Buildings and Facilities19PD0120

LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPOSE BUILDING (SENIOR CITIZEN) BARANGAY FAIRVIEW, BAGUIO CITY, BENGUET

LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPOSE BUILDING (SENIOR CITIZEN) BARANGAY FAIRVIEW, BAGUIO CITY, BENGUET is a DPWH-tracked public work in Baguio City DEO, Cordillera Administrative Region. Reported contract value: ₱1,980,000.00. Status: Reported complete (DPWH). Contractor on record: JJJ-A CONST AND SUPPLIES. Figures trace to dpwh.

Baguio City DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-BMB-A-19-0026253 · ₱61,610 · release to the district office, not itemized per project

    Possible match · score 0.71

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱1,843,231 · JJJ-A CONSTRUCTION AND SUPPLIES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-03-04 → 2025-08-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPOSE BUILDING (SENIOR CITIZEN) BARANGAY FAIRVIEW, BAGUIO CITY, BENGUET

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-A-19-0026253

₱61,610.00 · FY2019

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Civil Works

₱1,843,230.89 · JJJ-A CONSTRUCTION AND SUPPLIES

Award / contract ref: 19PD0120

Contractor

B

17 projects · ₱150.0M total · 0 flags

Other projects by this contractor

No sat.

NATIONAL DISASTER RISK REDUCTION AND MANAGEMENT FUND (CALAMITY FUND)- RECONSTRUCTION, REHABILITATION , REPAIR, AID, RELIEF AND OTHER WORKS OR SERVICES, INCLUDING PRE-DISASTER ACTIVITIES: IMPLEMENTATION OF VARIOUS FLOOD CONTROL PROJECTS IN MOUNTAIN PROVINC

Mountain Province 1st DEO, Cordillera Administrative Region

2017₱89.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMICZONES, BILA-BAGNEN ORIENTE ROAD IN SUPPORT TO AGRIBUSINESS, COFFEE AND FOOD PROCESSING INDUSTRIES, BAUKO, MOUNTAIN PROVINCE

Mountain Province 1st DEO, Cordillera Administrative Region

2018₱23.6M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ROAD LOCATED AT PUROK 2, MONTICELLO, BARANGAY CAMP 7, BAGUIO CITY

Baguio City DEO, Cordillera Administrative Region

2022₱4.7M
Reported complete (DPWH)
No sat.

LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ROAD AT LOT 2 AND 3, CYPRESS, PUROK 14, IRISAN BARANGAY, BAGUIO CITY

Baguio City DEO, Cordillera Administrative Region

2021₱3.8M
Reported complete (DPWH)
No sat.

LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF 2-STOREY FOUR CLASSROM SCHOOL BUILDING AT DONA AURORA NATIONAL HIGH SCHOOL, BARANGAY LOPEZ JAENA, BAGUIO CITY, BENGUET

Baguio City DEO, Cordillera Administrative Region

2019₱3.7M
Reported complete (DPWH)
No sat.

LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ROAD AND RIPRAP ALONG CLEMENT ABAD RESIDENCE AT PUROK 3 LOAKAN-APUGAN BARANGAY, BAGUIO CITY

Baguio City DEO, Cordillera Administrative Region

2021₱2.8M
Reported complete (DPWH)
View all 17 projects →

4. Implementation

Contract Amount

₱1,980,000.00

Progress

Reported complete (DPWH)

Start Date

August 11, 2019

Target End

December 3, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)City of BaguioFairview Village
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.