SUPREME BUILDERS CONST AND TRADING is listed as a company organization in Philippine public procurement records on this site, with 71 linked DPWH project(s) totaling about ₱1,536,753,818.52. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
SUPREME BUILDERS CONST AND TRADING
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 71
- Total value
- ₱1,536,753,818.52
- Published flags
- 0
- Region
- Bataan 2nd DEO · Region III
Online presence
Google Maps: Supreme Builders Construction And Trading★ 5 (1 reviews)Google Maps, 2026-10-22
Balanga City, Bataan
Licensed officers (PCAB)
- Hubert Baluyot Pizarro · Authorized Managing Officer (PCAB license 36299) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for SUPREME BUILDERS CONST AND TRADING — not an accusation or finding of wrongdoing.
Score: 71.00 / 100 · Projects in sample: 71 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 45.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 45.6
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 40
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 67
- pastTargetOngoingProjects
- 24
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 71
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 71
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 71
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 71
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 48 of 66 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, LIFELONG LEARNING CENTER, TESDA BUILDING, PHASE 3, BARANGAY TENEJERO, BALANGA CITY, BATAAN25CB0090 · ₱96,505,200.00 · mapped
- ROAD WIDENING - TERTIARY ROADS - GOV JJ LINAO RD - KO126+000-KO128+790, BATAAN 2ND DISTRICT24CB0079 · ₱94,281,064.99 · mapped
- CONVERGENCE & SPECIAL SUPPORT PROG - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROG - TRIP) - ACCESS ROAD TO BAGAC-MARIVELS ROAD LEADING TO BEACH AREAS, BRGY. QUINAWAN, BAGAC, BATAAN24C00050 · ₱94,077,890.24 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - JOSE ABAD SANTOS AVE (JASA) - DINALUPIHAN, BATAAN24C00038 · ₱61,274,999.78 · mapped
- ROAD WIDENING - TERTIARY ROAD - JCT LAYAC-BALANGA-MARIVELES PORT RD - KO122+1000-KO122+1373, KO122+1380-KO122+1637, KO130+000-KO130+980, KO130+986-KO131+250, BATAAN 2ND DISTRICT22CB0044 · ₱57,900,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALISAY RIVER STA 4 + 339 - STA. 4 + 099, BALANGA CITY, BATAAN25CB0120 · ₱56,742,006.91 · mapped
- ROAD WIDENING - SECONDARY ROADS - ROMAN EXPRESSWAY - K0135 + 745 - K0135 + 959, K0138 + 100 - K0138 + 120, K0141 + 902 - K0142 + 692, BATAAN 2ND DISTRICT25CB0068 · ₱53,229,445.74 · mapped
- NETWORK DEVELOPMENT PROGRAM-ROAD-WIDENING-PRIMARY ROADS-JOSE ABAD SANTOS AVENUE (JASA) K0105+874.00 - K0106+335.00, K0109+640- K0109+831.60, K0112+412.25 - K0112+658.00, K0113+268.00 - K0113+460.00, K0113+995- K0114+471.00, K0114+714.50 - K0114+85418CA0058 · ₱52,148,599.75 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - BAGAC-MARIVELES RD - KO183+000-KO184+282, KO184+307-KO188+351, BATAAN 2ND DISTRICT22CB0039 · ₱49,000,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALISAY RIVER, STA. 10 + 139 - STA. 10 + 389, BALANGA CITY, BATAAN25CB0015 · ₱47,985,680.09 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALISAY RIVER, STA. 10 + 007 - STA. 10 + 273, PILAR, BATAAN25CB0005 · ₱47,970,972.80 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALISAY RIVER, STA. 9 + 741 - STA. 10 + 007, PILAR, BATAAN25CB0012 · ₱47,970,948.03 · mapped
- ROAD WIDENING - SECONDARY ROADS - ROMAN EXPRESSWAY - KO132+365-KO132+786, KO135+996-KO136+300, KO137+246-KO137+500, BATAAN 2ND DISTRICT24CB0035 · ₱47,769,985.20 · mapped
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - GOV JJ LINAO RD - BAGAC, BATAAN25CO0048 · ₱42,552,117.97
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - BAGAC-MARIVELES ROAD- KO163+420-KO164+220, BATAAN 2ND DISTRICT22CB0054 · ₱38,002,567.95 · mapped
- PREVENTIVE MAINTENANCE - TERTIARY ROADS - VISAYAS AVENUE (RO1124LZ) - KO164+(-213)-KO164+520, BATAAN 2ND DISTRICT22CB0032 · ₱32,979,940.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (LIFELONG LEARNING CENTER, TESDA BUILDING), BARANGAY TENEJERO, BALANGA CITY, BATAAN22CB0013 · ₱29,700,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN VICENTE RIVER, ORION, BATAAN22CB0048 · ₱29,400,000.00 · mapped
- CONSTRUCTION OF SITIO GASILE RIVER CONTROL, STA. 0+000 - STA. 0+350, PILAR, BATAAN21CB0024 · ₱28,769,860.00 · mapped
- PREVENTIVE MAINTENANCE - SECONDARY ROAD - ROMAN EXPRESSWAY - KO144+900-KO145+623, KO151+000-KO151+376, BATAAN 2ND DISTRICT22CB0036 · ₱27,781,040.00 · mapped
- PREVENTIVE MAINTENANCE-SECONDARY ROAD-ROMAN EXPRESSWAY-KO120+942-KO121+855, BALANGA, BATAAN19CB0031 · ₱25,676,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL SRUCTURE ALONG TALISAY RIVER (PUNZALAN ST. SECTION) BALANGA CITY, BATAAN19CB0042 · ₱24,500,000.00 · mapped
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - ROMAN EXPRESSWAY - K0135 + 996 - K0136 + 300, K0138 + 100 - K0138 + 300, BATAAN 2ND DISTRICT25CB0072 · ₱20,969,531.36 · mapped
- CONSTRUCTION OF 2STY4CL, ALAULI ES, PILAR, BATAAN24CB0141 · ₱19,637,095.08 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BALANGA CITY, BATAAN24CB0043 · ₱19,354,672.03 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TALISAY RIVER, SANTA ROSA, PILAR, BATAAN25CB0016 · ₱19,193,299.51 · mapped
- CONSTRUCTION OF PEDESTRIAN OVERPASS ALONG ROMAN EXPRESSWAY, UPER SABATAN, ORION, BATAAN24CB0087 · ₱19,158,683.23 · mapped
- PREVENTIVE MAINTENANCE - TERTIARY ROAD - JCT LAYAC-BALANGA-MARIVELES PORT RD - KO153+(-738)-KO153+(-698), KO153+(-661)-KO153+(-561), KO153+(-100)-KO153+265, KO153+287-KO153+603, BATAAN 2ND DISTRICT22CB0043 · ₱18,742,500.00 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT-SECONDARY ROAD-JCT LAYAC-BALANGA-MARIVELES PORT RD-KO153+-1020-KO153+-970,KO153+287-KO153+603,KO153+628-KO154+720, MARIVELES, BATAAN19CB0016 · ₱18,671,940.00 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT) IN BARANGAY PANILAO, PILAR, BATAAN25CB0083 · ₱18,405,585.00 · mapped
- NETWORK DEVELOPMENT PROGRAM-OFF-CARRIAGEWAY IMPROVEMENT-TERTIARY ROADS - JCT-LAYAC-BALANGA-MARIVELES PORT ROAD, K103+180 K0103+400, K0112+293 - K0112+840 K0116+193.50, -K0116+790.13 BATAAN 1ST DISTRICT20CA0022 · ₱16,573,755.02 · mapped
