SDB STEELSTRUCT BUILDERS ENT is listed as a company organization in Philippine public procurement records on this site, with 151 linked DPWH project(s) totaling about ₱1,008,845,857.59. Recorded delivery grade B (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
SDB STEELSTRUCT BUILDERS ENT
BRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 151
- Total value
- ₱1,008,845,857.59
- Published flags
- 0
- Region
- Capiz 2nd DEO · Region VI
Licensed officers (PCAB)
- SAMUEL DEMANO BELUSO · Authorized Managing Officer (PCAB license 21542) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for SDB STEELSTRUCT BUILDERS ENT — not an accusation or finding of wrongdoing.
Score: 86.40 / 100 · Projects in sample: 151 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 77.3/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 77.3
- lateCompletedProjects
- 50
- onTimeCompletedProjects
- 94
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 149
- pastTargetOngoingProjects
- 5
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 98/100 · Weight: 24%
- totalProjects
- 151
- componentScore
- 98
- terminatedProjects
- 1
- terminationRatePct
- 0.7
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 151
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 151
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 151
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 38 of 80 geotagged projects (largest by contract value) — Open full map
- CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BARANGAY POBLACION ILAYA TO BARANGAY DOLORES, DUMALAG, CAPIZ24GP0043 · ₱48,900,032.40 · mapped
- CONSTRUCTION OF CONCRETE BRIDGE, BARANGAY BANGONBANGON, SIGMA, CAPIZ25GP0035 · ₱29,339,167.73 · mapped
- ROAD WIDENING-MAAYON-JCT. BAILAN RD KO124+200 KO125+35123GD0043 · ₱29,215,995.50 · mapped
- CONSTRUCTION OF CONCRETE BRIDGE, SITIO SINANDIGAN, BARANGAY MIANAY, SIGMA, CAPIZ25GP0002 · ₱26,898,788.93 · mapped
- (BEFF-BATCH3) CONSTRUCTION OF ELEM. & SEC. SCHOOL BUILDINGS UNDER THE DEPED'S CY2018 BEFF, VICTORIA C. DAIS ELEM. SCHOOL, PONTEVEDRA, CAPIZ, 2STY10CL18GD0137 · ₱26,675,000.00 · mapped
- (BEFF-BATCH3) CONSTRUCTION OF ELEM. & SEC. SCHOOL BUILDINGS UNDER THE DEPED'S CY2018 BEFF, FLORENTINA B. DEGALA NHS, MAAYON, CAPIZ, 2STY10CL18GD0131 · ₱25,325,000.00 · mapped
- CY 2016 BEFF BATCH 13 CONSTRUCTION OF 1 UNIT, 3 STOREY 15 CLASSROOM SCHOOL BUILDING PONTEVEDRA NHS16GD0108 · ₱24,250,498.88 · mapped
- CY 2016 BEFF BATCH 13 CONSTRUCTION OF 1 UNIT, 4 STOREY 12 CLASSROOM SCHOOL BUILDING CASANAYAN NHS16GD0110 · ₱21,989,482.68
- CONSTRUCTION OF SENIOR HIGH SCHOOL CLASSROOMS IVISAN NHS16GP0033 · ₱21,782,951.36
