Flood Control and Drainage18GE0097

CONSTRUCTION OF TUMANDA 2 RIVER CONTROL SYSTEM, CABANO, SAN LORENZO, GUIMARAS

CONSTRUCTION OF TUMANDA 2 RIVER CONTROL SYSTEM, CABANO, SAN LORENZO, GUIMARAS is a DPWH-tracked public work in Guimaras DEO, Region VI. Reported contract value: ₱32,660,928.71. Status: Reported complete (DPWH). Contractor on record: F GURREA CONST INC. Figures trace to dpwh.

Guimaras DEO, Region VI
Region: Region VI

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2018 · ₱35,100

    Probable match · score 0.97

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVI-18-0013467 · · release to the district office, not itemized per project

    Possible match · score 0.81

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18GE0097 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-04-04 → 2025-12-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

No Project NOAH flood map for this province · Guimaras

Based on the coordinates published with the DPWH record. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF TUMANDA 2 RIVER CONTROL SYSTEM, CABANO, SAN LORENZO, GUIMARAS

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 97%

UACS
18001
Amount
₱35,100,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Tumanda 2 River Control System, Cabano, San Lorenzo, Guimaras
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVI-18-0013467

₱0.00 · FY2018

Released to Division of Guimaras (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱32,660,928.71

Progress

Reported complete (DPWH)

Start Date

June 9, 2018

Target End

November 11, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF TUMANDA 2 RIVER CONTROL SYSTEM, CABANO, SAN LORENZO, GUIMARAS.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/243d6917-227c-46b8-aef7-f491624bab63

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)GuimarasSan LorenzoCabano
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.