TWO-BROTHERS CONST is listed as a company organization in Philippine public procurement records on this site, with 75 linked DPWH project(s) totaling about ₱604,954,743.46. Recorded delivery grade A (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
TWO-BROTHERS CONST
ARegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 75
- Total value
- ₱604,954,743.46
- Published flags
- 0
- Region
- Eastern Samar DEO · Region VIII
Licensed officers (PCAB)
- Bradly B. Bertos · Authorized Managing Officer (PCAB license 45485) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for TWO-BROTHERS CONST — not an accusation or finding of wrongdoing.
Score: 90.10 / 100 · Projects in sample: 75 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 87.1/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 87.1
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 60
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 66
- pastTargetOngoingProjects
- 4
- undatedCompletedProjectsExcluded
- 8
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 75
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 75
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 75
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 75
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 49 of 74 geotagged projects (largest by contract value) — Open full map
- PREVENTIVE MAINTENANCE SECONDARY ROADS, JCT. TAFT -ORAS - SAN POLICARPO - ARTECHE ROAD, K0929+000 - K0931+544, SAN POLICARPO, EASTERN SAMAR22IB0003 · ₱28,793,375.46 · mapped
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINANGE ALONG NATIONAL ROADS - SECONDARY ROADS, JCT TAFT-ORAS-SN POLICARPO-ARTECHE RD - K0901+040, K0926+810 - K0927+064, K0929+669 - K0932+111, K0944+864 - K0944+1034, K0958+959 -K0959+32523IB0021 · ₱25,479,584.02 · mapped
- CONSTRUCTION OF ROAD, BARANGAY BATIAWAN TO BARANGAY PANGABUTAN, TAFT, EASTERN SAMAR24IB0058 · ₱24,124,975.28 · mapped
- REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES TAFT BR. (B00457SM), ALONG WRIGHT- TAFT - BORONGAN ROAD23IB0003 · ₱24,009,994.31 · mapped
- REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGE ORAS BR. (B00522SM), ALONG JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD, EASTERN SAMAR22IB0080 · ₱19,599,491.26 · mapped
- REPLACEMENT OF STA. ROSA BR. 2 ALONG BALANGIGA - GUINMAAYUHAN PROVINCIAL ROAD, BALANGIGA, EASTERN SAMAR22IB0096 · ₱19,300,000.00 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS, SECONDARY ROADS, JCT. BUENAVISTA - LAWAAN - MARABUT ROAD, K0991+556 - K0991+674, K0991+683 - K0991+717, K0991+791 - K0992+35423IB0013 · ₱17,639,999.87 · mapped
- CONSTRUCTION OF DRAINAGE ALONG NATIONAL ROADS TERTIARY ROADS, ARTECHE - JIPAPAD - LAS NAVAS - RAWIS RD, K0968+908 - K0969+144.40; K0969+508.60 - K0969+698.20, K0969+724.50 - K0970+16022IB0101 · ₱17,639,995.75 · mapped
- ACCESS ROAD LEADING TO DIVINUBO ISLAND ECO PARK, BORONGAN CITY, EASTERN SAMAR23IB0106 · ₱16,904,985.42 · mapped
- PREVENTIVE MAINTENANCE SECONDARY ROADS, JCT. BUENAVISTA - LAWAAN - MARABUT ROAD, K0982+000 - K0982+178; K0982+194 - K0987+367;K0987+382 - K0989+457; K0989+467.22 - K0991+290, QUINAPONDAN, EASTERN SAMAR22IB0028 · ₱15,876,000.00 · mapped
- OPENING/CONCRETING OF SITIO CASAPA, BRGY. 4 - BRGY. MABUHAY - BRGY. AGSAMAN FMR (PHASE II), JIPAPAD, EASTERN SAMAR23IB0094 · ₱14,924,976.23 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY 04, DOLORES , EASTERN SAMAR24IB0121 · ₱14,849,999.31 · mapped
- CONSTRUCTION OF UNIVERSITY BUILDING, EASTERN SAMAR STATE UNIVERSITY, MUNICIPALITY OF GUIUAN, EASTERN SAMAR24IB0112 · ₱14,768,760.73 · mapped
- CONSTRUCTION OF DRAINAGE CANAL SYSTEM, BARANGAY GAYAM, MUNICIPALITY OF TAFT, EASTERN SAMAR24IB0065 · ₱14,623,955.83 · mapped
- CONSTRUCTION OF ROAD, BARANGAY 8 TO SAN ISIDRO, LAWAAN, EASTERN SAMAR24IB0064 · ₱14,405,473.29 · mapped
- MODIFIED STANDARD DPWH-DEPED TWO-STOREY WORKSHOP BUILDING, NENA NATIONAL HIGH SCHOOL, SAN JULIAN, EASTERN SAMAR20IB0093 · ₱13,133,999.10 · mapped
- CONCRETING OF BRGY. POLANGI TO BRGY. GAYAM, PHASE II FMR, BRGY. POLANGI, TAFT, EASTERN SAMAR20IB0145 · ₱11,939,972.57 · mapped
- CONCRETING OF BRGY. BONGHON - BRGY. STO. NIÑO FMR PHASE II, BRGY. BONGHON AND BRGY. STO. NIÑO, DOLORES, EASTERN SAMAR22IB0113 · ₱11,939,969.12 · mapped
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS (SECONDARY ROADS) JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD, K0950+894 - K0950+975, K0955+684 - K0955+831, K0967+749 - K0967+971, K0969+109 - K0969+623, ARTECHE, EASTERN SAMAR21IB0025 · ₱11,336,638.82 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, PEDRO CANDIDO MEMORIAL NATIONAL HIGH SCHOOL (PECMNHS), BRGY. NAGAJA, HERNANI, EASTERN SAMAR23IB0088 · ₱9,899,998.36 · mapped
- EXTENSION/RENOVATION/CONSTRUCTION OF EASTERN SAMAR STATE UNIVERSITY MAIN, BORONGAN, EASTERN SAMAR20IB0127 · ₱9,899,978.72 · mapped
- ROAD CONCRETING OF BRGY. SAPAO, BRGY. DUMROG, GUIUAN, EASTERN SAMAR20IB0107 · ₱9,898,618.77 · mapped
- CONCRETING OF LOCAL ROAD, BARANGAY STA. MARGARITA, QUINAPONDAN, EASTERN SAMAR21IB0008 · ₱9,891,644.50 · mapped
- CONSTRUCTION OF ROAD FROM BARANGAY SAN PEDRO TO BARANGAY MABINI, QUINAPONDAN, EASTERN SAMAR22IB0079 · ₱9,799,997.91 · mapped
- CONSTRUCTION OF ROAD, CASOROY - LAYOG, SAN JULIAN, EASTERN SAMAR23IB0102 · ₱9,799,969.77 · mapped
- CONCRETING OF BRGY. DALID TO BRGY. BAGACAY FMR, BRGY. DALID AND BRGY. BAGACAY, ORAS, EASTERN SAMAR20IB0153 · ₱9,778,641.42 · mapped
- CONSTRUCTION OF ROAD, PALACTAD TO BARANGAY STA. MARGARITA, QUINAPONDAN, EASTERN SAMAR24IB0069 · ₱9,607,871.77 · mapped
- RESTORATION OF DAMAGES ALONG NATIONAL ROADS, (WRIGHT - TAFT-BORONGAN ROAD S00172SM; JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD, S00167SM; ARTECHE-JIPAPAD-LAS NAVAS - RAWIS ROAD, S00137SM, S00174SM, S00189SM20IB0149 · ₱9,557,179.40 · mapped
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS, ARTECHE - JIPAPAD - LAS NAVAS - RAWIS ROAD (S00174SM) CHAINAGE 1477 - CHAINAGE 157722IB0009 · ₱9,309,997.43 · mapped
- REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES PAGBABANGNAN BR. (B00471SM), ALONG WRIGHT - TAFT - BORONGAN ROAD23IB0010 · ₱8,203,823.15 · mapped
- CONSTRUCTION OF MULTI-PURPOSE FACILITY (SLAUGHTER HOUSE) INCLUDING ACCESS ROAD, SULAT, EASTERN SAMAR23IB0109 · ₱7,919,997.13 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO BACAYAWAN BEACH, LLORENTE, EASTERN SAMAR21IB0007 · ₱7,349,996.32 · mapped
- CONSTRUCTION OF DRAINAGE ALONG NATIONA ROADS, (SECONDARY ROADS), WRIGHT - TAFT - BORONGAN ROAD, K0882+700 - K0882+920; K0885+226 - K0885+424; K0888+900 - K0889+100; K0889+600 - K0889+690, TAFT, EASTERN SAMAR22IB0002 · ₱6,123,037.39 · mapped
- CONCRETING OF BRGY. BATO, ARTECHE - BRGY. CAGPILE, ORAS, FMR19IB0234 · ₱5,969,993.59 · mapped
- MODIFIED STANDARD DPWH-DEPED ONE-STOREY TWO CLASSROOM SCHOOL BUILDING, BINALAYAN ELEMENTARY SCHOOL, ORAS, EASTERN SAMAR20IB0098 · ₱5,141,000.00 · mapped
- CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, GIPORLOS CENTRAL ELEMENTARY SCHOOL, BARANGAY 08, GIPORLOS, EASTERN SAMAR24IB0089 · ₱4,956,092.13 · mapped
- CONCRETING OF ROAD FROM BRGY. ROXAS TO BRGY. TANDANG SORA, GENERAL MACARTHUR, EASTERN SAMAR19IB0147 · ₱4,949,999.14 · mapped
- CONSTRUCTION OF ROAD, BARANGAY KABAYANGAN TO BARANGAY CONCEPCION, ARTECHE, EASTERN SAMAR22IB0083 · ₱4,949,997.75 · mapped
- CONSTRUCTION OF LOCAL BRIDGE, ORAS NATIONAL AGRO INDUSTRIAL SCHOOL, BRGY. CADIAN, ORAS, EASTERN SAMAR20IB0090 · ₱4,949,988.58 · mapped
- CONCRETING OF LOCAL ROADS, BARANGAY CAMANTANG, CAN-AVID, EASTERN SAMAR21IB0019 · ₱4,949,772.68 · mapped
- CONSTRUCTION OF 1-STOREY, 2-CLASSROOM SCHOOL BUILDING, HILABAAN NATIONAL HIGH SCHOOL, BARANGAY HILABAAN, DOLORES, EASTERN SAMAR24IB0103 · ₱4,941,978.44 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SENIOR CITIZEN BUILDING, BARANGAY SABANG NORTH, BORONGAN CITY, EASTERN SAMAR25IB0031 · ₱4,932,007.36 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING ARTECHE CAMPUS OF EASTERN SAMAR STATE UNIVERSITY, EASTERN SAMAR24IB0097 · ₱4,931,180.34 · mapped
- CONSTRUCTION OF REVETMENT ALONG BERI RIVERSIDE, BARANGAY. 8, LAWAAN, EASTERN SAMAR25IB0175 · ₱4,923,993.67
- MODIFIED STANDARD DPWH-DEPED ONE-STOREY TWO CLASSROOM SCHOOL BUILDING, DEL PILAR ELEMENTARY SCHOOL, DOLORES, EASTERN SAMAR19IB0160 · ₱4,901,939.99 · mapped
- REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES BAYO BR. (B00578SM), ALONG WRIGHT - TAFT - BORONGAN ROAD23IB0054 · ₱4,899,999.34 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO CAINTA, BARANGAY BALACDAS, BORONGAN CITY, EASTERN SAMAR25IB0045 · ₱4,887,942.34 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY GAMOT, ORAS, EASTERN SAMAR25IB0051 · ₱4,877,840.69 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY JAPUNAN, SAN POLICARPO, EASTERN SAMAR25IB0095 · ₱4,872,774.86 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SABANG SOUTH, BORONGAN CITY, EASTERN SAMAR25IB0087 · ₱4,871,516.00 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
