Buildings and Facilities22FC0026

CONSTRUCTION OF FEMALE BARRACKS, CAMP BUSIG-ON, BRGY. TULAY NA LUPA, CAMARINES NORTE

CONSTRUCTION OF FEMALE BARRACKS, CAMP BUSIG-ON, BRGY. TULAY NA LUPA, CAMARINES NORTE is a DPWH-tracked public work in Camarines Norte DEO, Region V. Reported contract value: ₱9,793,366.51. Status: Reported complete (DPWH). Contractor on record: AVZ CONST AND SUPPLY. Figures trace to dpwh.

Camarines Norte DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱35,000

    Probable match · score 0.87

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROV-22-0014169 · ₱42,786,246 · release to the district office, not itemized per project

    Possible match · score 0.70

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22FC0026 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-06-21 → 2025-04-17

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FEMALE BARRACKS, CAMP BUSIG-ON, BRGY. TULAY NA LUPA, CAMARINES NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱35,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure at Brgy. Mabilo 1, Labo, Camarines Norte
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROV-22-0014169

₱42,786,246.00 · FY2022

Released to Camarines Norte DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

23 projects · ₱227.4M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1 (OO1): ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-SECONDARY ROADS-DAET AIRPORT RD-K0344+941-K0345+916, DAET AIRPORT RD-K0344+94

Region V, Region V

2024₱24.1M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF COMPREHENSIVE DRAINAGE SYSTEM OF DAET, PHASE II, DAET,

Region V, Region V

2023₱23.4M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONCRETING OF DRAINAGE SYSTEM, BRGY. LAG-ON, DAET, CAMARINES NOR

Region V, Region V

2025₱18.7M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-DAET-VINZONS LEADING TO MANTIGBI-SULA-SABANG-AGUIT-IT BEACH, QUINAMANUKAN ISLAND, VINZONS,

Region V, Region V

2025₱18.7M
Past target date (DPWH On-Going)
No sat.

CONCRETING OF BRGY. PAMBUHAN FMR, BRGY. PAMBUHAN, MERCEDES CAMARINES NORTE

Camarines Norte DEO, Region V

2019₱14.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ADMINISTRATION BUILDING, CAMP BUSIG-ON, BRGY. TULAY NA LUPA, LABO, CAMARINES NORTE

Camarines Norte DEO, Region V

2021₱11.2M
Reported complete (DPWH)
View all 23 projects →

4. Implementation

Contract Amount

₱9,793,366.51

Progress

Reported complete (DPWH)

Start Date

March 30, 2022

Target End

October 25, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines NorteLaboTulay Na Lupa
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.