Buildings and Facilities24KF0077

BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY, POBLACION, SULTAN NAGA DIMAPORO, LANAO DEL NORTE

BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY, POBLACION, SULTAN NAGA DIMAPORO, LANAO DEL NORTE is a DPWH-tracked public work in Lanao del Norte 2nd DEO, Region X. Reported contract value: ₱29,397,238.30. Status: Reported complete (DPWH). Contractor on record: MOYA CONST. Figures trace to dpwh.

Lanao del Norte 2nd DEO, Region X
Region: Region X

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱5,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROVIII-24-0012143 · ₱19,659,000 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24KF0077 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-09-25 → 2020-09-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY, POBLACION, SULTAN NAGA DIMAPORO, LANAO DEL NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Brgy. Big Banisilon, Tangcal, Lanao del Norte
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROVIII-24-0012143

₱19,659,000.00 · FY2024

Released to Lanao del Norte 2nd DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

47 projects · ₱686.4M total · 0 flags

Other projects by this contractor

No sat.

ROAD WIDENING - PRIMARY ROADSMAHARLIKA HIGHWAY( MALABANG-DOBLESTON-TUKURAN RD) - K1969 + (-651) - K1969 + (-641), K1981 + 600 - K1981 + 742, K1981 + 767.70 - K1982 + 000, K1984 + 000 - K1984 + 1067, K1985 + 060 - K1985 + 300, K1989 + 305 - K1989 + 449,

Region X, Region X

2025₱80.0M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF CONCRETE ROAD FROM BRGY. CALUBE-BRGY. LANTAWAN, SND, LANAO DEL NORTE

Lanao del Norte 2nd DEO, Region X

2025₱43.3M
Reported complete (100% progress, DPWH status On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD FROM BRGY. PULANG YUTA - BRGY. CALUBE, SND, LANAO DEL NORTE

Lanao del Norte 2nd DEO, Region X

2025₱39.1M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CLUSTER D OFF CARRAIGEWAY IMPROVEMENT OF VARIOUS ROAD PROJECTS IN LANAO DEL NORTE

Region X, Region X

2024₱34.2M
Reported complete (DPWH)
No sat.

CONCRETING OF BRGY. MABUHAY TO BRGY. CAPOCAO FMR, BRGY. MABUHAY AND BRGY. CAPOCAO, SULTAN NAGA DIMAPORO, LANAO DEL NORTE

Lanao del Norte 2nd DEO, Region X

2024₱32.8M
Reported complete (DPWH)
No sat.

ROAD WIDENING-PRIMARY ROADS MAHARLIKA HIGHWAY (MALABANG-DOBLESTON-TUKURAN RD) - K1980 + 969 - K1981 + 240, K1981 + 430 -K1981 + 608, K1981 + 875 - K1982 + 324

Region X, Region X

2025₱29.6M
Reported complete (100% progress, DPWH status On-Going)
View all 47 projects →

4. Implementation

Contract Amount

₱29,397,238.30

Progress

Reported complete (DPWH)

Start Date

January 17, 2025

Target End

July 13, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)Lanao del NorteSultan Naga DimaporoPoblacion
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.