Construction of Bateria River Flood Control, Tubigon, Bohol
Construction of Bateria River Flood Control, Tubigon, Bohol is a DPWH-tracked public work in TUBIGON (BOHOL), BOHOL, Region VII. Reported contract value: ₱69,866,876.96. Status: Reported complete (DPWH). Contractor on record: BNYU DEVELOPMENT CORP FORMERLY:BNYU ENT & CONST. Figures trace to sumbong.
Total Contract Cost
