Flood Control and Drainage18HH0005

CONSTRUCTION / MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AT BRGY. COGON PARDO, CEBU CITY

CONSTRUCTION / MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AT BRGY. COGON PARDO, CEBU CITY is a DPWH-tracked public work in Cebu City DEO, Region VII. Reported contract value: ₱3,810,120.00. Status: Reported complete (DPWH). Contractor on record: GOWIL BUILDERS. Figures trace to dpwh.

Cebu City DEO, Region VII
Region: Region VII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2018 · ₱4,000

    Probable match · score 0.91

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-18-0032654 · ₱214,303 · release to the district office, not itemized per project

    Possible match · score 0.69

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18HH0005 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-03-17 → 2025-01-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Cebu

Based on the coordinates published with the DPWH record and NOAH file Cebu.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION / MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AT BRGY. COGON PARDO, CEBU CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 91%

UACS
18001
Amount
₱4,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Maintenance of Flood Control Mitigation Structures at Brgy. Basak Pardo, Cebu City
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-18-0032654

₱214,303.00 · FY2018

Released to Minalabac National High De School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

54 projects · ₱690.9M total · 0 flags

Other projects by this contractor

No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG GUADALUPE RIVER, BAR

Cebu City DEO, Region VII

2024₱49.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

REHABILITAIONRECONSTRUCTIONUPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PMSHDM-4 OF CONSOLACION -TAYUD - LILOAN ROAD, CHAINAGE 950 - CHAINAGE 2823, CONSOLACION

Cebu 6th DEO, Region VII

2017₱44.9M
Reported complete (DPWH)
No sat.

Construction of Flood Mitigation Structure along Guadalupe River, Barangay Sambag 1, Cebu City

CEBU CITY (CAPITAL) (CEBU), CEBU, Region VII

2023₱44.0M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROADSYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE - SECONDARY ROADS - 8TH ST. -(S00022CB) CHAINAGE 0 - CHAINAGE 619, (S00384CB) CHAINAGE 0 - CHAINAGE 605, CEBU CITY

Cebu City DEO, Region VII

2022₱44.0M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG GUADALUPE RIVER, PACKAGE 2, BARANGAY SAPANGDAKU,

Cebu City DEO, Region VII

2025₱40.9M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE-TERTIARY ROADS- 5TH ST (S00047CB) CHAINAGE 209-CHAINAGE 424, (S00340CB) CHAINAGE 177-CHAINAGE 302, CEBU CITY

Cebu City DEO, Region VII

2023₱32.2M
Reported complete (DPWH)
View all 54 projects →

4. Implementation

Contract Amount

₱3,810,120.00

Progress

Reported complete (DPWH)

Start Date

March 19, 2018

Target End

June 24, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)City of CebuInayawan
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.