SAN NARCISO BUILDERS CORP FOR SAN NARCISO is listed as a company organization in Philippine public procurement records on this site, with 56 linked DPWH project(s) totaling about ₱353,576,574.02. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
SAN NARCISO BUILDERS CORP FOR SAN NARCISO
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 56
- Total value
- ₱353,576,574.02
- Published flags
- 0
- Region
- Cebu 4th DEO · Region VII
Public Record Grade
A transparent, data-derived summary of reported public records for SAN NARCISO BUILDERS CORP FOR SAN NARCISO — not an accusation or finding of wrongdoing.
Score: 85.60 / 100 · Projects in sample: 56 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 78.3/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 78.3
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 46
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 54
- pastTargetOngoingProjects
- 6
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 56
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 56
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 56
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 56
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 40 of 43 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF 3 STOREY 12 CLASSROOM SCHOOL BUILDING OF HAGNAYA IS, HAGNAYA, SAN REMEGIO, CEBU22HD0069 · ₱32,106,089.00 · mapped
- CONSTRUCTION OF 4 STOREY 20 CLASSROOM SCHOOL BUILDING AT RAMON DURANO SR. FOUNDATION - SCIENCE & TECHNOLOGY CENTER, DANAO CITY, CEBU16HI0030 · ₱27,582,000.00
- CONCRETING OF BRGY. TABOC TO BRGY. GUINACOT FMR, BRGY. TABOC AND BRGY. GUINACOT, DANAO CITY, CEBU23HI0113 · ₱24,844,788.75 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT BARANGAY KAWIT, MEDELLIN, CEBU19HD0026 · ₱19,600,000.00 · mapped
- CONSTRUCTION OF FOUR-STOREY (8 CLASSROOM) SCHOOL BUILDING, CALAPE NATIONAL HIGH SCHOOL, DAANBANTAYAN, CEBU18HD0165 · ₱17,214,357.63 · mapped
- CONCRETING OF BRGY. PATAO FMR, BRGY. PATAO, BANTAYAN, CEBU23HD0073 · ₱14,925,000.00 · mapped
- CONCRETING OF SITIO COLONIA, BRGY. ILIHAN FMR, BRGY. ILIHAN, TABOGON, CEBU25HG0073 · ₱14,513,070.00 · mapped
- CONSTRUCTION OF A MULTI-PURPOSE BUILDING (BOGO AUDITORIUM, BUILDING, PHASE 2) BOGO CITY, CEBU18HD0116 · ₱14,107,412.53 · mapped
- CONSTRUCTION OF 2-STOREY, 4-CLASSROOM SCHOOL BUILDING IN DAANTABOGON NATIONAL HIGH SCHOOL, TABOGON, CEBU24HD0119 · ₱9,925,961.51 · mapped
- REPAIR/MAINTENANCE INCLUDING ROAD SLIPS, CEBU NORTH HAGNAYA WHARF ROAD, SITIO ANAPOG, BARANGAY TINUBDAN, DAANBANTAYAN, CEBU20HD0103 · ₱9,900,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY KAMPINGGANON, BANTAYAN, CEBU24HD0044 · ₱9,900,000.00 · mapped
- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF LUMBANG ROAD, BARANGAY OBO-OB, BANTAYAN, CEBU24HD0102 · ₱9,900,000.00 · mapped
- CONCRETING OF ROAD, BARANGAY MANAGASE, TABOGON, CEBU21HD0039 · ₱9,896,040.00 · mapped
- CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MAGTAGOBTOB, DANAO CITY, CEBU25HI0058 · ₱9,699,100.00 · mapped
- COCRETING OF BRGY. MARICABAN FMR, BRGY. MARICABAN, STA. FE, CEBU25HG0077 · ₱9,675,380.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY CORAZON, BARANGAY SAN JOSE AND BARANGAY GINABUKAN, CATMON, CEBU22HI0028 · ₱6,900,000.12 · mapped
- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY DAANLUNGSOD, MEDELLIN, CEBU24HD0028 · ₱5,940,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MANAGASE, TABOGON, CEBU23HD0018 · ₱4,950,000.00 · mapped
- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - CONSTRUCTION OF ROAD, BARANGAY DON VIRGILIO GONZALES, MEDELLIN, CEBU22HD0023 · ₱4,950,000.00 · mapped
- CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LUPA, COMPOSTELA, CEBU25HI0045 · ₱4,939,903.64 · mapped
- SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PANAS, CONSOLACION, CEBU25HN0037 · ₱4,930,000.00 · mapped
- SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY NANGKA, CONSOLACION, CEBU25HN0042 · ₱4,930,000.00 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY TABA-AO, TABOGON, CEBU25HG0066 · ₱4,928,450.57 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO GUSO PUROK 2, BARANGAY TABA-AO, TABOGON, CEBU25HG0020 · ₱4,926,583.19 · mapped
- BIP - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY SILLON, BANTAYAN, CEBU25HG0040 · ₱4,900,474.82 · mapped
- CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAY CARE CENTER), PUROK 5B, BARANGAY CANSAGA, CONSOLACION, CEBU24HN0235 · ₱4,899,333.21 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY TABA-AO, TABOGON, CEBU23HD0036 · ₱2,970,000.00 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY SAN VICENTE, TABOGON, CEBU22HD0011 · ₱2,970,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY TABA-AO, TABOGON, CEBU20HD0017 · ₱2,970,000.00 · mapped
- CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING, TABLA, LILOAN, CEBU23HI0024 · ₱2,965,000.00 · mapped
- CONSTRUCTION/REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING (TYPE A) BARANGAY TABA-AO, TABOGON, CEBU18HD0121 · ₱2,820,000.00 · mapped
- CONSTRUCITON OF MULTI-PURPOSE BUILDING, BARANGAY SAN VICENTE, TABOGON, CEBU20HD0075 · ₱2,816,539.34 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY VILLAHERMOSA, TABUELAN, CEBU19HD0070 · ₱2,792,730.35 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY SAN JOSE, CATMON, CEBU23HI0040 · ₱2,470,000.00 · mapped
- CLUSTER P - CONSTRUCTION/IMPROVEMENT OF MULTI-PURPOSE BUILDING OF VARIOUS BARANGAYS IN NAGA CITY, CEBU: 1) JAGUIMIT, NAGA CITY, CEBU; 2) PATAG, NAGA CITY, CEBU; 3) CABUNGAHAN, NAGA CITY, CEBU; 4) MAYANA, NAGA CITY, CEBU; 5) ULING, NAGA CITY, CEBU15HE0156 · ₱2,455,200.00
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. PANGPANG, BARILI, CEBU15HF0133 · ₱2,449,202.58
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN ISIDRO, PILAR, CEBU19HI0024 · ₱2,425,200.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO CENTRO, BRGY. KAWIT, PILAR, CEBU19HI0042 · ₱2,425,200.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO PANGAGAN, BRGY. KAWIT, PILAR, CEBU19HI0041 · ₱2,425,100.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY POBLACION, SOGOD, CEBU19HI0083 · ₱2,400,750.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. LUPA, COMPOSTELA, CEBU16HI0022 · ₱2,400,341.33
- REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY SALAG, TABOGON, CEBU21HD0010 · ₱1,980,000.00 · mapped
- CONCRETING OF ROADS AT BRGY. MULAO, LILOAN, CEBU15HI0107 · ₱1,970,511.85
- CONCRETING OF ROADS AT BRGY. TABLA, LILOAN, CEBU15HI0108 · ₱1,970,511.85
- CONCRETING OF ROAD LOWER POBLACION, PILAR, CEBU15HI0113 · ₱1,969,496.49
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY GINABUCAN, CATMON, CEBU24HI0023 · ₱1,969,000.00 · mapped
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING IN BARANGAY TABLA (PROPER), LILOAN, CEBU21HI0113 · ₱1,920,028.42 · mapped
- IMPROVEMENT OF MULTI-PURPOSE BUILDING AT PNP TRAINING CENTER, BRGY. JUGAN,CONSOLACION,CEBU16HN0033 · ₱1,919,897.38
- IMPROVEMENT OF ROAD LEADING TO BUOT CAUSEWAY IN PUNTA ENGAÑO, LAPU-LAPU CITY15HN0148 · ₱1,584,793.28
- CONSTRUCTION/IMPROVEMENT OF MULTI-PURPOSE BUILDING, ANAJAO, ARGAO, CEBU15HG0158 · ₱1,433,030.35
Equipment & capacity
PCAB license
- License no.
- 24527
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Jan 30, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 24527); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
1 evaluation listed across 1 GPPB CPES release; 1 site-visit rating. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 27, 2022 | DPWH (JV) | ₱46,540,559.00 | On-going | 91.1% | — | 34th, p. 45 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →