Flood Control and Drainage18MD0038

CONSTRUCTION OF NICAAN FLOOD CONTROL (GABIONS), SUBSIDIARY OF LIBUNGAN RIVER, LIBUNGAN, COTABATO

CONSTRUCTION OF NICAAN FLOOD CONTROL (GABIONS), SUBSIDIARY OF LIBUNGAN RIVER, LIBUNGAN, COTABATO is a DPWH-tracked public work in Cotabato 1st DEO, Region XII. Reported contract value: ₱37,258,400.50. Status: Reported complete (DPWH). Contractor on record: LLABAN CONST. Figures trace to dpwh.

Cotabato 1st DEO, Region XII
Region: Region XII

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXII-18-0027502 · · release to the district office, not itemized per project

    Possible match · score 0.71

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18MD0038 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-08-24 → 2025-09-06

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Cotabato

Based on the coordinates published with the DPWH record and NOAH file Cotabato.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF NICAAN FLOOD CONTROL (GABIONS),  SUBSIDIARY OF LIBUNGAN RIVER, LIBUNGAN, COTABATO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of River Bank protection (Revetment) at Tamontaka Mother (Downstream) Phase III, Tamontaka River, Cotabato City
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXII-18-0027502

₱0.00 · FY2018

Released to Division of Sarangani (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

479 projects · ₱8.9B total · 0 flags

4. Implementation

Contract Amount

₱37,258,400.50

Progress

Reported complete (DPWH)

Start Date

February 28, 2018

Target End

September 17, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF NICAAN FLOOD CONTROL (GABIONS), SUBSIDIARY OF LIBUNGAN RIVER, LIBUNGAN, COTABATO.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/04e282d8-268f-4881-851f-30fd27c89d14

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region XII (SOCCSKSARGEN)CotabatoLibunganNica-an
Storms whose wind field reached it
Jelawat 2023
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.