Rehabilitation / Major Repair of Flood Control Structure22HJ0090

Repair/Rehabilitation of Seawall along Dumaguete North Road, K0063+525 - K0063+584.60, Malaga, Bindoy, Negros Oriental

Repair/Rehabilitation of Seawall along Dumaguete North Road, K0063+525 - K0063+584.60, Malaga, Bindoy, Negros Oriental is a DPWH-tracked public work in BINDOY (PAYABON) (NEGROS ORIENTAL), NEGROS ORIENTAL, Region VII. Reported contract value: ₱3,930,850.34. Status: Reported complete (DPWH). Contractor on record: MAI CONST & SUPPLY. Figures trace to sumbong.

BINDOY (PAYABON) (NEGROS ORIENTAL), NEGROS ORIENTAL, Region VII
Region: Region VII

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱36,981

    Probable match · score 0.87

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-22-0002992 · ₱270,000,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱3,930,000 · MAI CONSTRUCTION AND SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-01-18 → 2025-10-23

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱65,954 per linear m= 0.5x the Region VII median (n=64)

Contract cost ₱3,930,850 ÷ 59.6 linear m read from the DPWH title (“K0063+525 - K0063+584.60”; station range length (Sta. a+b to c+d)). National percentile: 22. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Negros Oriental

Based on the coordinates published with the DPWH record and NOAH file NegrosOriental.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Repair/Rehabilitation of Seawall along Dumaguete North Road, K0063+525 - K0063+584.60, Malaga, Bindoy, Negros Oriental

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱36,981,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control along La Libertad River, Sta. 0+000 - Sta. 2+250, La Libertad, Negros Oriental
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0002992

₱270,000,000.00 · FY2022

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱3,930,850.34

Progress

Reported complete (DPWH)

Start Date

June 6, 2022

Target End

August 11, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)Negros OrientalBindoyMalaga
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.