CONSTRUCTION OF TINEG RIVER FLOOD CONTROL (POB. DOLORES SIDE) STA. 0+500-STA. 2+550, STA. 3+100-STA. 4+248, DOLORES, ABRA
CONSTRUCTION OF TINEG RIVER FLOOD CONTROL (POB. DOLORES SIDE) STA. 0+500-STA. 2+550, STA. 3+100-STA. 4+248, DOLORES, ABRA is a DPWH-tracked public work in Abra DEO, Cordillera Administrative Region. Reported contract value: ₱48,997,000.00. Status: Reported complete (DPWH). Contractor on record: PHESCO INC 145. Figures trace to dpwh.
Total Contract Cost

