Construction of Flood Mitigation Structure23HJ0051

Construction of Flood Control Structure along Pinocawan River, Barangay Bagawines, Vallehermoso, Negros Oriental

Construction of Flood Control Structure along Pinocawan River, Barangay Bagawines, Vallehermoso, Negros Oriental is a DPWH-tracked public work in VALLEHERMOSO (NEGROS ORIENTAL), NEGROS ORIENTAL, Region VII. Reported contract value: ₱72,375,000.00. Status: Reported complete (DPWH). Contractor on record: LEGACY CONST CORP FORMERLY: LEGACY CONST / MIGHTY HOK SUMMIT CONST & DEVELOPMENT CORP. Figures trace to sumbong.

VALLEHERMOSO (NEGROS ORIENTAL), NEGROS ORIENTAL, Region VII
Region: Region VII

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱40,000

    Probable match · score 0.92

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱71,586,231 · LEGACY CONSTRUCTION /MIGHTY HOK SUMMIT CONSTRUCTION AND DEVELOPMENT JOINT VENTURE

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-05-15 → 2018-05-15

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Negros Oriental

Based on the coordinates published with the DPWH record and NOAH file NegrosOriental.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Flood Control Structure along Pinocawan River, Barangay Bagawines, Vallehermoso, Negros Oriental

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 92%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Pangaloan River (Upstream), Jimalalud, Negros Oriental
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Negros Oriental 1st District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

CONSTRUCTION PROJECTS

₱71,586,231.00 · LEGACY CONSTRUCTION /MIGHTY HOK SUMMIT CONSTRUCTION AND DEVELOPMENT JOINT VENTURE

Award / contract ref: 23HJ0051

Contractor

B

8 projects · ₱430.8M total · 3 flags

4. Implementation

Contract Amount

₱72,375,000.00

Progress

Reported complete (DPWH)

Start Date

February 7, 2023

Target End

November 7, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)Negros OrientalVallehermosoBagawines
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Active faultDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.