Flood Control and Drainage17BI0097

CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES ALONG MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CAGAYAN RIVER BASIN-CONSTRUCTION OF STA. CRUZ RIVER CONTROL, SALINAS SECTION (PHASE II), BAMBANG, NUEVA VIZCAYA

CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES ALONG MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CAGAYAN RIVER BASIN-CONSTRUCTION OF STA. CRUZ RIVER CONTROL, SALINAS SECTION (PHASE II), BAMBANG, NUEVA VIZCAYA is a DPWH-tracked public work in Nueva Vizcaya DEO, Region II. Reported contract value: ₱9,281,370.00. Status: Reported complete (DPWH). Contractor on record: EDWIN ERWIN SISON CONST. Figures trace to dpwh.

Nueva Vizcaya DEO, Region II
Region: Region II

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIII-17-0018967 · ₱105,598 · release to the district office, not itemized per project

    Possible match · score 0.62

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱9,281,370 · EDWIN ERWIN SISON CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-04-03 → 2022-06-14

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Nueva Vizcaya

Based on the coordinates published with the DPWH record and NOAH file NuevaVizcaya.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES ALONG MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CAGAYAN RIVER BASIN-CONSTRUCTION OF STA. CRUZ RIVER CONTROL, SALINAS SECTION (PHASE II), BAMBANG, NUEVA VIZCAYA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Project along Apian River protecting Jct. Lamo-Malasin Road (Barangay Lamo Section), Dupax del Norte, Nueva Vizcaya
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIII-17-0018967

₱105,598.00 · FY2017

Released to Anao National High Fu School (7 (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction/Rehabilitation of Flood Mitigation Fa

₱9,281,370.00 · EDWIN ERWIN SISON CONSTRUCTION

Award / contract ref: 17BI0097

4. Implementation

Contract Amount

₱9,281,370.00

Progress

Reported complete (DPWH)

Start Date

September 13, 2017

Target End

December 27, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)Nueva VizcayaBambangSalinas
Storms whose wind field reached it
Peilou 2026Fung-Wong 2025Fengshen 2025Matmo 2025Mitag 2025
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.