CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GAHUB RIVER (DOWNSTREAM, LEFT SIDE), GINGOOG CITY, MISAMIS ORIENTAL
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GAHUB RIVER (DOWNSTREAM, LEFT SIDE), GINGOOG CITY, MISAMIS ORIENTAL is a DPWH-tracked public work in Misamis Oriental 1st DEO, Region X. Reported contract value: ₱30,798,456.92. Status: Reported complete (DPWH). Contractor on record: ROAD EDGE TRADING. Figures trace to dpwh.
Total Contract Cost


