Bridges, Roads18DN0116

OO1 : NETWORK DEV'T. PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ANGONO-ANTIPOLO DIVERSION ROAD (ANGONO SECTION) INCL. BRIDGE, RIZAL, ANGONO, RIZAL

OO1 : NETWORK DEV'T. PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ANGONO-ANTIPOLO DIVERSION ROAD (ANGONO SECTION) INCL. BRIDGE, RIZAL, ANGONO, RIZAL is a DPWH-tracked public work in Rizal 1st DEO, Region IV-A. Reported contract value: ₱96,499,995.91. Status: Reported complete (DPWH). Contractor on record: R A PAHATI CONST & SUPPLY INC. Figures trace to dpwh.

Rizal 1st DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-E-18-0015878 · ₱500,000 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18DN0116 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-06-07 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: OO1 :  NETWORK DEV'T. PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ANGONO-ANTIPOLO DIVERSION ROAD (ANGONO SECTION) INCL. BRIDGE, RIZAL, ANGONO, RIZAL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Improvement/Riprapping of Diversion Channel, Brgy. San Juan, Taytay, Rizal
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-E-18-0015878

₱500,000.00 · FY2018

Released to Rizal 1st DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

89 projects · ₱7.3B total · 11 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRIDGE, ELISEO TRINIDAD ANGELES BRIDGE CROSSING PAMPANGA RIVER, SA

Nueva Ecija 2nd DEO, Region III

2024₱235.2M
Past target date (DPWH On-Going)
No sat.

ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF FLYOVERS / INTERCHANGES / UNDERPASSES / LONG SPAN BRIDGES MOLINO-DAANG HARI FLYOVER, INCL. ROW (PHASE II), CAVITE

Region IV-A, Region IV-A

2018₱230.0M
Reported complete (DPWH)
No sat.

MFO-1 NAT'L. ROAD NETWORK SERVICES, NETWORK DEV'T., CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES, FLYOVER AT MOLINO-DAANG HARI ROAD INTERSECTION, CAVITE 2ND L.D. CAVITE PROVINCE

Region IV-A, Region IV-A

2016₱204.2M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ELISEO TRINIDAD ANGELES BRIDGE ALONG PAMPANGA RIVER (PHASE III), S

Nueva Ecija 2nd DEO, Region III

2024₱190.1M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-WIDENING OF PERMANENT BRIDGES INCLUDING ROW, TO MORE THAN 2-LANES, DONA JOSEFA BRIDGE (BO1310LZ) ALONG DAANG MAHARLIKA (LZ), NUEVA ECIJA 4TH LEGISLATIVE DISTRICT, PROVINCE OF NUEVA ECIJA

Region III, Region III

2017₱187.2M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL BRIDGES - CONSTRUCTION OF THE ELISEO TRINIDAD ANGELES BRIDGE ALONG PAMPANGA RIVER, NUEVA ECIJA

Nueva Ecija 2nd DEO, Region III

2021₱183.3M
Reported complete (DPWH)
View all 89 projects →

4. Implementation

Contract Amount

₱96,499,995.91

Progress

Reported complete (DPWH)

Start Date

March 5, 2018

Target End

June 27, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)RizalAngonoSan Isidro
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.