxedes, Cagayan23BC0057 · ₱14,700,000.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-ACCESS ROAD LEADING TO SICALAO FALLS, LASAM, CAGAYAN20BC0038 · ₱14,700,000.00 · mapped
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-CONCRETING BARANGAY LIBERTAD ROAD, ABULUG, CAGAYAN20BC0145 · ₱14,699,999.38 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-JCT. MANILA NORTH ROAD LEADING TO COFFEE PLANTATION, LABLABIG, CLAVERIA, CAGAYAN20BC0077 · ₱14,639,471.47 · mapped
- Construction of Slope Protection at the NHA-Pag-Asa Village, Barangay Centro 02, Santa Praxedes, Cagayan23BC0100 · ₱14,542,977.58 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DARINAGE SYSTEMS - CONSTRUCTION OF PROTECTION WORKS, BANGAN-DAGUERAY IRRIGATION SYSTEM, SANC25BC0021 · ₱14,523,742.35 · mapped
- CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) -ACCESS ROAD ALONG MINANGA NAMUAC ROAD LEADING TO ESTUARY SAND DUNES AND BEACHES, SANCHEZ MIRA CAGAYAN25BC0028 · ₱13,579,669.99 · mapped
- CONSTRUCTION OF 2-STOREY 4-LABORATORY (S, ICT) AT DAVID M. PUZON MNHS, CURVA, PAMPLONA, CAGAYAN18BC0186 · ₱13,301,924.42 · mapped
- CONSTRUCTION OF 2-STOREY 4-LABORATORY (S, ICT) AT PAMPLONA NATIONAL SCHOOL OF FISHERIES, PAMPLONA, CAGAYAN18BC0187 · ₱13,301,924.42 · mapped
- CONSTRUCTION OF 2-STOREY 4-LABORATORY (SCI LAB, ICT) AT BIDDUANG NHS, PAMPLONA, CAGAYAN18BC0149 · ₱13,265,329.24 · mapped
- CONSTRUCTION OF 2-STOREY 4-LABORATORY (SCI LAB, ICT) AT STA. PRAXEDES HIGH SCHOOL, STA. PRAXEDES, CAGAYAN18BC0153 · ₱13,265,329.24 · mapped
- CONCRETING OF BRGY. MANAOAG TO BRGY. CAMPO FMR, BRGY. MANAOAG AND BRGY. CAMPO, IGUIG, CAGAYAN20BD0134 · ₱12,187,021.60 · mapped
- CONCRETING OF BRGY. LUZON FMR, BRGY. LUZON, CLAVERIA, CAGAYAN23BC0134 · ₱11,940,000.00 · mapped
- LOCAL INFRASTRUCTURE PROGRAM-BUILDINGS AND OTHER STRUCTURES- MULTI-PURPOSE/ FACILITIES: CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ABANGKERUAN, PAMPLONA, CAGAYAN21BC0143 · ₱9,900,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-REHABILITATION OF SANCHEZ MIRA MULTI-PURPOSE BUILDING (MUNICIPAL HALL), SANCHEZ MIRA, CAGAYAN24BC0088 · ₱9,900,000.00 · mapped
- LOCAL INFRASTRUCTURE PROGRAM: LOCAL ROADS AND BRIDGES-CONSTRUCTION OF BRGY. ROAD, BRGY. KITTAG, SANCHEZ MIRA, CAGAYAN19BC0319 · ₱9,900,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF TUPANNA BRIDGE, PAMPLONA, CAGAYAN22BC0090 · ₱9,900,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - JCT. MANILA NORTH ROAD TO PINEAPPLE AND SARAKAT PLANTATION AT SALONGSONG, STA. PRAXEDES, CAGAYAN19BC0071 · ₱9,800,000.00 · mapped
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-CULAO-D LEAÑO ROAD CONNECTING MANILA NORTH ROAD TO COCONUT PLANTATION, DRAGON FRUIT PLANTATION AND PROCESSING, CULAO AND D. LEAÑO, CLAVERIA, CAGAYAN20BC0074 · ₱9,800,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-JCT. MANILA NORTH ROAD LEADING TO COFFEE PLANTATION, LABLABIG, CLAVERIA, CAGAYAN19BC0069 · ₱9,800,000.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-JCT. MANILA NORTH ROAD TO CACAO, COFFEE AND SARAKAT PLANTATION, CAPACUAN, STA. PRAXEDES, CAGAYAN20BC0089 · ₱9,800,000.00 · mapped
- CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) -ACCESS ROAD LEADING TO NAMILAGAN CAVE, NAMUAC, SANCHEZ MIRA, CAGAYAN25BC0031 · ₱9,700,292.88 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) MANILA NORTH ROAD TO CALLUNGAN-MASISIT25BC0044 · ₱9,686,885.43 · mapped
- CSSP-CONST./IMPVT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-BUNNONG BRGY. ROAD LEADING TO MANILA NORTH ROAD IN SUPPORT OF AGRI BUSINESS (CITRUS, DRAGON FRUITS AND VEGETABLES PLANTATION), BUNNONG, GUIDDAM, ABULUG, CAGAYAN19BC0177 · ₱9,648,347.30 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONIMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - MANILA NORTH ROAD TO LANGAGAN-SANTOR24BC0038 · ₱9,647,122.02 · mapped
- CSSP-CONST./IMPVT. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-JCT. BANGAG-MAGAPIT ROAD LEADING TO CCO JAM, BANANA CHIPS, VINEGAR, AND BUKO PIE PROCESSING AT BRGY. LABBEN, BESSANG, CAPAGARAN, MAPURAO, NAGATTATAN & UTAN, ALLACAPAN, CAG19BC0166 · ₱9,622,574.23 · mapped
- CSSP-CONST./IMPVT. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-PACAC-BINUBONGAN CONNECTING TO COCONUT FOOD PROCESSING AREA, ALLACAPAN, CAGYAN19BC0017 · ₱9,609,505.01 · mapped
- CSSP-CONST/IMPVT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-ACCESS ROAD LEADING TO MINGAY BEACH RESORT, BRGY. SAN JUAN, STA. PRAXEDES, CAGAYAN19BC0042 · ₱9,570,848.19 · mapped
