Flood Control and Drainage20PG0032

CONSTRUCTION OF BANAO FLOOD CONTROL (TUNGNGOD SIDE), LAGAWE, IFUGAO

CONSTRUCTION OF BANAO FLOOD CONTROL (TUNGNGOD SIDE), LAGAWE, IFUGAO is a DPWH-tracked public work in Ifugao 1st DEO, Cordillera Administrative Region. Reported contract value: ₱16,091,021.82. Status: Reported complete (DPWH). Contractor on record: CJ ALCONS CONST. Figures trace to dpwh.

Ifugao 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱17,000

    Probable match · score 0.95

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-20-0000030 · · release to the district office, not itemized per project

    Possible match · score 0.62

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20PG0032 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-05-26 → 2025-04-12

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Ifugao

Based on the coordinates published with the DPWH record and NOAH file Ifugao.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF BANAO FLOOD CONTROL (TUNGNGOD SIDE), LAGAWE, IFUGAO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 95%

UACS
18001
Amount
₱17,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Banao Flood Control (Tungngod Side), Lagawe, Ifugao
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-20-0000030

₱-126,538.00 · FY2020

Released to Intramuros Administration (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

45 projects · ₱638.3M total · 0 flags

Other projects by this contractor

No sat.

25PJ0033: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF BRIDGE, (MINANGA) ALONG STA. MARIA - SAN MARCOS, ALFONSO

Ifugao 2nd DEO, Cordillera Administrative Region

2025₱77.2M
Past target date (DPWH On-Going)
No sat.

25PJ0028: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STA. 52+500 - STA. 53+400 (L/S), ALIMIT, MAYOYAO, IFUGAO

Ifugao 2nd DEO, Cordillera Administrative Region

2025₱75.6M
Past target date (DPWH On-Going)
No sat.

24PJ0042-CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF MINANGNGA BRIDGE, AL

Ifugao 2nd DEO, Cordillera Administrative Region

2024₱34.3M
Reported complete (DPWH)
No sat.

23PJ0039: CONVERGENCE AND SPECIALSUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADSCONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES-CONSTRUCTION OFROAD, AWAN-IGID, VIEWPO

Ifugao 2nd DEO, Cordillera Administrative Region

2023₱31.4M
Reported complete (DPWH)
No sat.

LAGAWE-BOLIWONG-ABINUAN ROAD LEADING TO INCHANG FALLS LAGAWE, IFUGAO

Ifugao 1st DEO, Cordillera Administrative Region

2020₱29.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF LAMUT FLOOD CONTROL, LAMUT, IFUGAO

Ifugao 1st DEO, Cordillera Administrative Region

2020₱26.9M
Reported complete (DPWH)
View all 45 projects →

4. Implementation

Contract Amount

₱16,091,021.82

Progress

Reported complete (DPWH)

Start Date

March 10, 2020

Target End

October 5, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)IfugaoLagaweTungngod
Storms whose wind field reached it
Peilou 2026Fung-Wong 2025Matmo 2025Ragasa 2025Mitag 2025
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.