Flood Control and Drainage21NI0029

CONSTRUCTION OF SHORELINE PROTECTION AT POBLACION, LINGIG, SURIGAO DEL SUR

CONSTRUCTION OF SHORELINE PROTECTION AT POBLACION, LINGIG, SURIGAO DEL SUR is a DPWH-tracked public work in Surigao del Sur 2nd DEO, Region XIII. Reported contract value: ₱46,711,812.57. Status: Reported complete (DPWH). Contractor on record: O G SANTOS CONST. Figures trace to dpwh.

Surigao del Sur 2nd DEO, Region XIII
Region: Region XIII

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱23,100 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROIVA-21-0008181 · ₱911,537,000 · release to the district office, not itemized per project

    Possible match · score 0.67

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21NI0029 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-05-14 → 2025-10-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    CY2023 · other

    Confirmed (exact contract ID) · score 1.00

    COA AAR source ↗

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF SHORELINE PROTECTION AT POBLACION, LINGIG, SURIGAO DEL SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱23,100,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Ombong Flood Control, Alegria, Surigao del Norte
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIVA-21-0008181

₱911,537,000.00 · FY2021

Released to Rizal 1st District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱46,711,812.57

Progress

Reported complete (DPWH)

Start Date

March 26, 2021

Target End

January 21, 2022

5. Audit

Confirmed (exact contract ID) · 100%

COA observation (CY2023 audit, Par. 16 Technical defects/deficiencies in infrastructure projects). DPWH's action-plan response to this observation names Contract ID 21NI0029, p. 283. Excerpt: "Contract ID No. 21NI0029 with deficiency amounting to ₱ 1,952,206.62."

CY2023 · p.283

Connected records

Where this project sits

Place (PSGC)
Region XIII (Caraga)Surigao del SurLingig
Storms whose wind field reached it
Koto 2025Jelawat 2023
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.