- CONSTRUCTION OF SENIOR HIGH SCHOOL CLASSROOMS CUARTERO NHS16GP0028 · ₱21,669,789.37
- REHABILITATION OF PAVED ROAD - ILOILO EAST COAST - CAPIZ RD - KO119+413.50 - KO120 + 30024GD0016 · ₱19,598,865.87 · mapped
- CONSTRUCTION OF TWO STOREY (8 CLASSROOMS) SCHOOL BUILDING AT MAINDANG NATIONAL HIGH SCHOOL18GP0092 · ₱18,528,621.73 · mapped
- CONSTRUCTION OF TWO STOREY (8 CLASSROOMS) SCHOOL BUILDING AT MANUEL F. ONATO NHS18GP0098 · ₱18,438,124.72 · mapped
- (BEFF-BATCH3) CONSTRUCTION OF ELEM. & SEC. SCHOOL BUILDINGS UNDER THE DEPED'S CY2018 BEFF, HIPONA ELEM. SCHOOL, PONTVEDRA, CAPIZ, 2STY6CL18GD0140 · ₱16,921,706.48 · mapped
- CONSTRUCTON OF THREE STOREY (6 CLASSROOMS) SCHOOL BUILDING AT MANUEL F. ONATO NHS18GP0099 · ₱14,814,952.05 · mapped
- CONSTRUCTION OF CONCRETE ROAD - ACCESS ROAD LEADING TO NABAYE FALLS, BRGY. DURAN, DUMALAG, CAPIZ19GP0042 · ₱14,698,321.15 · mapped
- CONSTRUCTION OF CONCRETE ROAD - ACCESS ROAD LEADING TO SITIO CABANBANAN, CAPIZ LEADING TO MT. PANGINHIRAON PEAK, BRGY. DOLORES, DUMALAG, CAPIZ19GP0030 · ₱14,254,876.85 · mapped
- WIDENING OF BRIDGE - PAMANTAWAN BR. (B00237PN) ALONG ILOILO - CAPIZ RD (NEW ROUTE)18GP0040 · ₱14,127,913.14 · mapped
- CY2016 BEFF-BATCH 9-CONST. OF 1-UNIT,2-ST,10-CL SB TUBURAN NHS, MAAYON, CAPIZ16GD0044 · ₱14,041,218.56
- CY2016 BEFF-BATCH 9 CONST. OF 1-UNIT,2-ST,10-CL SB SAN NICOLAS NHS, PILAR, CAPIZ16GD0048 · ₱14,032,166.69
- ROAD CONCRETING, BARANGAY AGNAGA, CUARTERO, CAPIZ20GP0064 · ₱13,902,938.63 · mapped
- REPAIR/REHAB/IMPRV ALONG ILOILO EAST COAST CPZ RD KO118+000-KO118+060, KO118+357.84-KO118+1056.0717GD0054 · ₱12,869,830.15 · mapped
- WIDENING OF BRIDGE - SIGMA BR. (B00233PN) ALONG ILOILO-CAPIZ RD (NEW ROUTE) (PHASE II)25GP0028 · ₱11,751,074.74 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURES - AT SPECIFIC LOCATIONS ALONG ILOILO EAST COAST - CAPIZ RD (S00273PN) KO142+000 - KO169+87420GD0014 · ₱11,717,000.00 · mapped
- RECONSTRUCTION TO CONCRETE PAVEMENT - ALONG ILOILO EAST COAST - CAPIZ RD (S00273PN) KO116+400 - KO117+00020GD0018 · ₱11,348,168.00 · mapped
- WIDENING OF BRIDGE - AGBATUAN BR. (B00023PN) ALONG MAMBUSAO - IMBUG RD.18GP0049 · ₱11,108,240.01 · mapped
- CY2016 BEFF-BATCH 9 CONST. OF 1-UNIT,3-ST,6-CL SB LEODEGARIO DEOCAMPO NHS, PANITAN, CAPIZ16GD0046 · ₱10,609,960.19
- CONSTRUCTION OF TWO STOREY (4 CLASSROOMS) SCHOOL BUILDING AT CALIXTO LOYOLA SR. ES (MANSACUL ES)18GP0106 · ₱9,981,486.29 · mapped
- CONCRETING OF BRGY. PARIAN FMR, BRGY. PARIAN, SIGMA, CAPIZ24GP0077 · ₱9,935,781.10 · mapped
- CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF ROAD, BARANGAY VISCAYA, PRESIDENT ROXAS, CAPIZ23GD0003 · ₱9,899,302.80 · mapped
- REHABILITATION OF PAVED ROAD - ILOILO EAST COAST-CAPIZ RD - KO127+837.38 - KO128+30924GD0021 · ₱9,797,973.13 · mapped
- REHABILITATION/MAJOR REPAIR OF BRIDGE - PAMANTAWAN BR. (B00237PN) ALONG ILOILO-CAPIZ RD (NEW ROUTE)22GP0068 · ₱9,781,265.34 · mapped
- CONCRETING OF BRGY. BULA - BALAT-AN FMR, BRGY. BULA AND BRGY. BALAT-AN, MAMBUSAO, CAPIZ18GP0068 · ₱9,747,839.65 · mapped
- CONST. OF ACCESS ROADS, TAPAZ-JAMINDAN-ALTAVAS ROUTE, CAPIZ17GP0034 · ₱9,308,926.37
- CY2016 BEFF BATCH-1 CONST OF I-UNIT 2-ST, 6-CL SCH BLDG DULANGAN NHS, PILAR, CAPIZ16GD0022 · ₱9,108,000.00
- WIDENING OF PUPOS BRIDGE (B00289PN) ALONG AKLAN EAST ROAD INCLUDING ROW, ALTAVAS, AKLAN18GA0070 · ₱9,029,865.73 · mapped
- ROAD WIDENING - ILOILO EAST COAST-CAPIZ ROAD - KO146+781 - KO147+00125GD0052 · ₱8,260,764.55 · mapped
- CY2018 BEFF-BATCH 1, CONST. & COMP. OF SB IN THE ELEM. & SEC. CL, DON YNOCENCIO A. DEL ROSARIO NHS FORMERLY TANQUE NHS-DAYAO EXT., 1STY2CL LAB (1 REGULAR WORKSHOP)18GD0098 · ₱8,098,500.00 · mapped
- CONCRETING OF SUGARCANE FARM-TO-MILL ROAD, SITIO ROSARIO, BRGY. LANTANGAN-BRGY. BANATE, PONTEVEDRA, CAPIZ19GD0100 · ₱7,959,735.36 · mapped
- CY2018 BEFF-BATCH 1, CONST. & COMP. OF SB IN THE ELEM. & SEC. CL, RXS CITY SCH. FOR THE PHIL. CRAFTSMEN, 1STY2CL (2 SCIENCE LAB)18GD0096 · ₱7,923,550.15 · mapped
- CY2018 BEFF-BATCH 1, CONST. & COMP. OF SB IN THE ELEM. & SEC. CL, RXS CITY SCH. FOR THE PHIL. CRAFTSMEN, 1STY1CL (2 ICT LAB)18GD0097 · ₱7,920,000.00 · mapped
- CONST. OF SENIOR HIGH SCHOOL CLASSROOM AT COL. PATROCINIO ARTUZ NATIONAL HIGH SCHOOL (BATCH 3) TAPAZ17GP0006 · ₱7,701,006.20
- CONSTRUCTION OF PONTEVEDRA MUNICIPAL POLICE STATION BUILDING, PONTEVEDRA, CAPIZ20G00031 · ₱7,677,712.61 · mapped
- CONSTRUCTION OF CONCRETE ROAD - DAYAO-LIBAS-CULASI ROAD LEADING TO CULASI PORT, ROXAS CITY, CAPIZ22GD0019 · ₱7,533,843.50 · mapped
- REHAB/RECONST OF NATL RD W/ SLIPS, ETC.-TER RD RXS CITY BDRY-PANITAN-BAILAN RD(KO112+500-KO113+068..16GD0077 · ₱7,027,246.00 · mapped
- RETROFITTING/STRENGTHENING OF GUINHALINAN BRIDGE ALONG AKLAN WEST ROAD, IBAJAY, AKLAN17GA0018 · ₱6,782,767.44 · mapped
- CY2016 BEFF-BATCH 9&10-CONST. OF 1-UNIT,1-ST,2-CL SB, 1-UNIT-TECHVOC LAB, 1-UNIT SHS UNIQUE WORKSHOP16GD0050 · ₱6,723,293.81
- COMP OF MPB, 1)BRGY. SAN JOSE, RC, CPZ, 2)BRGY. BARRA, RC, CPZ, 3)BRGY. PARALLAN, MAAYON, CPZ16GD0092 · ₱6,235,020.00
- RECONSTRUCTION TO CONCRETE PAVEMENT - AT SPECIFIC LOCATIONS ALONG ILOILO EAST COAST - CAPIZ RD (S00273PN) K0116+220 - KO117+09322GD0055 · ₱6,190,821.25 · mapped
- CONST. OF SENIOR HIGH SCHOOL CLASSROOM AT REV. TOMAS CONEJAR NATIONAL HIGH SCHOOL (BATCH 7), TAPAZ,17GP0007 · ₱6,064,768.88
