JANN-NORRIS CONST AND SUPPLIES INC FORMELY: JANN-NORRIS CONST AND SUPPLIES is listed as a company organization in Philippine public procurement records on this site, with 247 linked DPWH project(s) totaling about ₱10,929,158,467.95. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
JANN-NORRIS CONST AND SUPPLIES INC FORMELY: JANN-NORRIS CONST AND SUPPLIES
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 247
- Total value
- ₱10,929,158,467.95
- Published flags
- 0
- Region
- Nueva Vizcaya 2nd DEO · Region II
Public Record Grade
A transparent, data-derived summary of reported public records for JANN-NORRIS CONST AND SUPPLIES INC FORMELY: JANN-NORRIS CONST AND SUPPLIES — not an accusation or finding of wrongdoing.
Score: 86.50 / 100 · Projects in sample: 247 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 76.4/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 76.4
- lateCompletedProjects
- 8
- onTimeCompletedProjects
- 203
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 241
- pastTargetOngoingProjects
- 30
- undatedCompletedProjectsExcluded
- 4
- Termination rate
Component score: 98.8/100 · Weight: 24%
- totalProjects
- 247
- componentScore
- 98.8
- terminatedProjects
- 1
- terminationRatePct
- 0.4
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 246
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 247
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 247
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 49 of 230 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BAYOMBONG-SOLANO BY-PASS ROAD, BAYOMBONG - SOLANO, NUEVA VIZCAYA19B00022 · ₱238,918,923.53 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0292 + 000 - K0293 + 225, K0293 + 356 - K0294 + 100, K0294 + 152 - K24B00057 · ₱196,359,811.43 · mapped
- CAPITAL OUTLAY-NATIONAL BRIDGE CONST'N/REPLACEMENT PROGRAM CONST'N OF MADDIANGAT BRIDGE AND APPROACHES INCLUDING RIGHT-OF-WAY ACQUISITION ALONG BAMBANG KASIBU-QUEZON-SOLANO ROAD, NUEVA VIZCAYA17B00065 · ₱194,800,000.00
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG MANILA NORTH RD, - K0590+(-784) - K0593+608; K0593+637-K0595+000; K06424B00067 · ₱184,317,282.74 · mapped
- OO 1: ENSURE SAFE AND RELIABLE NAT'L ROAD SYSTEM: NETWORK DEV'T PROGRAM: ROAD WIDENING-PRIMARY ROADS ALONG DAANG MAHARLIKA (LZ),K0254+641-K0255+K249.50, K0259+899.20 - K0260+ 051.7 , K0260+072.30 - K0260+225.70, K0261+090 - K0261+242,QUIRINO LONE DISTRICT18B00039 · ₱165,202,904.86 · mapped
- OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEV'T: ROAD WIDENING PRIMARY ROAD ALONG DAANG MAHARLIKA, K0216+886 K0219+092.70 = STA. 216+781-STA. 219+092.70, K0219+224-K0219+899 = STA. 219+138.70-STA. 219+813.70, STA. FE, NUEVA VIZCAYA18B00033 · ₱161,060,537.63 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS ALONG CAGAYAN VALLEY RD - K0514 + 356 - K0514 + 878.300; K0515 + 274 - K05124B00059 · ₱149,981,860.69 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BAMBANG BYPASS ROAD, NUEVA VIZCAYA24B00019 · ₱148,481,748.49 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) - KIANGAN-TINOC-BUGUIAS ROAD CHAINAGE 48348 - CHAINANGE 5209817P00026 · ₱144,749,981.28 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0242 + 150 - K0245 + 970, K0251 + 000 - K0251 + 81224B00035 · ₱144,501,610.96 · mapped
- NETWORK DEVELOPMENT - OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, NUEVA VIZCAYA - IFUGAO - MT. PROVINCE ROAD K0337+006 - K0356+344, K0356+355 - K0359+00017P00043 · ₱137,689,095.00 · mapped
- OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0248 + 000 - K0249 + 000, K0252 + 000 - K0253 + 000, K0253 + 000 - K0224B00064 · ₱137,473,679.30 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BAYOMBONG-SOLANO BY-PASS ROAD, NUEVA VIZCAYA21B00030 · ₱127,099,264.48 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239 - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MANILA NORTH RD - K0654+387.30 - K0655+046, K0655+062 - K25B00015 · ₱125,395,595.38 · mapped
- OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - SAN LORENZO RUIZ BRIDGE (B01235LZ) ALONG DAANG MAHARLIKA (LZ), PHASE I24B00112 · ₱108,356,701.99 · mapped
- MFO 1: NATIONAL ROAD NETWORK SERVICES: NETWORK DEVELOPMENT: IMPROVEMENT/WIDENING OF NATIONAL ROADS-ALONG DAANG MAHRLIKA (LZ), K0256+540-K0259+899.20=STA.256+540-STA.260+ 080, K0260+225.70-K0261+090=STA. 260+400-STA. 261+260, BAYOMBONG, NUEVA VIZCAYA17B00013 · ₱106,924,739.76 · mapped
- RD. UPGRADING(UNPAVED TO PAVED) BASED ON GRAVEL RD. STRATEGIES(HDM-4), BAMBANG-KASIBU-SOLANO RD.(KAS15B00033 · ₱106,154,390.32 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) KIANGAN - TINOC - BUGUIAS ROAD, CHAINAGE 52098 - CHAINAGE 5481417P00016 · ₱104,837,508.64 · mapped
- MFO 1- NATIONAL ROAD NETWORK SERVICES: ASSET PRESERVATION OF NATIONAL ROADS: REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE, BAMBANG, BAYOMBONG AND DIADI, NUEVA VIZCAYA17B00007 · ₱104,558,648.84 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SAN MATEO-ALFONSO LISTADIVERSION ROAD, SAN MATEO SECTION, ISABELA21B00025 · ₱102,626,692.71 · mapped
- ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES: ABIAN BRIDGE (B01226LZ) ALONG DAANG MAHARLIKA (LZ) K0254+517-K0254+641, PROVINCE OF NUEVA VIZCAYA18B00049 · ₱101,893,527.25 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM -ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS NUEVA VIZCAYA - IFUGAO - MT. PROVINCE ROAD, KO291+(-379) - KO291+258, KO291+283 - KO295+679, KO295+701 - KO297+620P00004 · ₱101,474,575.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ALICIA BY-PASS ROAD, ISABELA21B00001 · ₱101,140,980.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BYPASS ROADS AND DIVERSION ROADS-BAMBANG BYPASS ROAD, NUEVA VIZCAYA20B00006 · ₱100,749,586.51 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT - CONSTRUCTION OF BYPASS AND DIVERSION ROADS - SAN MATEO-ALFONSO LISTA DIVERSION ROAD, SAN MATEO SECTION, ISABELA22B00005 · ₱100,009,052.19 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BAMBANG BYPASS ROAD, NUEVA VIZCAYA22B00044 · ₱98,857,241.96 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SAN MATEO-ALFONSO LISTA DIVERSION ROAD, SAN MATEO SECTION, ISABELA24B00040 · ₱98,730,778.83 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF BYPASS AND DIVERSION ROADS - BAMBANG BYPASS ROAD, NUEVA VIZCAYA21B00029 · ₱96,693,316.93 · mapped
- REHABILITATION OF BANK SLOPE PROTECTION ALONG SAN FERNANDO ABIAN RIVER, BAMBANG, NUEVA VIZCAYA24BI0131 · ₱96,500,000.00 · mapped
- CONSTRUCTION AND MAINTENANCE OF BRIDGE ALONG NATIONAL ROADS - REPLACEMENT OF PERMANENT WEAK BRIDGES, IBULAO BRIDGE (BO2203LZ) ALONG NUEVA VIZCAYA-IFUGAO-MT. PROVINCE ROAD17P00053 · ₱96,500,000.00 · mapped
- NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS DAANG MARALIKA (LZ) - K0226+920 - K0229+894.50 ARITAO, NUEVA VIZCAYA20BJ0025 · ₱96,499,334.51 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF BARETBET STA. LUCIA (SITIO DISSU) FL25BI0014 · ₱95,446,415.09 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - BATU BRIDGE (B01227LZ) ALONG DAANG MAHARLIKA (LZ)21B00005 · ₱95,329,876.71 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - INFRASTRUCTURE FLAGSHIP PROJECTS (IFPS) - BATU BRIDGE (B01227LZ) ALONG DAANG MAHARLIKA (LZ)22B00033 · ₱95,059,046.92 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BYPASS AND DIVERSION ROADS, BAMBANG BYPASS ROAD, NUEVA VIZCAYA23B00037 · ₱94,382,967.04 · mapped
- OO 1: ENSURE SAFE AND RELIABLE NAT'L ROAD SYSTEM: NETWORK DEV'T PROGRAM: CONST'N OF MISSING LINKS/NEW ROAD-JCT. ABBAG-GUINGIN BOUNDARY ROAD (GIAYAN-NUEVA VIZCAYA BOUNDARY SECTION), NUEVA VIZCAYA, STA. 0+000-STA. 2+160 (CONCRETING), PROVINCE OF NUEVA VIZCA18B00042 · ₱93,440,626.81 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BAMBANG BY-PASS ROAD, NUEVA VIZCAYA25B00026 · ₱93,333,935.49 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BYPASS AND DIVERSION ROADS: RAMON - CORDON - DIADI BYPASS ROAD, NUEVA VIZCAYA23B00045 · ₱91,160,565.64 · mapped
- RD. UPGRADING(UNPAVED TO PAVED) BASED ON GRAVEL RD. STRATEGIES(HDM-4),BAMBANG-KASIBU-SOLANO-RD.(KASI15B00034 · ₱89,193,425.96 · mapped
- OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - BATU BR. (B01227LZ) ALONG MAHARLIKA HIGHWAY24B00113 · ₱87,106,473.03 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-BAMBANG BY-PASS, NUEVA VIZCAYA, STA. 000+400-STA. 002+326.85 (CONCRETING), STA. 003+093.30-STA. 003+193.30(OPENING)19B00041 · ₱86,982,498.33 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239 - INSTALLATION OF SOLAR-POWERED ROADWAY LIGHTING ALONG MANILA NORTH ROAD - K0590 + (-954) - K0685 + 49524B00085 · ₱86,697,723.77 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BYPASS AND DIVERSION ROAD, BAYOMBONG-QUEZON-BAGABAG ROAD, NUEVA VIZCAYA23B00049 · ₱84,301,666.87 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS NUEVA VIZCAYA-BENGUET ROAD (K0260+675-K0260+805) NUEVA VIZCAYA - BENGUET SECTION, KAYAPA, NUEVA VIZCAYA21BJ0033 · ₱81,368,822.39 · mapped
- LOCAL PROGRAM: CONSTRUCTION / REPAIR/REHABILITATION /IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS: WATER MANAGEMENT FACILITIES: CONSTRUCTION OF WATER SUPPLY, KASIBU, NUEVA VIZCAYA18B00054 · ₱79,175,401.50 · mapped
- ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY - CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - BANAUE - HUNGDUAN - BENGUET BDRY ROAD, K0342+517-K0343+852.50,17P00061 · ₱78,174,650.00 · mapped
- NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (LZ) K0229+994.50 - K0232+105.50 ARITAO, NUEVA VIZCAYA21BJ0011 · ₱73,722,818.03 · mapped
- OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0366 + 337 - K0367 + 431.5024B00075 · ₱73,282,409.81 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R. A. 11239 - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY - K0257 + 000 - K0258 + 10025B00062 · ₱68,738,248.17 · mapped
- 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS-DAANG MAHARLIKA (LZ) K0280+599-K0282+802, BAGABAG, NUEVA VIZCAYA19BI0003 · ₱68,647,205.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 35880
- Category
- AA · Large A
- Minimum net worth for this category
- ₱90,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱450M
- License valid until
- Mar 29, 2028
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 35880); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
16 evaluations listed across 6 GPPB CPES releases; average final rating 92.8% over 6 rated projects; 16 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Feb 14, 2025 | DPWH | ₱58,076,081.00 | On-going | 91.3% | — | 40th, p. 154 |
| Aug 15, 2024 | DPWH | ₱98,730,779.00 | On-going | 96.3% | — | 38th, p. 113 |
| May 22, 2024 | DPWH | ₱148,481,748.00 | On-going | 94.5% | — | 38th, p. 113 |
| Nov 24, 2023 | DPWH (JV) | ₱384,832,454.00 | On-going | 83.8% | — | 37th, p. 49 |
| Sep 15, 2023 | DPWH | ₱55,005,000.00 | Final | 89.0% | 89.4% | 36th, p. 102 |
| Jun 5, 2023 | DPWH | ₱61,570,860.00 | Final | 99.9% | 93.5% | 36th, p. 102 |
| Mar 17, 2023 | DPWH | ₱30,379,820.00 | Completed | 93.6% | 94.0% | 35th, p. 83 |
| Mar 16, 2023 | DPWH | ₱55,005,000.00 | On-going | 90.2% | — | 35th, p. 83 |
| Jan 19, 2023 | DPWH | ₱102,626,693.00 | Completed | 95.8% | 95.8% | 35th, p. 82 |
| Jan 19, 2023 | DPWH (JV) | ₱95,329,877.00 | Completed | 92.6% | 92.6% | 35th, p. 83 |
| Oct 20, 2022 | DPWH | ₱60,951,053.00 | On-going | 83.7% | — | 35th, p. 83 |
| Jul 7, 2022 | DPWH | ₱60,951,053.00 | On-going | 94.6% | — | 35th, p. 83 |
Showing the 12 most recent of 16.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →