CONSTRUCTION OF FLOOD CONTROL AT ALUBIJID RIVER (UPSTREAM AND DOWNSTREAM) ALONG ALUBIJID BRIDGE MISA
CONSTRUCTION OF FLOOD CONTROL AT ALUBIJID RIVER (UPSTREAM AND DOWNSTREAM) ALONG ALUBIJID BRIDGE MISA is a DPWH-tracked public work in Misamis Oriental 2nd DEO, Region X. Reported contract value: ₱36,248,822.88. Status: Reported complete (DPWH). Contractor on record: TRIPARCO DEVELOPMENT CORP. Figures trace to dpwh.
Total Contract Cost

