MIRCONS CONST AND SUPPLIES is listed as a company organization in Philippine public procurement records on this site, with 29 linked DPWH project(s) totaling about ₱147,325,501.47. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
MIRCONS CONST AND SUPPLIES
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 29
- Total value
- ₱147,325,501.47
- Published flags
- 0
- Region
- Albay 3rd DEO · Region V
Online presence
Google Maps: Mircons Construction and SuppliesGoogle Maps, 2026-10-22
7GRW+R88, Polangui, Albay
Licensed officers (PCAB)
- Ma.Lerna Hugo Mirabueno · Authorized Managing Officer (PCAB license 38321) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for MIRCONS CONST AND SUPPLIES — not an accusation or finding of wrongdoing.
Score: 85.60 / 100 · Projects in sample: 29 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 84.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 84.6
- lateCompletedProjects
- 4
- onTimeCompletedProjects
- 20
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 25
- pastTargetOngoingProjects
- 1
- undatedCompletedProjectsExcluded
- 4
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 29
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 29
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 29
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 29
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
24 geotagged projects — Open full map · Download projects (CSV)
- CONSTRUCTION OF TWO (2) STOREY SIX (6) CLASSROOM SCHOOL BUILDING, PALUMBANES INTEGRATED SCHOOL, CARAMORAN, CATANDUANES (PHASE I)23FH0070 · ₱15,889,424.42 · mapped
- CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING, DORORIAN NATIONAL HIGH SCHOOL, GIGMOTO, CATANDUANES23FH0072 · ₱14,736,442.99 · mapped
- CLUSTER III-2018: CONSTRUCTION OF FIVE (5) MULTI-PURPOSE BUILDINGS IN POLANGUI, ALBAY18FO0005 · ₱10,618,550.69 · mapped
- BIP; ACCESS ROAD AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR /STRATEGIC PUBLIC BUILDING FACILITIES-CONST. OF ACCESS ROAD FABRICA CALABANGA CAMARINES SUR23FF0012 · ₱9,424,960.66 · mapped
- CONST./COMPLETION OF MULTI PURPOSE BUILDING(PHILIPPINE NATIONAL POLICE) CONCEPCION PEQUENA NAGA CITY CAMARINES SUR23FF0029 · ₱7,902,324.13 · mapped
- CY-2016 BASIC EDUCATIONAL FACILITIES FUND (BEFF) - BATCH 9, CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM WITH COMFORT ROOM, SAGRADA NATIONAL HIGH SCHOOL, TINAMBAC, CAMARINES SUR16FF0066 · ₱6,350,383.77
- CONSTRUCTION OF MULTI-PURPOSE BUILDINGBARANGAY CASUNA, TIGAON, CAMARINES SUR22FG0042 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY BALAYNAN, GOA, CAMARINES SUR22FG0043 · ₱4,950,000.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, MACULIW, PANGANIBAN, CATANDUANES24FH0009 · ₱4,801,316.68 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY CUYAOYAO, PIO DURAN, ALBAY25FO0022 · ₱4,797,972.96 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BALINAD, POLANGUI, ALBAY18FO0046 · ₱4,796,471.16 · mapped
- CONCRETING OF ZONE 5 FMR BRGY. TOMAGODTOD TO BRGY. SIBOBO CALABANGA CAMARINES SUR23FF0071 · ₱4,785,927.00 · mapped
- BIP;ACCESS ROADS & /OR BRIDGES FROM THE NATIONAL ROAD LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD BRGY. SAN ISIDRO, CALABANGA CAMARINES SUR24FF0057 · ₱4,769,290.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY DUGCAL, CAMALIGAN, CAMARINES SUR22FF0007 · ₱4,766,515.76 · mapped
- BIP;ACCESS ROADS & OR BRIDGES FROM THE NATIONAL ROAD LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONST OF ACCESS ROAD BRGY FABRICA CALABANGA CAMARINES SUR24FF0010 · ₱4,753,213.57 · mapped
- BIP;ACCESS ROAD &/OR BRIDGES FROM THE NATL. RD. LEADING TO MAJOR-STRATEGIC PUBLIC BLDG./FACILITIES-CONST. OF ROAD SITIO TAWANG,BARANGAY FABRICA CALABANGA CAMARINES SUR25FF0019 · ₱4,719,804.98 · mapped
- CONSTRUCTION OF ONE (1) STOREY THREE (3) CLASSROOM WITH TOILET ATTACHED SCHOOL BUILDING MINORO COMMUNITY SCHOOL, SAN JOSE, CAMARINES SUR17FF0089 · ₱3,915,893.57
- CONSTRUCTION OF DRAINAGE SAN MIGUEL CALABANGA CAMARINES SUR21FF0038 · ₱2,969,858.95 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, GABON, POLANGUI, ALBAY20FO0022 · ₱2,924,882.73 · mapped
- CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM WITH TOILET ATTACHED SCHOOL BUILDING (BUILDING B), ADIANGAO HIGH SCHOOL, SAN JOSE, CAMARINES SUR17FF0131 · ₱2,912,123.73
- CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM WITH TOILET ATTAHCED SCHOOL BUILDING (BUILDING A), ADIANGAO HIGH SCHOOL, SAN JOSE, CAMARINES SUR17FF0130 · ₱2,912,123.73
- CONSTRUCTION OF MPB AT BRGY. MAYNAGA, POLANGUI, ALBAY19FO0108 · ₱2,909,492.40 · mapped
- CY-2018 HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) - SAN JOSE RHU COMPLETION, SAN JOSE, CAMARINES SUR18FF0124 · ₱2,889,450.00 · mapped
- CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM WITH TOILET ATTACHED SCHOOL BUILDING PALALE COMMUNITY SCHOOL, SAN JOSE, CAMARINES SUR17FF0091 · ₱2,748,537.61
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. WEST CARISAC, LIBON, ALBAY19FO0044 · ₱2,445,891.69 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, CUYAOYAO, PIODURAN, ALBAY20FO0023 · ₱2,435,800.47 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, LOWER BINOGSACAN, GUINOBATAN, ALBAY20FO0061 · ₱2,348,632.89 · mapped
- CONCRETING OF ROADS, LOURDES, POLANGUI, ALBAY20FO0024 · ₱1,950,241.79 · mapped
- CONCRETING OF ROADS AT MATAMBO, OAS, ALBAY19FO0100 · ₱949,973.14 · mapped
Equipment & capacity
PCAB license
- License no.
- 38321
- Category
- D · Small B
- Minimum net worth for this category
- ₱2,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱30M
- License valid until
- Oct 27, 2026
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 38321); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →