MOYA CONST is listed as a company organization in Philippine public procurement records on this site, with 47 linked DPWH project(s) totaling about ₱686,354,220.03. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
MOYA CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 47
- Total value
- ₱686,354,220.03
- Published flags
- 0
- Region
- Lanao del Norte 2nd DEO · Region X
Online presence
Google Maps: Moya ConstructionGoogle Maps, 2026-10-22
Purok 8B, Cabili Village, Balite Dr, Santiago, Iligan City, Lanao del Norte
Licensed officers (PCAB)
- Aquil Lanto Macagaan · Authorized Managing Officer (PCAB license 47707) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for MOYA CONST — not an accusation or finding of wrongdoing.
Score: 90.00 / 100 · Projects in sample: 47 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 90.5/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 90.5
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 38
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 40
- pastTargetOngoingProjects
- 2
- undatedCompletedProjectsExcluded
- 7
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 47
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 47
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 47
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 47
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
47 geotagged projects — Open full map · Download projects (CSV)
- ROAD WIDENING - PRIMARY ROADSMAHARLIKA HIGHWAY( MALABANG-DOBLESTON-TUKURAN RD) - K1969 + (-651) - K1969 + (-641), K1981 + 600 - K1981 + 742, K1981 + 767.70 - K1982 + 000, K1984 + 000 - K1984 + 1067, K1985 + 060 - K1985 + 300, K1989 + 305 - K1989 + 449,25K00370 · ₱80,025,372.82 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF CONCRETE ROAD FROM BRGY. CALUBE-BRGY. LANTAWAN, SND, LANAO DEL NORTE25KF0012 · ₱43,283,788.47 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD FROM BRGY. PULANG YUTA - BRGY. CALUBE, SND, LANAO DEL NORTE25KF0076 · ₱39,143,821.18 · mapped
- CLUSTER D OFF CARRAIGEWAY IMPROVEMENT OF VARIOUS ROAD PROJECTS IN LANAO DEL NORTE24K00257 · ₱34,218,716.64 · mapped
- CONCRETING OF BRGY. MABUHAY TO BRGY. CAPOCAO FMR, BRGY. MABUHAY AND BRGY. CAPOCAO, SULTAN NAGA DIMAPORO, LANAO DEL NORTE24KF0068 · ₱32,799,179.19 · mapped
- ROAD WIDENING-PRIMARY ROADS MAHARLIKA HIGHWAY (MALABANG-DOBLESTON-TUKURAN RD) - K1980 + 969 - K1981 + 240, K1981 + 430 -K1981 + 608, K1981 + 875 - K1982 + 32425K00141 · ₱29,578,591.35 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY, POBLACION, SULTAN NAGA DIMAPORO, LANAO DEL NORTE24KF0077 · ₱29,397,238.30 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (DOJ NATIONAL PROSECUTION OFFICE-REGION XIV), MARAWI CITY, LANAO DEL SUR24K00380 · ₱28,371,000.00 · mapped
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY( MALABANG-DOBLESTON-TUKURAN RD) - K1985 + 273 - K1986 + 06625K00097 · ₱27,000,680.70 · mapped
- NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS - MALABANG-DOBLESTON-TUKURAN ROAD, K2000+000-K2002+244, SND, LANAO DEL NORTE23KF0019 · ₱26,337,246.75 · mapped
- NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS,MALABANG-DOBLESTON-TUKURAN ROAD,SND,LANAO DEL NORTE K1975+366-K1976+24221KG0032 · ₱22,854,301.50 · mapped
- ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS,MALABANG-DOBLESTON-TUKURAN ROAD-K1969+000-K1969+143,SND,LANAO DEL NORTE23KF0034 · ₱20,144,642.40 · mapped
- NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS, MALABANG-DOBLESTON-TUKURAN ROAD, K1974+000-K1975+300, SND, LANAO DEL NORTE22KG0016 · ₱18,255,174.23 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS, MALABANG-DOBLESTON-TUKURAN ROAD, K1985+906-K1986+062, SULTAN NAGA DIMAPORO, LANAO DEL NORTE22KG0027 · ₱13,929,539.41 · mapped
- BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, MALA-APO BR. (B01007MN) ALONG MALABANG-DOBLESTON-TUKURAN ROAD, SULTAN NAGA DIMAPORO, LANAO DEL NORTE23KF0073 · ₱13,888,146.64 · mapped
- ASSET PRESERVATION PROGRAM-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY ROADS LINAMON-ZAMBOANGA RAOD,K1603+250-K1603+681,K1603+890-K1603+1100,K1604+150-K1604+400,KAPATAGAN,LANAO DEL NORTE23KF0062 · ₱12,504,453.44 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, DOBLESTON-BUTADON ROAD, K2008+054-K2008+218, KAPATAGAN, LANAO DEL NORTE25KF0055 · ₱12,283,697.01 · mapped
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY( MALABANG-DOBLESTON-TUKURAN RD) - K1972 + 290 - K1972 + 62025K00126 · ₱11,223,451.80 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS, MALABANG-DOBLESTON-TUKURAN ROAD, K1987+954-K1988+195, SND, LANAO DEL NORTE22KG0019 · ₱11,206,023.08 · mapped
- ASSET PRESERVATION PROGRAM - CONSTRUCTION.UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY ROADS,MALABANG-DOBLESTON-TUKURAN ROAD,SND,LANAO DEL NORTE K1988+830-K1989+23521KG0017 · ₱11,144,214.00 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, DOBLESTON-BUTADON ROAD, K1996+160-K1996+220,K1996+245-K1996+272, SULTAN NAGA DIMAPORO, LANAO DEL NORTE24KF0046 · ₱11,051,503.35 · mapped
- BASIC EDUCATIONAL FACILITIES FUND (BEFF) CONSTRUCTION OF ONE (1) STOREY THREE (3) CLASSROOM BATCH 1 AT SULTAN ALI DIMAPORO MEMORIAL IS, SULTAN NAGA DIMAPORO, LANAO DEL NROT23KF0132 · ₱10,797,984.14 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, PHASE III, BRGY. POBLACION, SND, LANAO DEL NORTE24KF0029 · ₱9,652,046.35 · mapped
- BASIC INFRA PROGRAM (BIP) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BRGY. DANGULAAN, SULTAN NAGA DIMAPORO, LANAO DEL NORTE23KF0108 · ₱9,648,306.63 · mapped
- ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS,SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS MALABNG-DOBLESTON-TUKURAN ROAD,K1970+236-K1970+375,SND,LANAO DEL NORTE23KF0032 · ₱9,643,261.19 · mapped
- NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT ALONG PRIMARY ROADS, MALABANG-DOBLESTON-TUKURAN ROAD - S00931MN, SND, LANAO DEL NORTE; K1979+000-K1979+74321KG0008 · ₱8,731,072.15 · mapped
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS MAHARLIKA HIGHWAY (MALABANG-DOBLESTON-TUKURAN RD) - K1985 + 295 - K1985 + 34925K00371 · ₱7,965,526.82 · mapped
- NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS, DOBLESTON-BUTADON ROAD, K2001+355-K2001+900, SND, LANAO DEL NORTE25KF0041 · ₱7,846,860.00 · mapped
- NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS, DOBLESTON-BUTADON ROAD, K2002+860-K2003+408, SND, LANAO DEL NORTE25KF0083 · ₱7,467,624.98 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS, MALABANG-DOBLESTON-TUKURAN ROAD, K1984+315-K1984+460, SND, LANAO DEL NORTE22KG0051 · ₱7,461,590.82 · mapped
- BASIC EDUCATIONAL FACILITIES FUND (BEFF) CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN SULTAN NAGA DIMAPORO MEMORIAL INTEGRATED SCHOOL, SULTAN NAGA DIMAPORO, LANAO DEL NORTE24KF0072 · ₱7,438,684.77 · mapped
- BASIC EDUCATION FACILITIES FUND (BEFF) - CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING IN SULTAN ALI DIMAPORO MEMORIAL INTEGRATED SCHOOL, SND, LANAO DEL NORTE24KF0063 · ₱7,296,214.53 · mapped
- CONSTRUCTION OF 1STY2CL, CAYONTOR PS, KAUSWAGAN, LANAO DEL NORTE23KG0064 · ₱7,098,404.33 · mapped
- ASSET PRESERVAATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, DOBLESTON-BUTADON ROAD - K1994+534-K1994+578, SND, LANAO DEL NORTE23KF0049 · ₱6,057,870.00 · mapped
- ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS MALABANG-DOBLESTON-TUKURAN ROAD-K1998+981*K1999+158,SND,LANAO DEL NORTE23KF0035 · ₱6,016,856.10 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY LANTAWAN, SULTAN NAGA DIMAPORO, LANAO DEL NORTE25KF0019 · ₱5,390,399.23 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, DOBLESTON-BUTADON ROAD,K1999+476-K1999+550, SND, LANAO DEL NORTE23KF0067 · ₱5,090,904.00 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS, MALABANG-DOBLESTON-TUKURAN ROAD, K1994+678 - K1994+788, SND, LANAO DEL NORTE22KG0039 · ₱5,009,633.09 · mapped
- CONCRETING OF SITIO MAGAYAD, BRGY. TIGNAPOLOAN FMR, BRGY. TIGNAPOLOAN, CAGAYAN DE ORO CITY24KH0077 · ₱4,975,000.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. RAMAIN, SULTAN NAGA DIMAPORO, LANAO DEL NORTE24KF0020 · ₱4,825,111.66 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. PIKALAWAG, SULTAN NAGA DIMAPORO, LANAO DEL NORTE24KF0021 · ₱4,824,296.77 · mapped
- ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS,SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS DOBLESTON-BUTADON ROAD,K1997+181-K1997+226,SND,LANAO DEL NORTE23KF0063 · ₱3,267,810.00 · mapped
- CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE & SEWERAGE/RAINWATER COLLECTOR SYSTEM-RAINWATER COLLECTORS IN PUBLIC FACILITIES IN LANAO DEL NORTE AT 2ND CONGRESSIONAL DISTRICT22KG0105 · ₱3,097,558.38 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, DOBLESTON-BUTADON ROAD, K2000+852-K2000+912, SND, LANAO DEL NORTE22KG0056 · ₱2,910,459.59 · mapped
- ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS,SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS MALABANG-DOBLESTOBN-TUKURAN ROAD-K2002+054-K2002+129,SND,LANAO DEL NORTE23KF0031 · ₱2,484,300.00 · mapped
- BRIDGE PROGRAM RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES KOREO BRIDGE BR. (B01005MN) ALONG MALABANG-DOBLESTON-TUKURAN ROAD, SULTAN NAGA DIMAPORO, LANAO DEL NORTE, K1987+16822KG0025 · ₱1,425,737.24 · mapped
- BRIDGE PROGRAM - REHAB./MAJOR REPAIR OF PERMANENT BRIDGES - KAROMATAN BR. (B01804MN) ALONG MALABANG-DOBLESTON-TUKURAN ROAD, SND, LANAO DEL NORTE23KF0015 · ₱1,289,925.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 47707
- Category
- C · Small B
- Minimum net worth for this category
- ₱6,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱30M
- License valid until
- Jan 17, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 47707); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
5 evaluations listed across 4 GPPB CPES releases; average final rating 87.2% over 2 rated projects; 5 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 27, 2025 | DPWH | 32,799,179.190 (₱ thousands, as printed; flagged) | Completed | 94.1% | 91.6% | 40th, p. 213 |
| Jun 2, 2025 | DPWH | ₱43,283,788.00 | On-going | 92.8% | — | 40th, p. 213 |
| Nov 5, 2024 | DPWH | ₱32,799,179.00 | On-going | 89.9% | — | 39th (rev), p. 143 |
| Jun 22, 2023 | DPWH | ₱9,648,307.00 | On-going | 94.8% | — | 36th, p. 141 |
| Mar 7, 2023 | NAPOCOR | ₱2,945,698.00 | Completed | 82.8% | 82.8% | 35th, p. 116 |
1 amount flagged: the printed value is implausible for a ₱-thousands column or disagrees with the DPWH award, so we show it as printed instead of converting it.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →