Flood Control and Drainage19PC0104

REHABILITATION OF SWAN FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER SWAN, PUDTOL, APAYAO

REHABILITATION OF SWAN FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER SWAN, PUDTOL, APAYAO is a DPWH-tracked public work in Apayao 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱69,764,364.99. Status: Reported complete (DPWH). Contractor on record: ASC CONST. Figures trace to dpwh.

Apayao 2nd DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXIII-19-0006576

₱44,912,000.00 · FY2019

Released to Apayao 2nd DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

67 projects · ₱2.3B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM, PAVING OF UNPAVED-TERTIARY ROADS

Apayao 1st DEO, Cordillera Administrative Region

2024₱106.6M
Reported complete (100% progress, DPWH status On-Going)
No sat.

OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF SLOPE PROTECTION ALONG CALOG CREEK(TRIBUTARY OF APAYAO-ABULUG RIVER BASIN), BRGY CAPAGA

Apayao 2nd DEO, Cordillera Administrative Region

2024₱96.5M
Past target date (DPWH On-Going)

CONSTRUCTION OF BAROCBOC FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER, STA. 20+135-STA. 20 +613(L/S), STA. MARCELA, APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2021₱96.5M
Reported complete (DPWH)

CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER BASIN, BAROCBOC-SAN MARIANO, STA. MARCELA, APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2023₱96.5M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS-ADAMS (ILOCOS NORTE)-CALANASAN (APAYAO) ROAD, APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2021₱96.4M
Reported complete (DPWH)

CONSTRUCTION OF BAROCBOC FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER (STA 0+000-STA0+500), BAROCBOC, STA. MARCELA, APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2019₱93.6M
Reported complete (DPWH)
View all 67 projects →

4. Implementation

Contract Amount

₱69,764,364.99

Progress

Reported complete (DPWH)

Start Date

December 9, 2019

Target End

September 28, 2020

5. Audit