ALBERTO UY CONST & DEVELOPMENT is listed as a company organization in Philippine public procurement records on this site, with 14 linked DPWH project(s) totaling about ₱733,679,605.75. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
ALBERTO UY CONST & DEVELOPMENT
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 14
- Total value
- ₱733,679,605.75
- Published flags
- 0
- Region
- Southern Mindoro DEO · Region IV-B
Online presence
Google Maps: Alberto Uy Construction & DevelopmentGoogle Maps, 2026-10-22
Bongabong, Oriental Mindoro, Philippines
Licensed officers (PCAB)
- Alberto L. Uy · Authorized Managing Officer (PCAB license 20924) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for ALBERTO UY CONST & DEVELOPMENT — not an accusation or finding of wrongdoing.
Score: 87.50 / 100 · Projects in sample: 14 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 100/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 100
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 14
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 14
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 14
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 14
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 14
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 14
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
11 geotagged projects — Open full map · Download projects (CSV)
- ROAD WIDENING OF SECONDARY ROADS, CSR (K0096+1014 - K0098+150, K0098+166 - K0100+309), BANSUD - BONGABONG, ORIENTAL MINDORO18EI0096 · ₱93,561,626.17 · mapped
- OFF - CARRIAGEWAY IMPROVEMENT OF SECONDARY ROADS, BONGABONG - SAGANA - ROXAS - SAN AQUILINO ROAD, K0105+767 - K0106+345 & K0106+368 - K0110+734, BONGABONG, ORIENTAL MINDORO18EI0057 · ₱92,312,983.25 · mapped
- UPGRADING/CONC. OF SAN ROQUE LIBTONG-DANGKALAN RD. LEADING TO BUYAYAO IS. & VARIOUS BEACHES, STA.0+016E00035 · ₱68,982,660.36
- Construction of Bansud River Control, Sta. 6+909 - Sta. 7+340 (Upstream - Right Side), Barangay Conrazon, Bansud, Oriental Mindoro24EI0019 · ₱67,547,177.24 · mapped
- OFF - CARRIAGEWAY/IMPROVEMENT INCLUDING DRAINAGE ALONG BSRSR (K0127+750 - K0129+800, K0130+020 - K0131+363), ROXAS , ORIENTAL MINDORO17EI0036 · ₱57,824,962.39 · mapped
- Construction of Flood Mitigating Structure along Mag-Asawang Tubig River, Sta. 0+000 - Sta. 0+242 U/S, Sta. 0+000 - Sta. 0+123 D/S, San Andres Putik, Naujan, Oriental Mindoro22ED0011 · ₱48,999,957.50 · mapped
- Construction of Malitbog River Control Structure (Downstream), Bongabong, Oriental Mindoro22EI0088 · ₱48,999,912.40 · mapped
- Construction of Baroc River Control, Brgy. San Miguel Section, Sta. 0+000 - Sta. 0+802, Roxas, Oriental Mindoro22EI0005 · ₱48,999,910.68 · mapped
- Construction of Pula River Control Structure, Barangay Santa Maria Section, Pinamalayan, Oriental Mindoro23EI0008 · ₱48,997,251.20 · mapped
- Construction of Baroc River Control, Villa Celestial Section, Sta. 0+000 - Sta. 0+680, Mansalay, Oriental Mindoro22EI0116 · ₱47,597,494.09 · mapped
- CONST./REHAB. OF FLOOD CONTROL STRUCTURES, ORCONUMA RIVER CONTROL, BONGABONG, OR. MINDORO16EI0005 · ₱45,786,295.47
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - BRIDGES FROM THE NATIONAL ROADS, CONSTRUCTION OF BRIDGE, BARANGAY SABANG, PINAMALAYAN, ORIENTAL MINDORO22EI0057 · ₱27,514,299.83 · mapped
- CONST./IMPRV'T. OF ACCESS ROADS LEADING TO DECLARED TOURIST DESTINATION: SAN ROQUE - LIBTONG DANGKALAN ROAD LEADING TO BUYAYAO ISLAND & VARIOUS BEACHES, INCLUDING BRIDGE, BULALACAO, ORIENTAL MINDORO17EI0038 · ₱21,022,147.03
- WIDENING OF PERMANENT BRIDGE: TIGUISAN BR. (B00049MR) ALONG CALAPAN SOUTH ROAD, BANSUD, ORIENTAL MINDORO21EI0069 · ₱15,532,928.14 · mapped
Equipment & capacity
PCAB license
- License no.
- 20924
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Apr 16, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 20924); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
10 evaluations listed across 6 GPPB CPES releases; average final rating 93.5% over 6 rated projects; 10 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| May 5, 2025 | DPWH | ₱139,926.00 | Completed | 99.1% | 92.9% | 40th, p. 21 |
| Feb 14, 2025 | DPWH | ₱67,547,177.00 | Completed | 100.0% | 96.8% | 39th (rev), p. 18 |
| Oct 19, 2024 | DPWH | ₱4,947,322.00 | Completed | 95.5% | 95.5% | 39th (rev), p. 18 |
| Oct 18, 2024 | DPWH | ₱29,397,460.00 | On-going | 88.8% | — | 39th (rev), p. 133 |
| Oct 6, 2024 | DPWH (JV) | ₱67,547,132.00 | Completed | 93.2% | 93.2% | 39th (rev), p. 31 |
| Aug 15, 2024 | DPWH | ₱67,547,177.00 | On-going | 94.8% | — | 38th, p. 16 |
| May 22, 2024 | DPWH (JV) | ₱67,547,132.00 | On-going | 96.7% | — | 38th, p. 35 |
| May 24, 2023 | DPWH | ₱48,999,912.00 | Final | 90.5% | 87.9% | 36th, p. 15 |
| Mar 22, 2023 | DPWH | ₱48,999,911.00 | Completed | 99.5% | 94.6% | 35th, p. 11 |
| Jul 3, 2022 | DPWH | ₱48,999,912.00 | On-going | 86.1% | — | 34th, p. 6 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →