Municipality

Labo

Labo, Camarines Norte, Region V (Bicol Region). 1st income class. Population 108,319 (2024 POPCEN).

Data-quality note: 61 DPWH projects linked to Labo have no coordinates published by DPWH, so they are not on the map and cannot be checked with satellite images.

PSGC 0501606000 · Source: PSA, PSGC 3Q 2026 Publication Datafile

Public records linked to Labo

Counts include this municipality and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.

DPWH infrastructure projects

Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal

427 records · ₱14,181,443,581.89

66 placed at Labo level itself; the rest in LGUs under it.

  1. Convergence and Special Support Program-Basic Infrastructure Program (Bip)-Bip-Flood Mitigation Structures Protecting Major/Strategic Public Buildings/Facilities-Construction of Flood Mitigation Structure, Barangay Guinacutan, Vinzons, Camarines Norte, Vi₱197,998,226.52 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  2. Convergence and Special Support Program-Special Road Fund-Motor Vehicle User'S Charge(Mvuc) As Per R.A. 11239-Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads Along Daang Maharlika (Lz)-K0275+000-K0276+024, K0276+510-K0277+000, K0283+000-K02₱161,447,732.02 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  3. Organizational Outcome 2: Protect Lives and Properties Against Major Floods-Flood Management Program-Construction/Rehabilitation of Flood Mitigation Facilities Within Major River Basins and Principal Rivers-Construction of Flood Mitigation Structure Along₱148,994,749.80 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  4. Organizational Outcome 2: Protect Lives and Properties Against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Construction of Flood Control Mitigation Structure, Barangay Guinacutan, Vinz₱144,938,109.69 · 2025 · high confidence (project coordinates inside the city/municipality boundary)
  5. Construction of Flood Control Structure Along Labo River (Downstream), Barangay Matanlang, Labo, Camarines Norte (Package Iv), Brgy. Matanlang, Labo, Camarines Norte₱144,749,981.54 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  6. Construction of Flood Control, Barangay Mabilo I - Mabilo Ii, Labo, Camarines Norte (Package 3), Brgy. Mabilo I - Mabilo Ii, Labo, Camarines Norte₱144,749,937.46 · 2024 · medium confidence (project coordinates inside the barangay boundary)

How linked: 361 by project coordinates inside the barangay boundary; 63 by project title names the place; 3 by project coordinates inside the city/municipality boundary.

Contracts this LGU awarded (PhilGEPS)

PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices

38 records · ₱2,110,848,528.47

1 placed at Labo level itself; the rest in LGUs under it.

  1. Municipality of Labo, Camarines Norte₱2,061,162,260.97 · high confidence (the LGU itself is the buyer)
  2. Barangay Bagong Silang I, Labo, Camarines Norte₱6,194,880.56 · high confidence (the LGU itself is the buyer)
  3. Barangay Napaod, Labo, Camarines Norte₱4,195,337.17 · high confidence (the LGU itself is the buyer)
  4. Barangay Bautista, Labo, Camarines Norte₱3,018,547.23 · high confidence (the LGU itself is the buyer)
  5. Barangay Bayan-Bayan, Labo, Camarines Norte₱2,657,725.88 · high confidence (the LGU itself is the buyer)
  6. Barangay Guinacutan - Labo, Camarines Norte₱2,380,627.93 · high confidence (the LGU itself is the buyer)

How linked: 38 by the LGU itself is the buyer.

PhilGEPS awards delivered here (all agencies)

Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices

Not yet linked to Labo itself. This shows the province figure for Camarines Norte.

37,045 records · ₱74,318,760,468.03

36,695 placed at Camarines Norte level itself; the rest in LGUs under it.

  1. Camarines Norte₱74,318,760,468.03 · 36,695 awards · high confidence (area of delivery is this province only)
  2. Albay, Camarines Norte₱401,903,240.34 · 2 awards · low confidence (area of delivery lists several provinces)
  3. Albay, Camarines Norte, Camarines Sur, Catanduanes, Masbate, Sorsogon₱176,181,300.57 · 161 awards · low confidence (area of delivery lists several provinces)
  4. Albay, Camarines Norte, Masbate₱102,726,190.19 · 1 awards · low confidence (area of delivery lists several provinces)
  5. Albay, Camarines Norte, Camarines Sur, Masbate, Sorsogon₱73,068,254.65 · 90 awards · low confidence (area of delivery lists several provinces)
  6. Albay, Camarines Norte, Camarines Sur, Sorsogon₱30,814,671.16 · 30 awards · low confidence (area of delivery lists several provinces)

How linked: 36,695 by area of delivery is this province only; 350 by area of delivery lists several provinces.

Local Government Support Fund releases

DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS

46 records · ₱174,498,175.19

5 placed at Labo level itself; the rest in LGUs under it.

  1. Upgrading of Water System₱10,000,000.00 · 2026 · high confidence (location columns in the DBM release)
  2. Construction of Level Iii Potable Water Supply System₱10,000,000.00 · 2026 · high confidence (location columns in the DBM release)
  3. Concreting of Farm-to-Market Road₱6,606,882.17 · 2023 · high confidence (location columns in the DBM release)
  4. Construction of Level Ii Potable Water Supply System₱6,606,882.17 · 2023 · high confidence (location columns in the DBM release)
  5. Upgrading of Water System₱6,606,882.17 · 2023 · high confidence (location columns in the DBM release)
  6. Opening With Concreting of Road₱6,606,882.17 · 2023 · high confidence (location columns in the DBM release)

How linked: 46 by location columns in the DBM release.

GAA budget lines naming this place

General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act

238 records · ₱8,114,181,000.00

91 placed at Labo level itself; the rest in LGUs under it.

  1. Construction of Flood Mitigation Structure Along Labo River, Barangay Sta. Cruz and Barangay Bakiad, Labo, Camarines Norte₱160,000,000.00 · 2024 · high confidence (GAA line text names the place)
  2. Construction of Flood Control Structure Along Busigon River, Phase I, Barangay Guisican, Labo, Camarines Norte₱150,000,000.00 · 2025 · medium confidence (GAA line text names the place)
  3. Construction of Flood Control Structure Along Busigon River, Phase I, Barangay Tigbinan, Labo, Camarines Norte₱150,000,000.00 · 2025 · medium confidence (GAA line text names the place)
  4. Construction of Flood Control Structure Along Busigon River, Phase Ii, Barangay Guisican, Labo, Camarines Norte₱150,000,000.00 · 2025 · medium confidence (GAA line text names the place)
  5. Construction of Flood Control Structure Along Busigon River, Phase Iii, Barangay Guisican, Labo, Camarines Norte₱150,000,000.00 · 2025 · medium confidence (GAA line text names the place)
  6. Construction of Flood Control Structure Along Labo River ( Downstream ) , Barangay Matanlang, Labo, Camarines Norte ( Package Ii )₱150,000,000.00 · 2024 · medium confidence (GAA line text names the place)

How linked: 238 by GAA line text names the place.

COA annual audit reports

Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.

Published anomaly flags

Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.

See all 26 published flags

Contractors on linked DPWH projects

All 73 contractors on DPWH projects linked to Labo and the LGUs under it. Click a column to sort.

Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.

Share card: Labo

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Barangays in Labo (52)

QR codes for Labo

Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.

Explore spending
Download SVG
Send evidence
Download SVG