ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DUGO FLOOD CONTROL STRUCTURE ALONG RIVER, ABULUG, CAGAYAN STA. 10+310-STA. 10+490(R/
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DUGO FLOOD CONTROL STRUCTURE ALONG RIVER, ABULUG, CAGAYAN STA. 10+310-STA. 10+490(R/ is a DPWH-tracked public work in Cagayan 2nd DEO, Region II. Reported contract value: ₱49,000,000.00. Status: Reported complete (DPWH). Contractor on record: EGB CONST CORP FORMERLY: EGB CONST. Figures trace to dpwh.
Total Contract Cost