- FLOOD MANAGEMENT PROGRAM CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, TALISAY RIVER, BOULEVARD, BRGY. BAGUMBAYAN, BALANGA CITY, BATAAN18CB0049 · ₱14,700,000.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY CALAYLAYAN, ABUCAY, BATAAN25CA0069 · ₱14,538,612.79 · mapped
- CONSTRUCTION OF TWO(2) STOREY FOUR(4) CLASSROOM AT SABATAN ES, ORION, BATAAN20CB0074 · ₱14,086,461.66 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF ABUCAY RIVER (OMBOY SECTION),ABUCAY, BATAAN17CA0054 · ₱13,671,000.00
- ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - JOSE ABAD SANTOS AVE (JASA) - K0108+070-K0108+236, K0109+032-K0109+455DINALUPIHAN, BATAAN21CA0016 · ₱13,126,117.54 · mapped
- CONSTRUCTION OF TWO(2) STOREY SIX(6) CLASSROOM AT ORION ES, ORION, BATAAN18CB0110 · ₱11,580,215.34 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT -TERTIARY ROADS - JCT LAYAC-BALANGA-MARIVELES PORT RD - KO134+224-KO134+787, BATAAN 2ND DISTRICT24CB0009 · ₱11,034,800.00 · mapped
- CONSTRUCTION (COMPLETION) OF NEW MUNICIPAL HALL, BRGY SAN VICENTE, ORION, BATAAN24CB0044 · ₱9,900,000.00 · mapped
- CONSTRUCTION OF BALANGA CITY BY-PASS ROAD, BARANGAY TUYO, BALANGA CITY, BATAAN24CB0078 · ₱9,900,000.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES BAGAC-MARIVELES BY-PASS ROAD CONNECTING BAGAC-MARIVELES ROAD TO FREEPORT AREA OF BATAAN IN SUPPORT TO MIX-USED INDUSTRY-ELECTRONICS, GARMETS, FASHION BAGS, FAB, MARI19CB0024 · ₱9,800,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY CUPANG PROPER, BALANGA CITY, BATAAN25CB0105 · ₱9,666,163.30 · mapped
- CONSTRUCTION (COMPLETION) OF NEW MUNICIPAL HALL, BARANGAY SAN VICENTE, ORION, BATAAN25CB0084 · ₱9,657,450.33 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY SAN JOSE, CITY OF BALANGA, BATAAN25CB0081 · ₱9,656,439.83 · mapped
- CONSTRUCTION OF CONCRETE REVETMENT ALONG CUPANG WEST CREEK (PHASE 2), BARANGAY CUPANG WEST, BALANGA CITY, BATAAN24CB0048 · ₱9,650,514.57 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) IN BARANGAY SIBACAN, BALANGA CITY, BATAAN25CB0054 · ₱9,619,830.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM CSSP) - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) BALSIK-PULO-ALMACEN ROAD, BRGY. PULO, HERMOSA, BATAAN22CA0029 · ₱9,605,027.05 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TUYO, BALANGA CITY, BATAAN24CB0040 · ₱7,920,000.00 · mapped
- PREVENTIVE MAINTENANCE - TERTIARY ROADS - JCT LAYAC-BALANGA-MARIVELES PORT RD - KO132+460-KO132+810, BATAAN 2ND DISTRICT22CB0016 · ₱7,265,720.00 · mapped
- CONCRETING OF LUPANG TAGALOG, BRGY. ALAULI FMR, BRGY. ALAULI, PILAR, BATAAN18CB0095 · ₱4,974,389.85 · mapped
Equipment & capacity
PCAB license
- License no.
- 36299
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Nov 15, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 36299); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
3 evaluations listed across 3 GPPB CPES releases; 3 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| May 2, 2025 | DPWH (JV) | ₱47,970,948.00 | On-going | 94.3% | — | 40th, p. 298 |
| Aug 15, 2024 | DPWH | ₱7,731,419.00 | On-going | 87.7% | — | 38th, p. 233 |
| May 9, 2023 | DPWH | ₱29,700,218.00 | On-going | 89.4% | — | 36th, p. 204 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →