Construction of Flood Mitigation Structure23HJ0064

Construction of Flood Control along Tinaogan, Bindoy, Negros Oriental

Construction of Flood Control along Tinaogan, Bindoy, Negros Oriental is a DPWH-tracked public work in BINDOY (PAYABON) (NEGROS ORIENTAL), NEGROS ORIENTAL, Region VII. Reported contract value: ₱29,400,000.00. Status: Reported complete (DPWH). Contractor on record: RCODE BUILDERS AND AGGREGATES SUPPLY. Figures trace to sumbong.

BINDOY (PAYABON) (NEGROS ORIENTAL), NEGROS ORIENTAL, Region VII
Region: Region VII

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱30,000

    Probable match · score 1.00

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱26,849,798 · RCODE BUILDERS AND AGGREGATE SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-07-25 → 2015-07-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Negros Oriental

Based on the coordinates published with the DPWH record and NOAH file NegrosOriental.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Flood Control along Tinaogan, Bindoy, Negros Oriental

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 100%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control along Tinaogan, Bindoy, Negros Oriental
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Negros Oriental 1st District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction Project

₱26,849,797.59 · RCODE BUILDERS AND AGGREGATE SUPPLY

Award / contract ref: 23HJ0064

Contractor

B

29 projects · ₱160.5M total · 2 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-IMPROVEMENT OF CANDABONG-CABCABAN ROAD CONNEC

Negros Oriental 1st DEO, Negros Island Region

2025₱19.6M
Reported complete (100% progress, DPWH status On-Going)
No sat.

Construction of Flood Control along Tinaogan, Bindoy, Negros Oriental

BINDOY (PAYABON) (NEGROS ORIENTAL), NEGROS ORIENTAL, Region VII

2024₱18.8M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY TINAOGAN, BINDOY, NE

Negros Oriental 1st DEO, Negros Island Region

2025₱16.6M
Reported complete (100% progress, DPWH status On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT/ EVACUATION CENTER), SACSAC ELEMENTARY SCHOOL, BARANGAY SACSAC, MANJUYOD, NEGROS ORIENTAL

Negros Oriental 1st DEO, Negros Island Region

2024₱5.0M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM: EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES - CONSTRUCTION OF EVACUATION CENTERS / COVERED COURT, MANLUMINSAG, LA LIBERTAD, NEGROS ORIENTAL

Negros Oriental 1st DEO, Negros Island Region

2024₱4.9M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MULTI-PURPOSE BUILDING AT AWA-AN, AYUNGON, NEGROS ORIENTAL

Negros Oriental 1st DEO, Negros Island Region

2019₱4.9M
Reported complete (DPWH)
View all 29 projects →

4. Implementation

Contract Amount

₱29,400,000.00

Progress

Reported complete (DPWH)

Start Date

March 7, 2023

Target End

December 31, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)Negros OrientalBindoyTinaogan
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.