Roads24HA0125

CONCRETING OF BRGY. MAGSIJA TO BRGY. CABAD FMR, BRGY. MAGSIJA AND BRGY. CABAD, BALILIHAN, BOHOL

CONCRETING OF BRGY. MAGSIJA TO BRGY. CABAD FMR, BRGY. MAGSIJA AND BRGY. CABAD, BALILIHAN, BOHOL is a DPWH-tracked public work in Bohol 1st DEO, Region VII. Reported contract value: ₱29,825,000.00. Status: Reported complete (DPWH). Contractor on record: N N YU CONST INC FORMERLY: YU CONST. Figures trace to dpwh.

Bohol 1st DEO, Region VII
Region: Region VII

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROX-24-0009887 · ₱305,256 · release to the district office, not itemized per project

    Possible match · score 0.61

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱29,825,000 · N.N. YU CONSTRUCTION, .

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-07-29 → 2025-09-07

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF BRGY. MAGSIJA TO BRGY. CABAD FMR, BRGY. MAGSIJA AND BRGY. CABAD, BALILIHAN, BOHOL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Abucayan Norte Flood Control, Abucayan Norte, Calape, Bohol
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROX-24-0009887

₱305,256.00 · FY2024

Released to Division of Iligan City (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

24HA0125

₱29,825,000.00 · N.N. YU CONSTRUCTION, .

Award / contract ref: 24HA0125

Contractor

B

89 projects · ₱4.4B total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF JCT. (TER) LA UNION (CANDIJAY)-CABULAO-LUNGSODAAN-POOK ROAD (MABINI), CANDIJAY, BOHOL, SECTION 1: STA.0+000-STA.

Region VII, Region VII

2021₱147.2M
Reported complete (DPWH)
No sat.

MF0 1-NATIONAL ROAD NETWORK SERVICES-NETWORK DEVELOPMENT, OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, P00106520VS, SECONDARY ROADS, S00030BH, TAGBILARAN NORTH ROAD (TAGBILARAN-JETAFE SECT.)

Region VII, Region VII

2017₱147.0M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONST. OF FLOOD MITIGATION STRUCTURE ALONG CASBU RIVER, CANDIJAY, BOHOL, STA. 0+393.84 - STA. 0+947.84

Bohol 3rd DEO, Region VII

2025₱144.7M
Past target date (DPWH On-Going)
No sat.

MF0 3- CONSTRUCTION AND MAINTENANCE OF OTHER INFRASTRUCTURE, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, P00131017VS JCT. (TER) GUINDULMAN-ANDA BADIANG COGTONG ROAD LEADING TO BEACHES AND RESORTS, CANDIJAY, BOHOL 3L

Region VII, Region VII

2017₱142.4M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF ROAD, SIKATUNA TO SEVILLA, BOHOL PROVINCE, SECTION 1: STA.0+000 TO STA.1+106, SECTION

Region VII, Region VII

2021₱125.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) JCT. (TER) ALBURQUERQUE-SIKATUNA ROAD IN SUPPORT OF THE AGRIBUSINESS INDUSTRY, S

Bohol 1st DEO, Region VII

2023₱120.5M
Reported complete (DPWH)
View all 89 projects →

4. Implementation

Contract Amount

₱29,825,000.00

Progress

Reported complete (DPWH)

Start Date

August 27, 2024

Target End

April 4, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)BoholBalilihanCabad
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.